Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3 (IEC 61784-5-3:2010)

IEC 61784-5-3:2010(E) specifies the installation profiles for CPF 3 (PROFIBUS/PROFINET). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2010. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. It includes the technical changes of the corrigendum for the first edition in 2008 and an addition concerning transmission performance measurement (see Annex C.6.3.2.1.2).
This publication is to be read in conjunction with IEC 61918:2010.

Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 3 (IEC 61784-5-3:2010)

Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de terrain - Profils d'installation pour CPF 3 (CEI 61784-5-3:2010)

Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 3 (IEC 61784-5-3:2010)

Ta del standarda IEC 61784 določa inštalacijske profile za CPF 3 (PROFIBUS/PROFINET)1. Inštalacijski profili so navedeni v dodatkih. Ti dodatki se navezujejo na standard IEC 61918:2007.

General Information

Status
Withdrawn
Publication Date
06-May-2012
Withdrawal Date
19-Aug-2014
Current Stage
9900 - Withdrawal (Adopted Project)
Start Date
19-Aug-2014
Due Date
11-Sep-2014
Completion Date
20-Aug-2014

Relations

Buy Standard

Standard
EN 61784-5-3:2012 - BARVE
English language
107 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 61784-5-3:2012
01-junij-2012
1DGRPHãþD
SIST EN 61784-5-3:2008
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 3 (IEC 61784-5-3:2010)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3 (IEC 61784-5-3:2010)
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 3 (IEC 61784-5-3:2010)
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de
terrain - Profils d'installation pour CPF 3 (CEI 61784-5-3:2010)
Ta slovenski standard je istoveten z: EN 61784-5-3:2012
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.05 9HþVORMQHXSRUDEQLãNH Multilayer applications
UHãLWYH
SIST EN 61784-5-3:2012 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 61784-5-3:2012

---------------------- Page: 2 ----------------------

SIST EN 61784-5-3:2012

EUROPEAN STANDARD
EN 61784-5-3

NORME EUROPÉENNE
April 2012
EUROPÄISCHE NORM

ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-3:2008


English version


Industrial communication networks -
Profiles -
Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3
(IEC 61784-5-3:2010)


Réseaux de communication industriels -  Industrielle Kommunikationsnetze -
Profils - Profile -
Partie 5-3: Installation des bus de terrain - Teil 5-3: Feldbusinstallation -
Profils d'installation pour CPF 3 Installationsprofile für die
(CEI 61784-5-3:2010) Kommunikationsprofilfamilie 3
(IEC 61784-5-3:2010)





This European Standard was approved by CENELEC on 2011-10-19. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Management Centre: Avenue Marnix 17, B - 1000 Brussels


© 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61784-5-3:2012 E

---------------------- Page: 3 ----------------------

SIST EN 61784-5-3:2012
EN 61784-5-3:2012 - 2 -

Foreword
The text of document 65C/602/FDIS, future edition 2 of IEC 61784-5-3, prepared by SC 65C, "Industrial
networks", of IEC/TC 65, "Industrial-process measurement, control and automation" was submitted to the
IEC-CENELEC parallel vote and approved by CENELEC as EN 61784-5-3:2012.

The following dates are fixed:
(dop) 2012-10-20
• latest date by which the document has
to be implemented at national level by
publication of an identical national
standard or by endorsement
• latest date by which the national (dow) 2014-10-19

standards conflicting with the
document have to be withdrawn

This document supersedes EN 61784-5-3:2008.
EN 61784-5-3:2012 includes an addition concerning transmission performance measurement (see
C.6.3.2.1.2).

This standard is to be used in conjunction with IEC 61918, second edition (2010-07), together with the
European Common Modification published with EN 61918:2008.

Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent
rights.

Endorsement notice
The text of the International Standard IEC 61784-5-3:2010 was approved by CENELEC as a European
Standard without any modification.

---------------------- Page: 4 ----------------------

SIST EN 61784-5-3:2012
- 3 - EN 61784-5-3:2012
Annex ZA
(normative)

Normative references to international publications
with their corresponding European publications

The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.

