Water meters - Part 2: Installation and conditions of use

This document specifies criteria for selection of water meters, installation requirements and the first operation of new or repaired meters to ensure accurate constant measurement and reliable reading of the meter.
In applications where a water meter is legally required to conform to the requirements of the Measuring Instruments Directive, this document may be used to demonstrate conformity.
Where legal national requirements exist they shall in all cases take precedence over or supplement the specifications given in this part of this document.

Wasserzähler - Teil 2: Einbau und Voraussetzungen für die Verwendung

Dieses Dokument legt Kriterien für die Auswahl von Wasserzählern, Bedingungen für deren Einbau und die Inbetriebnahme von neuen oder reparierten Zählern fest, um eine genaue konstante Messung und zuverlässige Ablesung der Zähler zu gewährleisten.
Bei Anwendungen, bei denen gesetzlich gefordert wird, dass ein Wasserzähler den Anforderungen der EU-Messgeräterichtlinie MID entspricht, kann das vorliegende Dokument als Konformitätsnachweis verwendet werden.
Dort, wo gesetzliche nationale Anforderungen vorliegen, haben sie auf alle Fälle Vorrang vor den Bestimmungen dieses Teils des vorliegenden Dokuments, oder sie bilden eine Ergänzung dazu.

Compteurs d'eau - Partie 2: Installation et conditions d'utilisation

Vodomeri – 2. del: Vgradnja in pogoji uporabe

General Information

Status
Withdrawn
Publication Date
10-Apr-2007
Withdrawal Date
05-Apr-2011
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
06-Apr-2011
Completion Date
06-Apr-2011

Relations

Buy Standard

Standard
EN 14154-2:2005+A1:2007
English language
20 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Water meters - Part 2: Installation and conditions of useVodomeri – 2. del: Vgradnja in pogoji uporabeCompteurs d'eau - Partie 2: Installation et conditions d'utilisationWasserzähler - Teil 2: Einbau und Voraussetzungen für die VerwendungTa slovenski standard je istoveten z:EN 14154-2:2005+A1:2007SIST EN 14154-2:2005+A1:2007en;fr;de91.140.60Sistemi za oskrbo z vodoWater supply systemsICS:SIST EN 14154-2:20051DGRPHãþDSLOVENSKI
STANDARDSIST EN 14154-2:2005+A1:200701-junij-2007

EUROPEAN STANDARD NORME EUROPÉENNE EUROPÄISCHE NORM
EN 14154-2:2005+A1
April 2007 ICS 91.140.60 Supersedes EN 14154-2:2005English Version
Water meters - Part 2: Installation and conditions of use
Compteurs d'eau - Partie 2: Installation et conditions d'utilisation
Wasserzähler -Teil 2: Einbau und Voraussetzungen für die Verwendung This European Standard was approved by CEN on 26 August 2004 and includes Amendment 1 approved by CEN on 6 March 2007.
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN Management Centre or to any CEN member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION EUROPÄISCHES KOMITEE FÜR NORMUNG
Management Centre: rue de Stassart, 36
B-1050 Brussels © 2007 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 14154-2:2005+A1:2007: E

Examples of Concentric Manifold Solutions.14 Annex ZA (informative)
!!!!Relationship between this European Standard and the Essential Requirements of EU Directive 22/2004/EC on Measuring Instruments.16 Bibliography.19

 combination meters, care should be taken that 'cross-over' flowrates are different from (and below) normal operating flowrates;  available supply pressure;  physical and chemical characteristics of the water;  possibility of deposition of substances from solution within the water meter;  acceptable pressure loss across the meter;  available space and pipe work to install the meter and fittings;  sustainability of the power supply of the water meter (where applicable). 4.2 Information to be provided by the manufacturer The manufacturer shall supply sufficient information to enable the correct choice and installation of a meter: such that influencing factors shall not lead to either failure or non conformance with the specified metrological characteristics. This is particularly important for hydraulic disturbances. Specifically, the manufacturer shall determine the influence factors, which affect the indicating error and state of the individual meter design. For each influence factor the manufacturer shall state the relevant rated operating conditions applicable to the meter. 4.3 Meters operating in parallel or in a group For meters operating in parallel, means shall be provided so that the unserviceability of one or more meters within a group shall not cause the remaining meters to operate at a flowrate in excess of each individual meter’s limit of operation. In order to ensure that water meters of different types will operate satisfactorily in parallel, the individual characteristics of all the meters operating in parallel shall be compatible. This may be achieved, for example, by grouping them according to pressure loss, flowrate range and maximum working pressure. However, the installation conditions for each type shall be respected. For meters operating in parallel and multiple meter operation, the possibilities of interaction between one meter or meter type and another, to the detriment of their life and accuracy shall be considered; for example pressure surges and vibration.
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.