SIST-TS ISO/IEC TS 17035:2024
(Main)Conformity assessment - Guidelines for validation and verification programmes
Conformity assessment - Guidelines for validation and verification programmes
This document provides guidance to validation/verification programme owners, validation/verification bodies and interested parties on the development, content and operation of validation/verification programmes.
When implemented by validation/verification bodies, this document is intended to be used in conjunction with ISO/IEC 17029 and sector-specific applications of ISO/IEC 17029.
Évaluation de la conformité — Lignes directrices pour les programmes de validation et de vérification
Ugotavljanje skladnosti - Smernice za programe validacije in verifikacije
1.1 Ta dokument podaja smernice za lastnike programov validacije in verifikacije ter validacijske in verifikacijske organe v zvezi z razvojem, vsebino in delovanjem programov validacije in verifikacije.
1.2 Ta dokument se uporablja v povezavi s standardom ISO/IEC 17029 in sektorsko v skladu s standardom ISO/IEC 17029 ter v povezavi z drugimi programi za ugotavljanje skladnosti, na primer kot del dejavnosti vrednotenja v shemi za certificiranje izdelkov v skladu s standardom ISO/IEC 17065.
General Information
- Status
- Published
- Public Enquiry End Date
- 18-Jul-2024
- Publication Date
- 03-Oct-2024
- Technical Committee
- UGA - Conformity assessment
- Current Stage
- 6060 - National Implementation/Publication (Adopted Project)
- Start Date
- 21-Aug-2024
- Due Date
- 26-Oct-2024
- Completion Date
- 04-Oct-2024
Overview
ISO/IEC TS 17035:2024 - Conformity assessment - Guidelines for validation and verification programmes (Technical Specification, first edition) provides practical guidance for developing, operating and recognising validation/verification programmes. Designed to be used alongside ISO/IEC 17029, this TS clarifies programme content, governance and processes for bodies that issue validation statements or verification statements and for programme owners, regulators and other interested parties.
Key topics
The document organises guidance around programme design and operation, including:
Programme content
- Scope of validation/verification: definition and boundaries of claims to be validated or verified.
- Competence and impartiality: expectations for validation/verification bodies and personnel.
- Operational steps: recommended steps for planning and executing validation and verification activities.
- Evidence gathering activities: how bodies should collect, assess and use objective evidence (historical data for verification; projected data for validation).
- Reporting: structure and purpose of validation/verification statements and reports.
Programme development
- Guidance for creating rules, procedures and management systems for sector-specific or cross-sector programmes.
Programme maintenance and recognition
- Requirements for ongoing review, improvement and the process to recognise programmes (including informative annexes on logos/marks and recognition criteria).
Definitions and terms
- Clear terminology for claims, validation, verification, programme owner, validation/verification body, and statements-aligned with ISO/IEC 17029 and ISO/IEC 17000.
Applications
ISO/IEC TS 17035:2024 is practical for:
- Validation/verification bodies establishing or improving programme-aligned services.
- Programme owners (government agencies, trade associations, industry groups) developing sector schemes or rules.
- Accreditors and regulators assessing the adequacy of programme design and operation.
- Organisations seeking assurance over claims (environmental data, projected outcomes, product/system assertions) who want clarity on how independent validation or verification should be structured.
Use cases include verifying historical emissions data, validating projected performance claims, or creating a recognised scheme for recurring conformity assessments.
Related standards
- ISO/IEC 17029 - Principles and requirements for validation/verification bodies (primary normative reference).
- ISO 14065 - Sector-specific application (environmental verification/validation).
- ISO/IEC 17000 - Conformity assessment vocabulary and general principles.
Keywords: ISO/IEC TS 17035:2024, validation/verification programmes, conformity assessment, validation statement, verification statement, ISO/IEC 17029, programme owner, evidence gathering, reporting, competence, impartiality.
Frequently Asked Questions
SIST-TS ISO/IEC TS 17035:2024 is a technical specification published by the Slovenian Institute for Standardization (SIST). Its full title is "Conformity assessment - Guidelines for validation and verification programmes". This standard covers: This document provides guidance to validation/verification programme owners, validation/verification bodies and interested parties on the development, content and operation of validation/verification programmes. When implemented by validation/verification bodies, this document is intended to be used in conjunction with ISO/IEC 17029 and sector-specific applications of ISO/IEC 17029.
This document provides guidance to validation/verification programme owners, validation/verification bodies and interested parties on the development, content and operation of validation/verification programmes. When implemented by validation/verification bodies, this document is intended to be used in conjunction with ISO/IEC 17029 and sector-specific applications of ISO/IEC 17029.
SIST-TS ISO/IEC TS 17035:2024 is classified under the following ICS (International Classification for Standards) categories: 03.120.20 - Product and company certification. Conformity assessment. The ICS classification helps identify the subject area and facilitates finding related standards.
You can purchase SIST-TS ISO/IEC TS 17035:2024 directly from iTeh Standards. The document is available in PDF format and is delivered instantly after payment. Add the standard to your cart and complete the secure checkout process. iTeh Standards is an authorized distributor of SIST standards.
Standards Content (Sample)
SLOVENSKI STANDARD
01-november-2024
Ugotavljanje skladnosti - Smernice za programe validacije in verifikacije
Conformity assessment - Guidelines for validation and verification programmes
Évaluation de la conformité — Lignes directrices pour les programmes de validation et
de vérification
Ta slovenski standard je istoveten z: ISO/IEC TS 17035:2024
ICS:
03.120.20 Certificiranje proizvodov in Product and company
podjetij. Ugotavljanje certification. Conformity
skladnosti assessment
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
Technical
Specification
ISO/IEC TS 17035
First edition
Conformity assessment —
2024-09
Guidelines for validation and
verification programmes
Évaluation de la conformité — Lignes directrices pour les
programmes de validation et de vérification
Reference number
© ISO/IEC 2024
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
© ISO/IEC 2024 – All rights reserved
ii
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Validation/Verification programmes . 4
4.1 General .4
4.2 Programme content .5
4.2.1 Scope of validation/verification .5
4.2.2 Competence, impartiality and operation of validation/verification bodies .5
4.2.3 Steps for the validation/verification process .6
4.2.4 Evidence gathering activities .6
4.2.5 Reporting .7
4.3 Programme development . .7
4.4 Programme maintenance, review and improvement .8
5 Programme owner . 9
Annex A (informative) Clarification of logo/symbol/mark . 10
Annex B (informative) Recognition of validation/verification programmes .12
Annex C (informative) Questions to help recognize a validation/verification programme . 14
Bibliography . 17
© ISO/IEC 2024 – All rights reserved
iii
Foreword
ISO (the International Organization for Standardization) and IEC (the International Electrotechnical
Commission) form the specialized system for worldwide standardization. National bodies that are
members of ISO or IEC participate in the development of International Standards through technical
committees established by the respective organization to deal with particular fields of technical activity.
