(Main)Testing methods for pervious concrete — Part 2: Density and void content
Testing methods for pervious concrete — Part 2: Density and void content
This document specifies a procedure for testing the density and void content of freshly mixed and hardened pervious concrete specimens for pavement in the laboratory or cored from field placements. This document also specifies formulae for calculating the density and void content of pervious concrete.
Méthodes d'essai pour ciments perméables — Partie 2: Titre manque
General Information
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 17785-2
First edition
2018-05
Testing methods for pervious
concrete —
Part 2:
Density and void content
Méthodes d'essai pour ciments perméables —
Partie 2: Titre manque
Reference number
ISO 17785-2:2018(E)
©
ISO 2018
---------------------- Page: 1 ----------------------
ISO 17785-2:2018(E)
COPYRIGHT PROTECTED DOCUMENT
© ISO 2018
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Fax: +41 22 749 09 47
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2018 – All rights reserved
---------------------- Page: 2 ----------------------
ISO 17785-2:2018(E)
Contents Page
Foreword .iv
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Principle . 1
4.1 Freshly mixed pervious concrete . 1
4.2 Hardened pervious concrete . 2
5 Apparatus . 2
6 Sampling . 3
7 Procedure. 3
7.1 Freshly mixed pervious concrete . 3
7.1.1 Filling . 3
7.1.2 Strike off . 3
7.1.3 Cleaning and weighing . 3
7.2 Hardened pervious concrete . 3
7.2.1 Moulded cylinder preparation . 3
7.2.2 Core preparation . 4
7.2.3 Measuring . 4
7.2.4 Constant dry mass . 4
7.2.5 Submerging.
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.