Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance

Corrigendum 1 - Connexions sans soudure - Partie 5: Connexions insérées à force - Exigences générales, méthodes d'essai et guide pratique

General Information

Status
Published
Publication Date
02-Sep-2014
Technical Committee
Current Stage
DELPUB - Deleted Publication
Completion Date
22-Jul-2020
Ref Project

Relations

Buy Standard

Standard
IEC 60352-5:2012/COR1:2014 - Corrigendum 1 - Solderless connections - Part 5: Press-in connections - General requirements, test methods and practical guidance Released:9/3/2014
English and French language
10 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


IEC 60352-5
(4th edition – 2012)
SOLDERLESS CONNECTIONS –
Part 5: Press-in connections –

General requirements, test methods and practical guidance

CO RRI G E NDUM 1
Replace existing Table 5 by the following new Table 5 :

Table 5 – Qualification test schedule – Test group C
Test Measurement to be performed Requirement
Test phase
Test No. of
Title Subclause Title Subclause
IEC 60512
CP1 Mounting 5.3.2.2
CP2 if applicable Replacement 5.2.2.6
CP3  Contact resistance 2a 5.2.3.1
– millivolt level
method
CP4 5.2.4.2 11d
Rapid change of
temperature
CP5 Climatic 5.2.4.3 11a
sequence
CP6 Dry heat 5.2.4.4 11i
CP7 No required tests and measurements
CP8  Contact resistance 2a 5.2.3.1
– millivolt level
method
a)
CP9 5.2.2.3 Push-out force 5.2.2.3 ,
minimum push-
out force per
termination
according to
4.6 e)
a)
The test for push-out force has to be performed on 14 of the 200 terminations, 7 of them out of range a and 7 of
them out of range b.
Figure 9, in the bottom section of the flow chart, last column, delete:

"– Flowing mixed gas corrosion test"

September 2014
IEC 60352-5