IEC PAS 62408:2005
(Main)Real-time Ethernet Powerlink (EPL)
Real-time Ethernet Powerlink (EPL)
It extends Ethernet according to the IEEE 802.3/ISO/IEC 8802-3 standard with mechanisms to transfer data with predictable timing and precise synchronisation. The communication profile meets timing demands typical for high-performance automation and motion applications. It does not change basic principles of the Fast Ethernet Standard IEEE 802.3 but extends it towards RTE. Thus it is possible to leverage and continue to use any standard Ethernet silicon, infrastructure component or test and measurement equipment like a network analyzer.
General Information
Relations
Standards Content (Sample)
PUBLICLY
IEC
AVAILABLE
PAS 62408
SPECIFICATION
First edition
2005-06
Real-time Ethernet Powerlink (EPL)
Reference number
IEC/PAS 62408:2005(E)
Publication numbering
As from 1 January 1997 all IEC publications are issued with a designation in the
60000 series. For example, IEC 34-1 is now referred to as IEC 60034-1.
Consolidated editions
The IEC is now publishing consolidated versions of its publications. For example,
edition numbers 1.0, 1.1 and 1.2 refer, respectively, to the base publication, the
base publication incorporating amendment 1 and the base publication incorporating
amendments 1 and 2.
Further information on IEC publications
The technical content of IEC publications is kept under constant review by the IEC,
thus ensuring that the content reflects current technology. Information relating to
this publication, including its validity, is available in the IEC Catalogue of
publications (see below) in addition to new editions, amendments and corrigenda.
Information on the subjects under consideration and work in progress undertaken
by the technical committee which has prepared this publication, as well as the list
of publications issued, is also available from the following:
• IEC Web Site (www.iec.ch)
• Catalogue of IEC publications
The on-line catalogue on the IEC web site (www.iec.ch/searchpub) enables you to
search by a variety of criteria including text searches, technical committees
and date of publication. On-line information is also available on recently issued
publications, withdrawn and replaced publications, as well as corrigenda.
• IEC Just Published
This summary of recently issued publications (www.iec.ch/online_news/ justpub)
is also available by email. Please contact the Customer Service Centre (see
below) for further information.
• Customer Service Centre
If you have any questions regarding this publication or need further assistance,
please contact the Customer Service Centre:
Email: custserv@iec.ch
Tel: +41 22 919 02 11
Fax: +41 22 919 03 00
PUBLICLY
IEC
AVAILABLE
PAS 62408
SPECIFICATION
First edition
2005-06
Real-time Ethernet Powerlink (EPL)
© IEC 2005 – Copyright - all rights reserved
No part of this publication may be reproduced or utilized in any form or by any means, electronic or
mechanical, including photocopying and microfilm, without permission in writing from the publisher.
International Electrotechnical Commission, 3, rue de Varembé, PO Box 131, CH-1211 Geneva 20, Switzerland
Telephone: +41 22 919 02 11 Telefax: +41 22 919 03 00 E-mail: inmail@iec.ch Web: www.iec.ch
PRICE CODE
Commission Electrotechnique Internationale
XH
International Electrotechnical Commission
Международная Электротехническая Комиссия
For price, see current catalogue
– 2 – PAS 62408 © IEC:2005 (E)
CONTENT
FOREWORD . 14
1 General . 15
1.1 Scope and general description . 15
1.1.1 Slot Communication Network Management (SCNM) . 15
1.1.2 EPL key features. 16
1.1.3 Integration .17
1.1.4 Modular Machines. 18
1.2 Normative references. 19
1.3 Definitions and Abbreviations . 20
1.3.1 Definitions .20
1.3.2 Abbreviations . 23
2 Modelling. 24
2.1 Reference Model. 24
2.1.1 Application Layer . 24
2.1.1.1 Service Primitives . 25
2.1.1.2 Application Layer Service Types . 25
2.2 Device Model . 26
2.2.1 General .26
2.2.2 The Object Dictionary . 27
2.2.2.1 Index and Sub-Index Usage . 28
2.3 Communication Model . 28
2.3.1 Master/Slave relationship . 28
2.3.2 Client/Server relationship. 29
2.3.3 Producer/Consumer relationship - Push/Pull model. 30
2.3.4 Superimposing of Communication Relationships . 30
3 Physical Layer. 31
3.1 Topology . 31
3.1.1 Hubs. 31
3.1.2 Switches.31
3.2 Network Guidelines. 31
3.3 Connectors.32
3.3.1 RJ-45 . 32
3.3.2 M12 . 32
3.3.3 Cross Over Pin Assignment. 33
3.3.3.1 RJ45 to RJ45 . 33
3.3.3.2 M12 to M12. 34
3.3.3.3 M12 to RJ45. 34
3.4 Cables (recommendation). 34
4 Data Link Layer.35
4.1 Modes of Operation . 35
4.2 EPL Mode . 35
4.2.1 Introduction . 35
4.2.2 EPL Nodes. 35
4.2.2.1 EPL Managing Node. 35
4.2.2.2 EPL Controlled Node . 36
4.2.2.2.1 Isochronous CN . 36
4.2.2.2.2 Async-only CN . 36
4.2.3 Services .36
4.2.4 EPL Cycle . 36
4.2.4.1 Isochronous EPL Cycle . 36
4.2.4.1.1 Start period . 37
4.2.4.1.2 Isochronous period . 37
4.2.4.1.2.1 Multiplexed Timeslots . 38
4.2.4.1.3 Asynchronous period. 38
4.2.4.1.3.1 Asynchronous Scheduling . 39
PAS 62408 © IEC:2005 (E) – 3 –
4.2.4.1.3.2 Asynchronous Transmit Priorities. 40
4.2.4.1.3.3 Distribution of the Asynchronous period. 40
4.2.4.1.4 Idle Period. 40
4.2.4.2 Reduced EPL Cycle. 40
4.2.4.3 EPL CN Cycle State Machine. 41
4.2.4.3.1 Overview. 41
4.2.4.3.2 States. 41
4.2.4.3.3 Events. 41
4.2.4.3.4 Usage of the the NMT_CS state by the DLL_CS . 42
4.2.4.3.4.1 State NMT_CS_OPERATIONAL, NMT_CS_PRE_OPERATIONAL_2,
NMT_CS_READY_TO_OPERATE . 42
4.2.4.3.4.1.1 Transitions . 43
4.2.4.3.4.2 Other States. 44
4.2.4.3.4.2.1 Transitions in other NMT states. 45
4.2.4.4 EPL MN Cycle State Machine . 45
4.2.4.4.1 Overview. 45
4.2.4.4.2 States. 45
4.2.4.4.3 Events. 45
4.2.4.4.4 Usage of the NMT_MS state by the DLL_MS . 46
4.2.4.4.4.1 State NMT_MS_OPERATIONAL . 46
4.2.4.4.4.1.1 Transitions . 48
4.2.4.4.4.2 Other Modes . 49
4.2.5 Recognizing Active Nodes. 49
4.3 Basic Ethernet Mode. 49
4.4 MAC Adressing . 50
4.4.1 MAC Unicast. 50
4.4.2 MAC Multicast. 50
4.4.3 MAC Broadcast. 50
4.5 EPL Addressing . 50
4.6 Frame Structures . 51
4.6.1 Integration with Ethernet. 51
4.6.1.1 EPL Frame. 51
4.6.1.1.1 EPL Basic Frame. 51
4.6.1.1.2 Start Of Cyclic (SoC) . 52
4.6.1.1.3 PollRequest (PReq) .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.