Publication Year Title EN/HD Year

- - Electrical apparatus for potentially explosive EN 50020 -
atmospheres - Intrinsic safety 'i'


IEC 60079-0 2007 Explosive atmospheres - EN 60079-0 2009
+ corr. December 2010 Part 0: Equipment - General requirements


IEC 60079-11 2006 Explosive atmospheres - EN 60079-11 2007
+ corr. December 2006 Part 11: Equipment protection by intrinsic
safety "i"


IEC 60079-27 2008 Explosive atmospheres - EN 60079-27 2008
Part 27: Fieldbus intrinsically safe concept
(FISCO)


IEC 60512-6-3 - Connectors for electronic equipment - Tests EN 60512-6-3 -
and measurements -
Part 6-3: Dynamic stress tests - Test 6c:
Shock


IEC 60512-6-4 - Connectors for electronic equipment - Tests EN 60512-6-4 -
and measurements -
Part 6-4: Dynamic stress tests - Test 6d:
Vibration (sinusoidal)


1)
IEC 60793-2-10 2007 Optical fibres - EN 60793-2-10 2007
Part 2-10: Product specifications - Sectional
specification for category A1 multimode fibres


IEC 60793-2-50 2008 Optical fibres - EN 60793-2-50 2008
Part 2-50: Product specifications - Sectional
specification for class B single-mode fibres


IEC 61000-4-2 2008 Electromagnetic compatibility (EMC) - EN 61000-4-2 2009
Part 4-2: Testing and measurement
techniques - Electrostatic discharge immunity
test


IEC 61076-2-107 2010 Connectors for electronic equipment - Product EN 61076-2-107 2010
requirements -
Part 2-107: Detail specification for circular
hybrid connectors M12 with electrical and
fibre-optic contacts with screw-locking


IEC 61156-5 2009 Multicore and symmetrical pair/quad cables - -
+ corr. May 2009 for digital communications -
+ corr. February 2010 Part 5: Symmetrical pair/quad cables with
transmission characteristics up to 1 000 MHz -
Horizontal floor wiring - Sectional specification



1)
EN 60793-2-10 is superseded by EN 60793-2-10:2011, which is based on IEC 60793-2-10:2011.

---------------------- Page: 5 ----------------------

SIST EN 61784-5-3:2012
EN 61784-5-3:2012 - 4 -
Publication Year Title EN/HD Year

IEC 61508 Series Functional safety of EN 61508 Series
electrical/electronic/programmable electronic
safety-related systems


IEC 61754-24-11 - Fibre optic interconnecting devices and EN 61754-24-11 -
passive components - Fibre optic connector
interfaces -
Part 24-11: Type SC-RJ connectors with
protective housings based on
IEC 61076-3-117


IEC 61918 2010 Industrial communication networks - - -
Installation of communication networks in
industrial premises


ANSI TIA/EIA-485-A - Electrical Characteristics of Generators and - -
Receivers for Use in Balanced Digital
Multipoint Systems

---------------------- Page: 6 ----------------------

SIST EN 61784-5-3:2012

IEC 61784-5-3
®
Edition 2.0 2010-07
INTERNATIONAL
STANDARD

colour
inside

Industrial communication networks – Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
PRICE CODE
XD
ICS 25.040.40; 35.100.40 ISBN 978-2-88912-056-7
® Registered trademark of the International Electrotechnical Commission

---------------------- Page: 7 ----------------------

SIST EN 61784-5-3:2012
– 2 – 61784-5-3 © IEC:2010(E)
CONTENTS
FOREWORD.5
INTRODUCTION.7
1 Scope.8
2 Normative references .8
3 Terms, definitions and abbreviated terms .8
4 CPF 3: Overview of installation profiles .8
5 Installation profile conventions .9
6 Conformance to installation profiles.9
Annex A (normative) CP 3/1 (PROFIBUS) specific installation profile.11
Annex B (normative)  CP 3/2 (PROFIBUS) specific installation profile.43
Annex C (normative) CP 3/3, CP 3/4, CP 3/5, CP 3/6 (PROFINET) specific installation
profile .77
Bibliography.103