ISO and IEC technical committees collaborate in fields of mutual interest. Other international organizations,
governmental and non-governmental, in liaison with ISO and IEC, also take part in the work.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types
of document should be noted. This document was drafted in accordance with the editorial rules of the ISO/
IEC Directives, Part 2 (see www.iso.org/directives or www.iec.ch/members_experts/refdocs).
ISO and IEC draw attention to the possibility that the implementation of this document may involve the
use of (a) patent(s). ISO and IEC take no position concerning the evidence, validity or applicability of any
claimed patent rights in respect thereof. As of the date of publication of this document, ISO and IEC had not
received notice of (a) patent(s) which may be required to implement this document. However, implementers
are cautioned that this may not represent the latest information, which may be obtained from the patent
database available at www.iso.org/patents and https://patents.iec.ch. ISO and IEC shall not be held
responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT) see www.iso.org/iso/foreword.html.
In the IEC, see www.iec.ch/understanding-standards.
This document was prepared by the ISO Committee on Conformity Assessment (CASCO).
Any feedback or questions on this document should be directed to the user’s national standards
body. A complete listing of these bodies can be found at www.iso.org/members.html and
www.iec.ch/national-committees.
© ISO/IEC 2024 – All rights reserved
iv
Introduction
This document is aligned with ISO/IEC 17029 which provides principles and requirements for bodies
providing validation/verification services. ISO/IEC 17029 is a generic standard that can apply to validation/
verification bodies in any economic sector or industry. It is distinct from other standards for conformity
assessment bodies in that it requires the object of conformity to be a claim, and for this to be validated
and/or verified in accordance with a validation or verification programme. Validation/verification bodies
operating in accordance with ISO/IEC 17029 can provide services as first-, second- or third-party activities.
This document is also aligned with sector-specific applications of ISO/IEC 17029, such as ISO 14065 which
references the requirements of ISO/IEC 17029 and includes specific requirements related to bodies that
validate or verify environmental information.
To validate or verify a claim, validation/verification bodies must often review large amounts of data and
information, including aspects such as the suitability of the boundaries of the claim; the way data has been
defined, collected and recorded; how quantification and calculation methods that support the claim have
been undertaken; and provision of a professional judgement on matters that are material or significant to
the claim.
The issuance of a validation or verification statement will normally be a one-off attestation based on the
information available at that point in time. Validation/verification statements normally do not have a period
of validity associated with them. Each subsequent validation/verification is a new separate conformity
assessment and is not considered to be a surveillance activity that supports an original or previous
validation/verification statement.
The result of validation or verification activities will frequently be a validation or verification statement.
These statements normally provide an opinion from the validation or verification body on the plausibility
of a claim that is made about the future based on projected data (validation), or the truthfulness of the
claim based on historical data (verification). The results from a validation and verification programme can
sometimes be combined to support a claim (e.g. a mixed engagement or in the management of similar or
related programmes). Validation/verification bodies can also be asked to undertake a validation/verification
process and issue a report of their findings, but without any formal statement or opinion on the plausibility
or truthfulness of the claim being made.
NOTE This is often referred to undertaking validation or verification activities on the basis of Agreed Upon
Procedures (AUP).
Within ISO/IEC 17029, there is a requirement for validation/verification bodies to operate within the
context of at least one validation or verification programme. Within ISO/IEC 17029 requirements, there
are many references to validation/verification programmes, and it is expected that validation/verification
programmes give direction to the validation/verification body. The importance of appropriate validation/
verification programmes when undertaking validation/verification activities in accordance with
ISO/IEC 17029 is critical to the correct operation of this type of conformity assessment.
ISO/IEC 17029:2019, Annex A also provides a comprehensive informative list of elements to be considered in
the development and operation of validation/verification programmes. The content of ISO/IEC 17029:2019,
Annex A has been included and amplified in this document.
To assist in the development, operation and recognition of validation/verification programmes suitable for
use with ISO/IEC 17029, this document covers the following:
a) an overview of validation/verification programmes in the context of ISO/IEC 17029;
b) development of validation/verification programmes;
c) recognition of validation/verification programmes.
© ISO/IEC 2024 – All rights reserved
v
Technical Specification ISO/IEC TS 17035:2024(en)
Conformity assessment — Guidelines for validation and
verification programmes
1 Scope
This document provides guidance to validation/verification programme owners, validation/verification
bodies and interested parties on the development, content and operation of validation/verification
programmes.
When implemented by validation/verification bodies, this document is intended to be used in conjunction
with ISO/IEC 17029 and sector-specific applications of ISO/IEC 17029.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO/IEC 17000, Conformity assessment — Vocabulary and general principles
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO/IEC 17000 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1
claim
information declared by the client
Note 1 to entry: The claim is the object of conformity assessment by validation (3.2)/verification (3.3).
Note 2 to entry: The claim can represent a situation at a point in time or could cover a period of time.
Note 3 to entry: The claim should be clearly identifiable and capable of consistent evaluation or measurement against
specified requirements by a validation body (3.4)/verification body (3.5).
Note 4 to entry: The claim can be provided in the form of a report, a statement, a declaration, a project plan, or
consolidated data.
[SOURCE: ISO/IEC 17029:2019, 3.1]
3.2
validation
confirmation of a claim (3.1), through the provision of objective evidence, that the requirements for a specific
intended future use or application have been fulfilled
Note 1 to entry: Objective evidence can come from real or simulated sources.
Note 2 to entry: Validation is considered to be a process to evaluate the reasonableness of the assumptions, limitations,
and methods that support a claim about the outcome of future activities.
© ISO/IEC 2024 – All rights reserved
Note 3 to entry: Validation is applied to claims regarding an intended future use based on projected information
(confirmation of plausibility).
Note 4 to entry: In this document, the expression “validation/verification” means either validation or verification (3.3),
or both.
[SOURCE: ISO/IEC 17029:2019, 3.2, modified – The original Note 4 to entry has been deleted and a new Note
4 to entry has been added.]
3.3
verification
confirmation of a claim (3.1), through the provision of objective evidence, that specified requirements have
been fulfilled
Note 1 to entry: Verification is considered to be a process for evaluating a claim based on historical data and
information to determine whether the claim is materially correct and conforms with specified requirements.
Note 2 to entry: Verification is applied to claims regarding events that have already occurred or results that have
already been obtained (confirmation of truthfulness).
Note 3 to entry: In this document, the expression “validation/verification” means either validation (3.2) or verification,
or both.
[SOURCE: ISO/IEC 17029:2019, 3.3, modified – The original Note 3 to entry has been deleted and a new Note
3 to entry has been added.]
3.4
validation body
body that performs validation (3.2)
Note 1 to entry: A validation body can be an organization, or part of an organization.
Note 2 to entry: In this document, the expression “validation/verification body” means either validation body or
verification body (3.5), or both.
[SOURCE: ISO/IEC 17029:2019, 3.4, modified – Note 2 to entry has been added.]
3.5
verification body
body that performs verification (3.3)
Note 1 to entry: A verification body can be an organization, or part of an organization.
Note 2 to entry: In this document, the expression “validation/verification body” means either validation body (3.4) or
verification body, or both.
[SOURCE: ISO/IEC 17029:2019, 3.5, modified – Note 2 to entry has been added.]
3.6
validation statement
declaration by the validation body (3.4) of the outcome of the validation (3.2) process
Note 1 to entry: Validation statements can be referred to using specific programme terminology, such as “decisions”,
“opinions” or “reports”.
Note 2 to entry: The validation statement reflects only the situation at the point in time it is issued.
Note 3 to entry: The validation statement can be confirming or not confirming the claim (3.1), with or without
comments, according to the programme requirements.
Note 4 to entry: In this document, the expression “validation/verification statement” means either validation
statement or verification statement (3.7), or both.
[SOURCE: ISO/IEC 17029:2019, 3.6, modified – Note 4 to entry has been added.]
© ISO/IEC 2024 – All rights reserved
3.7
verification statement
declaration by the verification body (3.5) of the outcome of the verification (3.3) process
Note 1 to entry: Verification statements can be referred to using specific programme terminology, such as “decisions”,
“opinions” or “reports”.
Note 2 to entry: The verification statement reflects only the situation at the point in time it is issued.
Note 3 to entry: The verification statement can be confirming or not confirming the claim (3.1), with or without
comments, according to the programme requirements.
Note 4 to entry: In this document, the expression “validation/verification statement” means either validation statement
(3.6) or verification statement, or both.
[SOURCE: ISO/IEC 17029:2019, 3.7, modified – Note 4 to entry has been added.]
3.8
validation programme
rules, procedures and management for carrying out validation (3.2) activities in a specific sector
Note 1 to entry: Validation programmes can be operated at international, regional, national, sub-national or sector-
specific level.
Note 2 to entry: A programme can also be called a “scheme”.
Note 3 to entry: A set of standards able to cover all the requirements of ISO/IEC 17029 can serve as a programme.
Note 4 to entry: In this document, the expression “validation/verification programme” means either validation
programme or verification programme (3.9), or both.
[SOURCE: ISO/IEC 17029:2019, 3.8, modified – Note 4 to entry has been added.]
3.9
verification programme
rules, procedures and management for carrying out verification (3.3) activities in a specific sector
Note 1 to entry: Verification programmes can be operated at international, regional, national, sub-national or sector-
specific level.
Note 2 to entry: A programme can also be called a “scheme”.
Note 3 to entry: A set of standards able to cover all the requirements of ISO/IEC 17029 can serve as a programme.
Note 4 to entry: In this document, the expression “validation/verification programme” means either validation
programme (3.8) or verification programme, or both.
[SOURCE: ISO/IEC 17029:2019, 3.9, modified – Note 4 to entry has been added.]
3.10
programme owner
person or organization responsible for developing and maintaining a specific validation programme (3.8) or
verification programme (3.9)
Note 1 to entry: The programme owner can be the validation body (3.4)/verification body (3.5) itself, a governmental
authority, a trade association, a group of validation bodies/verification bodies, an external programme owner or others.
[SOURCE: ISO/IEC 17029:2019, 3.10]
3.11
normative document
document that provides rules, guidelines or characteristics for activities or their results
Note 1 to entry: The term “normative document” is a generic term that covers such documents as standards, technical
specifications, codes of practice and regulations.
© ISO/IEC 2024 – All rights reserved
Note 2 to entry: A “document” is to be understood as any medium with information recorded on or in it.
Note 3 to entry: The terms for different kinds of normative documents are defined considering the document and its
content as a single entity.
[SOURCE: ISO/IEC Guide 2:2004, 3.1]
4 Validation/Verification programmes
4.1 General
4.1.1 In accordance with ISO/IEC 17029, validation/verification are always undertaken within the context
of a validation/verification programme, in which case the operated validation/verification programme
cannot exclude any of the requirements specified by ISO/IEC 17029. This document can be used by
programmes that use another document for validation/verification bodies, in which case the programme
should not exclude or contradict the requirements in that document.
4.1.2 Programmes can be legal frameworks, a set of international, regional or national standards,
global initiatives and sector applications, as well as individual agreements with clients of the validation/
verification body.
4.1.3 Conformity assessment schemes in general comprise the full set of rules and procedures:
— describing the object of conformity assessment (claim),
— identifying the specified requirements applicable to the claim, and
— providing the methodology for performing conformity assessment (validation/verification).
NOTE The specified requirements to be identified apply to the object (i.e. relate to describing the claim). The
methodology relates to the way conformity assessment is performed (i.e. how, when, by whom), e.g. providing specific
methods and procedures for certain activities or rules for validation/verification bodies.
4.1.4 ISO/IEC 17029:2019, 3.11 defines the scope of validation/verification as the identification of the claim
as being the object of conformity assessment and the identification of the applicable specified requirements.
4.1.5 ISO/IEC 17029:2019, Clause 8 lists the following elements as content of programmes:
a) scope of validation/verification;
b) specific competence criteria for the validation/verification team and body;
c) process for validation/verification;
d) evidence gathering activities of validation/verification ;
e) reporting of validation/verification.
NOTE ISO/IEC 17029:2019, Annex A also provides additional elements.
4.1.6 The content of the programme (see 4.2) is specified by the programme owner (see 4.3).
4.1.7 Where validation/verification is performed as conformity assessment, i.e. including a decision on
whether or not to confirm the claim, the result or deliverable of the outcome of this process is a validation/
verification statement (see ISO/IEC 17029:2019, 9.7).
Where validation/verification is performed as an activity contributing to the selection, determination, and
review functions of the validation/verification process (see ISO/IEC 17029:2019, Annex B), other deliverables
than a validation/verification statement result from this activity.
© ISO/IEC 2024 – All rights reserved
In principle, a validation/verification programme can specify deliverables resulting from activities
contributing to each of the functions. For example,
— a “validation/verification plan” as a result of selection activities (see ISO/IEC 17029:2019, 9.2 and 9.4);
— an “evidence report” as a result of the selection and determination activities (see ISO/IEC 17029:2019,
9.2, 9.4 and 9.5);
— a “findings report” as a result of the review of the gathered evidence (see ISO/IEC 17029:2019, 9.6);
— a “report of actual findings”, i.e. the outcome of agreed upon procedures (AUP).
4.1.8 The deliverables associated with validation/verification programmes can be used as inputs to other
conformity assessment activities.
EXAMPLE A validation/verification statement can be used as an input into an evaluation activity of a product
certification body that fulfils ISO/IEC 17065.
Similarly, validation/verification programmes can specify that the results of other conformity assessment
activities (such as auditing, inspection, testing or certification) can be used as inputs into the validation/
verification process.
4.2 Programme content
4.2.1 Scope of validation/verification
4.2.1.1 The programme describes the claim to be the object of validation/verification, e.g. specifying
types of claims and boundaries.
4.2.1.2 The programme contains or references specified requirements to be fulfilled by the claim in order
to be confirmed.
4.2.1.3 The programme can allow for specific levels of assurance provided with the outcome of validation/
verification, e.g. reasonable, limited (see ISO/IEC 17029:2019, 9.2.2).
4.2.2 Competence, impartiality and operation of validation/verification bodies
4.2.2.1 The programme should describe means of monitoring to identify and to mitigate threats to
impartiality, e.g. consulting with the committee of the interested parties (see ISO/IEC 17029:2019, 5.3.3).
4.2.2.2 The programme can allow and set rules for providing both validation and verification to the same
client or in the context of the same project (see ISO/IEC 17029:2019, 5.3.8).
4.2.2.3 The programme can require or recommend specific arrangements to cover liability (see
ISO/IEC 17029:2019, 5.4).
4.2.2.4 The programme can specify requirements for resources, i.e. personnel, facilities, equipment,
systems and support services (see ISO/IEC 17029:2019, 7.1).
4.2.2.5 The programme can specify a period for personnel who have provided consultancy before
performing validation/verification activities (see ISO/IEC 17029:2019, 7.2.5).
4.2.2.6 The programme can require or recommend specific confidentiality requirements (see
ISO/IEC 17029:2019, 7.2.6).
© ISO/IEC 2024 – All rights reserved
4.2.2.7 The programme can specify the training requirements of personnel, including requirements for
their monitoring (see ISO/IEC 17029:2019, 7.3.2).
4.2.2.8 The programme can set rules for outsourcing, including prohibitions on outsourcing (see
ISO/IEC 17029:2019, 7.4).
4.2.2.9 The programme can specify requirements for persons carrying out the review, e.g. not being
involved in planning (see ISO/IEC 17029:2019, 9.6.2).
4.2.2.10 The programme can specify the requirements for persons making the decision on whether or not
to confirm the claim and issuing the validation/verification statement, e.g. not being involved in planning
(see ISO/IEC 17029:2019, 9.7.1.2).
4.2.3 Steps for the validation/verification process
4.2.3.1 The programme contains rules and procedures for carrying out validation/verification, e.g.
specific requirements for the pre-engagement (see 4.2.3.2), engagement (see 4.2.3.3), planning, execution
(see 4.2.4), review and decision (see 4.2.3.5 and 4.2.4.2).
4.2.3.2 Pre-engagement activities specified by the programme can include information to be submitted by
the client for pre-engagement review, time frames and any applicable fees (see ISO/IEC 17029:2019, 9.2).
4.2.3.3 Specification of the engagement agreement between the client and the validation/verification body
by the programme can include identification of the programme requirements to be covered by agreement
[see ISO/IEC 17029:2019, 9.3.1 and 9.3.3 bullet b)].
4.2.3.4 Planning and preparation activities specified by the programme can include specific terms, e.g.
evidence-gatheri
...
Technical
Specification
ISO/IEC TS 17035
First edition
Conformity assessment —
2024-09
Guidelines for validation and
verification programmes
Évaluation de la conformité — Lignes directrices pour les
programmes de validation et de vérification
Reference number
© ISO/IEC 2024
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
© ISO/IEC 2024 – All rights reserved
ii
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Validation/Verification programmes . 4
4.1 General .4
4.2 Programme content .5
4.2.1 Scope of validation/verification .5
4.2.2 Competence, impartiality and operation of validation/verification bodies .5
4.2.3 Steps for the validation/verification process .6
4.2.4 Evidence gathering activities .6
4.2.5 Reporting .7
4.3 Programme development . .7
4.4 Programme maintenance, review and improvement .8
5 Programme owner . 9
Annex A (informative) Clarification of logo/symbol/mark . 10
Annex B (informative) Recognition of validation/verification programmes .12
Annex C (informative) Questions to help recognize a validation/verification programme . 14
Bibliography . 17
© ISO/IEC 2024 – All rights reserved
iii
Foreword
ISO (the International Organization for Standardization) and IEC (the International Electrotechnical
Commission) form the specialized system for worldwide standardization. National bodies that are
members of ISO or IEC participate in the development of International Standards through technical
committees established by the respective organization to deal with particular fields of technical activity.
ISO and IEC technical committees collaborate in fields of mutual interest. Other international organizations,
governmental and non-governmental, in liaison with ISO and IEC, also take part in the work.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types
of document should be noted. This document was drafted in accordance with the editorial rules of the ISO/
IEC Directives, Part 2 (see www.iso.org/directives or www.iec.ch/members_experts/refdocs).
ISO and IEC draw attention to the possibility that the implementation of this document may involve the
use of (a) patent(s). ISO and IEC take no position concerning the evidence, validity or applicability of any
claimed patent rights in respect thereof. As of the date of publication of this document, ISO and IEC had not
received notice of (a) patent(s) which may be required to implement this document. However, implementers
are cautioned that this may not represent the latest information, which may be obtained from the patent
database available at www.iso.org/patents and https://patents.iec.ch. ISO and IEC shall not be held
responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT) see www.iso.org/iso/foreword.html.
In the IEC, see www.iec.ch/understanding-standards.
This document was prepared by the ISO Committee on Conformity Assessment (CASCO).
Any feedback or questions on this document should be directed to the user’s national standards
body. A complete listing of these bodies can be found at www.iso.org/members.html and
www.iec.ch/national-committees.
© ISO/IEC 2024 – All rights reserved
iv
Introduction
This document is aligned with ISO/IEC 17029 which provides principles and requirements for bodies
providing validation/verification services. ISO/IEC 17029 is a generic standard that can apply to validation/
verification bodies in any economic sector or industry. It is distinct from other standards for conformity
assessment bodies in that it requires the object of conformity to be a claim, and for this to be validated
and/or verified in accordance with a validation or verification programme. Validation/verification bodies
operating in accordance with ISO/IEC 17029 can provide services as first-, second- or third-party activities.
This document is also aligned with sector-specific applications of ISO/IEC 17029, such as ISO 14065 which
references the requirements of ISO/IEC 17029 and includes specific requirements related to bodies that
validate or verify environmental information.
To validate or verify a claim, validation/verification bodies must often review large amounts of data and
information, including aspects such as the suitability of the boundaries of the claim; the way data has been
defined, collected and recorded; how quantification and calculation methods that support the claim have
been undertaken; and provision of a professional judgement on matters that are material or significant to
the claim.
The issuance of a validation or verification statement will normally be a one-off attestation based on the
information available at that point in time. Validation/verification statements normally do not have a period
of validity associated with them. Each subsequent validation/verification is a new separate conformity
assessment and is not considered to be a surveillance activity that supports an original or previous
validation/verification statement.
The result of validation or verification activities will frequently be a validation or verification statement.
These statements normally provide an opinion from the validation or verification body on the plausibility
of a claim that is made about the future based on projected data (validation), or the truthfulness of the
claim based on historical data (verification). The results from a validation and verification programme can
sometimes be combined to support a claim (e.g. a mixed engagement or in the management of similar or
related programmes). Validation/verification bodies can also be asked to undertake a validation/verification
process and issue a report of their findings, but without any formal statement or opinion on the plausibility
or truthfulness of the claim being made.
NOTE This is often referred to undertaking validation or verification activities on the basis of Agreed Upon
Procedures (AUP).
Within ISO/IEC 17029, there is a requirement for validation/verification bodies to operate within the
context of at least one validation or verification programme. Within ISO/IEC 17029 requirements, there
are many references to validation/verification programmes, and it is expected that validation/verification
programmes give direction to the validation/verification body. The importance of appropriate validation/
verification programmes when undertaking validation/verification activities in accordance with
ISO/IEC 17029 is critical to the correct operation of this type of conformity assessment.
ISO/IEC 17029:2019, Annex A also provides a comprehensive informative list of elements to be considered in
the development and operation of validation/verification programmes. The content of ISO/IEC 17029:2019,
Annex A has been included and amplified in this document.
To assist in the development, operation and recognition of validation/verification programmes suitable for
use with ISO/IEC 17029, this document covers the following:
a) an overview of validation/verification programmes in the context of ISO/IEC 17029;
b) development of validation/verification programmes;
c) recognition of validation/verification programmes.
© ISO/IEC 2024 – All rights reserved
v
Technical Specification ISO/IEC TS 17035:2024(en)
Conformity assessment — Guidelines for validation and
verification programmes
1 Scope
This document provides guidance to validation/verification programme owners, validation/verification
bodies and interested parties on the development, content and operation of validation/verification
programmes.
When implemented by validation/verification bodies, this document is intended to be used in conjunction
with ISO/IEC 17029 and sector-specific applications of ISO/IEC 17029.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO/IEC 17000, Conformity assessment — Vocabulary and general principles
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO/IEC 17000 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1
claim
information declared by the client
Note 1 to entry: The claim is the object of conformity assessment by validation (3.2)/verification (3.3).
Note 2 to entry: The claim can represent a situation at a point in time or could cover a period of time.
Note 3 to entry: The claim should be clearly identifiable and capable of consistent evaluation or measurement against
specified requirements by a validation body (3.4)/verification body (3.5).
Note 4 to entry: The claim can be provided in the form of a report, a statement, a declaration, a project plan, or
consolidated data.
[SOURCE: ISO/IEC 17029:2019, 3.1]
3.2
validation
confirmation of a claim (3.1), through the provision of objective evidence, that the requirements for a specific
intended future use or application have been fulfilled
Note 1 to entry: Objective evidence can come from real or simulated sources.
Note 2 to entry: Validation is considered to be a process to evaluate the reasonableness of the assumptions, limitations,
and methods that support a claim about the outcome of future activities.
© ISO/IEC 2024 – All rights reserved
Note 3 to entry: Validation is applied to claims regarding an intended future use based on projected information
(confirmation of plausibility).
Note 4 to entry: In this document, the expression “validation/verification” means either validation or verification (3.3),
or both.
[SOURCE: ISO/IEC 17029:2019, 3.2, modified – The original Note 4 to entry has been deleted and a new Note
4 to entry has been added.]
3.3
verification
confirmation of a claim (3.1), through the provision of objective evidence, that specified requirements have
been fulfilled
Note 1 to entry: Verification is considered to be a process for evaluating a claim based on historical data and
information to determine whether the claim is materially correct and conforms with specified requirements.
Note 2 to entry: Verification is applied to claims regarding events that have already occurred or results that have
already been obtained (confirmation of truthfulness).
Note 3 to entry: In this document, the expression “validation/verification” means either validation (3.2) or verification,
or both.
[SOURCE: ISO/IEC 17029:2019, 3.3, modified – The original Note 3 to entry has been deleted and a new Note
3 to entry has been added.]
3.4
validation body
body that performs validation (3.2)
Note 1 to entry: A validation body can be an organization, or part of an organization.
Note 2 to entry: In this document, the expression “validation/verification body” means either validation body or
verification body (3.5), or both.
[SOURCE: ISO/IEC 17029:2019, 3.4, modified – Note 2 to entry has been added.]
3.5
verification body
body that performs verification (3.3)
Note 1 to entry: A verification body can be an organization, or part of an organization.
Note 2 to entry: In this document, the expression “validation/verification body” means either validation body (3.4) or
verification body, or both.
[SOURCE: ISO/IEC 17029:2019, 3.5, modified – Note 2 to entry has been added.]
3.6
validation statement
declaration by the validation body (3.4) of the outcome of the validation (3.2) process
Note 1 to entry: Validation statements can be referred to using specific programme terminology, such as “decisions”,
“opinions” or “reports”.
Note 2 to entry: The validation statement reflects only the situation at the point in time it is issued.
Note 3 to entry: The validation statement can be confirming or not confirming the claim (3.1), with or without
comments, according to the programme requirements.
Note 4 to entry: In this document, the expression “validation/verification statement” means either validation
statement or verification statement (3.7), or both.
[SOURCE: ISO/IEC 17029:2019, 3.6, modified – Note 4 to entry has been added.]
© ISO/IEC 2024 – All rights reserved
3.7
verification statement
declaration by the verification body (3.5) of the outcome of the verification (3.3) process
Note 1 to entry: Verification statements can be referred to using specific programme terminology, such as “decisions”,
“opinions” or “reports”.
Note 2 to entry: The verification statement reflects only the situation at the point in time it is issued.
Note 3 to entry: The verification statement can be confirming or not confirming the claim (3.1), with or without
comments, according to the programme requirements.
Note 4 to entry: In this document, the expression “validation/verification statement” means either validation statement
(3.6) or verification statement, or both.
[SOURCE: ISO/IEC 17029:2019, 3.7, modified – Note 4 to entry has been added.]
3.8
validation programme
rules, procedures and management for carrying out validation (3.2) activities in a specific sector
Note 1 to entry: Validation programmes can be operated at international, regional, national, sub-national or sector-
specific level.
Note 2 to entry: A programme can also be called a “scheme”.
Note 3 to entry: A set of standards able to cover all the requirements of ISO/IEC 17029 can serve as a programme.
Note 4 to entry: In this document, the expression “validation/verification programme” means either validation
programme or verification programme (3.9), or both.
[SOURCE: ISO/IEC 17029:2019, 3.8, modified – Note 4 to entry has been added.]
3.9
verification programme
rules, procedures and management for carrying out verification (3.3) activities in a specific sector
Note 1 to entry: Verification programmes can be operated at international, regional, national, sub-national or sector-
specific level.
Note 2 to entry: A programme can also be called a “scheme”.
Note 3 to entry: A set of standards able to cover all the requirements of ISO/IEC 17029 can serve as a programme.
Note 4 to entry: In this document, the expression “validation/verification programme” means either validation
programme (3.8) or verification programme, or both.
[SOURCE: ISO/IEC 17029:2019, 3.9, modified – Note 4 to entry has been added.]
3.10
programme owner
person or organization responsible for developing and maintaining a specific validation programme (3.8) or
verification programme (3.9)
Note 1 to entry: The programme owner can be the validation body (3.4)/verification body (3.5) itself, a governmental
authority, a trade association, a group of validation bodies/verification bodies, an external programme owner or others.
[SOURCE: ISO/IEC 17029:2019, 3.10]
3.11
normative document
document that provides rules, guidelines or characteristics for activities or their results
Note 1 to entry: The term “normative document” is a generic term that covers such documents as standards, technical
specifications, codes of practice and regulations.
© ISO/IEC 2024 – All rights reserved
Note 2 to entry: A “document” is to be understood as any medium with information recorded on or in it.
Note 3 to entry: The terms for different kinds of normative documents are defined considering the document and its
content as a single entity.
[SOURCE: ISO/IEC Guide 2:2004, 3.1]
4 Validation/Verification programmes
4.1 General
4.1.1 In accordance with ISO/IEC 17029, validation/verification are always undertaken within the context
of a validation/verification programme, in which case the operated validation/verification programme
cannot exclude any of the requirements specified by ISO/IEC 17029. This document can be used by
programmes that use another document for validation/verification bodies, in which case the programme
should not exclude or contradict the requirements in that document.
4.1.2 Programmes can be legal frameworks, a set of international, regional or national standards,
global initiatives and sector applications, as well as individual agreements with clients of the validation/
verification body.
4.1.3 Conformity assessment schemes in general comprise the full set of rules and procedures:
— describing the object of conformity assessment (claim),
— identifying the specified requirements applicable to the claim, and
— providing the methodology for performing conformity assessment (validation/verification).
NOTE The specified requirements to be identified apply to the object (i.e. relate to describing the claim). The
methodology relates to the way conformity assessment is performed (i.e. how, when, by whom), e.g. providing specific
methods and procedures for certain activities or rules for validation/verification bodies.
4.1.4 ISO/IEC 17029:2019, 3.11 defines the scope of validation/verification as the identification of the claim
as being the object of conformity assessment and the identification of the applicable specified requirements.
4.1.5 ISO/IEC 17029:2019, Clause 8 lists the following elements as content of programmes:
a) scope of validation/verification;
b) specific competence criteria for the validation/verification team and body;
c) process for validation/verification;
d) evidence gathering activities of validation/verification ;
e) reporting of validation/verification.
NOTE ISO/IEC 17029:2019, Annex A also provides additional elements.
4.1.6 The content of the programme (see 4.2) is specified by the programme owner (see 4.3).
4.1.7 Where validation/verification is performed as conformity assessment, i.e. including a decision on
whether or not to confirm the claim, the result or deliverable of the outcome of this process is a validation/
verification statement (see ISO/IEC 17029:2019, 9.7).
Where validation/verification is performed as an activity contributing to the selection, determination, and
review functions of the validation/verification process (see ISO/IEC 17029:2019, Annex B), other deliverables
than a validation/verification statement result from this activity.
© ISO/IEC 2024 – All rights reserved
In principle, a validation/verification programme can specify deliverables resulting from activities
contributing to each of the functions. For example,
— a “validation/verification plan” as a result of selection activities (see ISO/IEC 17029:2019, 9.2 and 9.4);
— an “evidence report” as a result of the selection and determination activities (see ISO/IEC 17029:2019,
9.2, 9.4 and 9.5);
— a “findings report” as a result of the review of the gathered evidence (see ISO/IEC 17029:2019, 9.6);
— a “report of actual findings”, i.e. the outcome of agreed upon procedures (AUP).
4.1.8 The deliverables associated with validation/verification programmes can be used as inputs to other
conformity assessment activities.
EXAMPLE A validation/verification statement can be used as an input into an evaluation activity of a product
certification body that fulfils ISO/IEC 17065.
Similarly, validation/verification programmes can specify that the results of other conformity assessment
activities (such as auditing, inspection, testing or certification) can be used as inputs into the validation/
verification process.
4.2 Programme content
4.2.1 Scope of validation/verification
4.2.1.1 The programme describes the claim to be the object of validation/verification, e.g. specifying
types of claims and boundaries.
4.2.1.2 The programme contains or references specified requirements to be fulfilled by the claim in order
to be confirmed.
4.2.1.3 The programme can allow for specific levels of assurance provided with the outcome of validation/
verification, e.g. reasonable, limited (see ISO/IEC 17029:2019, 9.2.2).
4.2.2 Competence, impartiality and operation of validation/verification bodies
4.2.2.1 The programme should describe means of monitoring to identify and to mitigate threats to
impartiality, e.g. consulting with the committee of the interested parties (see ISO/IEC 17029:2019, 5.3.3).
4.2.2.2 The programme can allow and set rules for providing both validation and verification to the same
client or in the context of the same project (see ISO/IEC 17029:2019, 5.3.8).
4.2.2.3 The programme can require or recommend specific arrangements to cover liability (see
ISO/IEC 17029:2019, 5.4).
4.2.2.4 The programme can specify requirements for resources, i.e. personnel, facilities, equipment,
systems and support services (see ISO/IEC 17029:2019, 7.1).
4.2.2.5 The programme can specify a period for personnel who have provided consultancy before
performing validation/verification activities (see ISO/IEC 17029:2019, 7.2.5).
4.2.2.6 The programme can require or recommend specific confidentiality requirements (see
ISO/IEC 17029:2019, 7.2.6).
© ISO/IEC 2024 – All rights reserved
4.2.2.7 The programme can specify the training requirements of personnel, including requirements for
their monitoring (see ISO/IEC 17029:2019, 7.3.2).
4.2.2.8 The programme can set rules for outsourcing, including prohibitions on outsourcing (see
ISO/IEC 17029:2019, 7.4).
4.2.2.9 The programme can specify requirements for persons carrying out the review, e.g. not being
involved in planning (see ISO/IEC 17029:2019, 9.6.2).
4.2.2.10 The programme can specify the requirements for persons making the decision on whether or not
to confirm the claim and issuing the validation/verification statement, e.g. not being involved in planning
(see ISO/IEC 17029:2019, 9.7.1.2).
4.2.3 Steps for the validation/verification process
4.2.3.1 The programme contains rules and procedures for carrying out validation/verification, e.g.
specific requirements for the pre-engagement (see 4.2.3.2), engagement (see 4.2.3.3), planning, execution
(see 4.2.4), review and decision (see 4.2.3.5 and 4.2.4.2).
4.2.3.2 Pre-engagement activities specified by the programme can include information to be submitted by
the client for pre-engagement review, time frames and any applicable fees (see ISO/IEC 17029:2019, 9.2).
4.2.3.3 Specification of the engagement agreement between the client and the validation/verification body
by the programme can include identification of the programme requirements to be covered by agreement
[see ISO/IEC 17029:2019, 9.3.1 and 9.3.3 bullet b)].
4.2.3.4 Planning and preparation activities specified by the programme can include specific terms, e.g.
evidence-gathering plan, sampling plan, validation/verification plan, and criteria, e.g. for materiality,
assurance levels (see ISO/IEC 17029:2019, 9.4.1).
4.2.3.5 The programme can specify the applicable materiality and criteria for significance of evidence (see
ISO/IEC 17029:2019, 3.1.6 and 9.2.2).
4.2.3.6 The programme should provide objectives for a risk-based approach to validation/verification
activities including, among others, threats to impartiality (see ISO/IEC 17029:2019, 4.3.7).
4.2.3.7 The programme should set rule
...
Die SIST-TS ISO/IEC TS 17035:2024 ist ein bedeutendes Dokument, das umfassende Leitlinien für die Entwicklung, den Inhalt und den Betrieb von Validierungs- und Verifizierungsprogrammen bietet. Der Umfang dieser Norm ist klar definiert und richtet sich an Programmverantwortliche, Validierungs- und Verifizierungsstellen sowie an alle interessierten Parteien. Ein herausragendes Merkmal der Norm ist ihre Verbindung zu ISO/IEC 17029 und deren sektorenspezifischen Anwendungen. Dies fördert eine umfangreiche Anwendung der Richtlinien und stellt sicher, dass die Validierungs- und Verifizierungsprogramme in Übereinstimmung mit internationalen Standards durchgeführt werden. Die klare Struktur und die präzisen Anforderungen der Norm bieten eine solide Basis für die Implementierung effektiver Programme, die sowohl glaubwürdig als auch nachvollziehbar sind. Die SIST-TS ISO/IEC TS 17035:2024 liefert nicht nur wichtige Informationen über die Struktur und den Ablauf von Validierungs- und Verifizierungsprogrammen, sondern unterstützt auch die relevanten Akteure dabei, eine hohe Qualität und Konsistenz in ihren Tätigkeiten sicherzustellen. Ein weiterer Pluspunkt dieser Norm ist ihre Relevanz für verschiedene Sektoren, die sie anpassungsfähig und für eine Vielzahl von Anwendungen geeignet macht. Insgesamt trägt die Norm zur Stärkung des Vertrauens in die Ergebnisse von Validierungs- und Verifizierungsprogrammen bei und stellt sicher, dass die Programme den Anforderungen an Qualität und Integrität gerecht werden. Daher ist die Umsetzung der SIST-TS ISO/IEC TS 17035:2024 für Organisationen, die im Bereich der Validierung und Verifizierung tätig sind, von großer Bedeutung.
SIST-TS ISO/IEC TS 17035:2024は、検証および認証プログラムに関する標準文書であり、その範囲はプログラムの開発、内容、および運用に関するガイドラインを提供しています。この標準は、検証/認証プログラムの所有者、検証/認証機関、および関心のある関係者が、効果的な検証および認証プログラムを確立するための基盤を築くことを目指しています。 この標準の強みは、その包括的なアプローチにあります。検証/認証プログラムの運営における重要な要素を網羅しており、実施に際しての具体的な手順や実務における注意点を明確に示しています。特に、ISO/IEC 17029との連携により、信頼性の高い評価プロセスを確保するためのフレームワークを提供します。このことは、業界によって異なるニーズに応じた柔軟な適用が可能となることを示しており、実務者に対して大きな価値を提供します。 また、U卒業校や産業界においても注視されている点として、関連するセクター特有の適用方法があります。これにより、特定の業界や分野における特有の要求に対応した、的確な検証および認証プログラムの開発が促進されます。 ISO/IEC TS 17035:2024は、検証および認証の質を向上させ、信頼性のあるプログラムの実施を支援するための重要な文書です。各関係者がこの標準のガイドラインを基に、持続可能かつ効果的なプログラムを構築できることを目指すものとなっています。
La norme SIST-TS ISO/IEC TS 17035:2024 offre des lignes directrices précieuses pour les propriétaires de programmes de validation et de vérification, ainsi que pour les organismes concernés. Son champ d'application se concentre sur le développement, le contenu et le fonctionnement des programmes de validation et de vérification, ce qui en fait un outil essentiel dans le domaine de l'évaluation de la conformité. L'un des principaux atouts de cette norme est sa capacité à fournir des conseils clairs et structurés, facilitant ainsi la mise en place de processus robustes et efficaces pour les organismes de validation et de vérification. En intégrant les principes d'ISO/IEC 17029, la norme assure une cohérence dans l'approche des programmes de validation et de vérification, renforçant ainsi leur crédibilité et leur acceptation sur le marché. La pertinence de la norme SIST-TS ISO/IEC TS 17035:2024 est également soulignée par sa complémentarité avec des applications sectorielles spécifiques d'ISO/IEC 17029, ce qui permet aux organismes d'adapter les directives aux particularités de leur domaine d'activité. Cela renforce non seulement la confiance des parties prenantes dans les programmes de validation et de vérification, mais favorise aussi l'uniformité des pratiques à l'échelle internationale. En résumé, la norme SIST-TS ISO/IEC TS 17035:2024 est un document clé qui constitue une référence importante pour assurer la qualité et l'intégrité des programmes de validation et de vérification, tout en soutenant le développement harmonisé des pratiques d'évaluation de la conformité.
SIST-TS ISO/IEC TS 17035:2024는 검증 및 확인 프로그램의 개발, 내용 및 운영에 대한 지침을 제공하는 중요한 문서입니다. 이 표준은 검증 및 확인 프로그램 소유자, 기관 및 이해관계자들에게 필수적인 로드맵을 제시하며, 이러한 프로그램의 효율성과 신뢰성을 높이는 데 기여합니다. 이 문서의 주요 강점 중 하나는 명확하고 실용적인 지침을 제공한다는 점입니다. 이는 다양한 산업 분야에서 검증 및 확인 프로그램이 효과적으로 수행될 수 있도록 지원합니다. 또한, ISO/IEC 17029와의 연계성을 통해 기존 표준과의 통합을 원활하게 하여 프로그램의 일관성과 신뢰성을 보장합니다. SIST-TS ISO/IEC TS 17035:2024의 적용 범위는 매우 광범위하여, 특정 산업의 요구사항에 맞춤형으로 사용할 수 있습니다. 이는 각기 다른 분야에서의 특정 요구를 충족시키는 데 유용하며, 실제로 검증 및 확인 프로그램의 품질을 높이는 데 중요한 역할을 합니다. 결론적으로, SIST-TS ISO/IEC TS 17035:2024는 검증 및 확인 프로그램의 효과적인 개발과 운영을 위한 기초를 마련하는 데 중요한 표준입니다. 이 문서는 산업 전반에 걸쳐 신뢰할 수 있는 절차를 구축하고, 모든 이해관계자가 검증 및 확인 프로그램을 보다 잘 이해하고 활용할 수 있도록 돕습니다.
The ISO/IEC TS 17035:2024 standard on "Conformity assessment - Guidelines for validation and verification programmes" serves as a crucial resource for validation and verification programme owners, bodies, and stakeholders. Its defined scope focuses on providing comprehensive guidance that aids in the development, content, and overall operation of validation and verification programmes. One of the primary strengths of this standard is its clear structure, which allows validation/verification bodies to effectively implement the guidelines within their established frameworks. By detailing best practices and key considerations, ISO/IEC TS 17035:2024 enhances the credibility and reliability of validation and verification activities, ensuring that all parties involved have a clear understanding of the requirements. Moreover, the standard's relevance is underscored by its integration with ISO/IEC 17029. This alignment allows for a cohesive approach to validation and verification, reinforcing their importance in various sectors. The guidance provided assists organizations not only in compliance but also in fostering trust with stakeholders by demonstrating transparent and rigorous validation processes. Overall, ISO/IEC TS 17035:2024 significantly contributes to the robustness of validation and verification frameworks, promoting accuracy and consistency across programmes while supporting innovation and accountability in the conformity assessment landscape.














Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...