Figure 1 – Standards relationships.7
Figure A.1 – Recommended combination of shielding and earthing for CP 3/1
networks with RS 485-IS.24
Figure A.2 – Sub-D connector pin numberings (front view).29
Figure A.3 – 5-pin M-12 female socket.30
Figure A.4 – 5 pins M-12 male plug for CP 3/1.31
Figure A.5 – Test circuit A - resistance measurement of data line B and shield.36
Figure A.6 – Test circuit B - resistance measurement of data line A and shield.37
Figure A.7 – Test circuit C - resistance measurement of data line A, data line B, and
shield.37
Figure A.8 – Test circuit D - resistance measurement between data line A and B .38
Figure A.9 – Resistance measurement without 9-pin Sub-D plug .38
Figure A.10 – Loop core resistance (cable type A) .39
Figure A.11 – Action and resolution tree for measurement 1 (RS 485 and RS 485-IS) .40
Figure A.12 – Action and resolution tree for measurement 2 (RS 485 and RS 485-IS) .41
Figure A.13 – Action and resolution tree for measurement 3 (RS 485 and RS 485-IS) .41
Figure B.1 – Connection of CP 3/1 networks.46
Figure B.2 – Typical fieldbus architecture .48
Figure B.3 – Fieldbus with stations supplied by auxiliary power sources .49
Figure B.4 – Fieldbus model .51
Figure B.5 – Current modulation (Manchester II code) .52
Figure B.6 – Tree topology .53
Figure B.7 – Bus topology.54
Figure B.8 – Combination of the tree topology and the bus topology .54
Figure B.9 – Fieldbus extension.55
Figure B.10 – Recommended combination of shielding and earthing.67
Figure B.11 – Ideal combination of shielding and earthing .69
Figure B.12 – Capacitive earthing .70
Figure B.13 – Galvanic isolated field device.71

---------------------- Page: 8 ----------------------

SIST EN 61784-5-3:2012
61784-5-3 © IEC:2010(E) – 3 –
Figure B.14 – Pin assignment of the male and female connectors IEC 60947-5-2 (A-
coding) .74
Figure C.1 – End-to-end link without interconnections.90
Figure C.2 – Assembled end-to-end link .90
Figure C.3 – Connectionless optical fibre link .91
Figure C.4 – Assembled optical fibre link .91
Figure C.5 – Shielded connectors for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 fieldbus
networks .97
Figure C.6 – Pin-assignment for a straight cable.97

Table A.1 – Excerpt of MICE definition.13
Table A.2 – Basic network characteristics for balanced cabling not based on Ethernet
(ISO/IEC 8802-3) .15
Table A.3 – Network characteristics for optical fibre cabling.15
Table A.4 – Information relevant to copper cable: fixed cables.17
Table A.5 – Information relevant to optical fibre cables .18
Table A.6 – Connectors for copper cabling CPs not based on Ethernet.19
Table A.7 – Optical fibre connecting hardware .19
Table A.8 – Relationship between FOC and fibre types (CP 3/1).20
Table A.9 – Parameters for balanced cables.26
Table A.10 – Parameters for silica optical fibre cables .27
Table A.11 – Parameters for POF optical fibre cables .27
Table A.12 – Parameters for hard clad silica optical fibre cables.27
Table A.13 – Use of 9 pin Sub-D connector pins (RS 485) .29
Table A.14 – Use of 9 pin Sub-D connector pins (RS 485-IS).30
Table A.15 – Use of M12 connector pins (RS 485).31
Table A.16 – Use of M12 connector pins (RS 485-IS) .32
Table A.17 – Maximum fibre channel attenuation for CP 3/1 (PROFIBUS) .42
Table B.1 – Valid parameter range of the FISCO model for use as EEx ib IIC / IIB.50
Table B.2 – Valid parameter range of the FISCO model for use as EEx ia IIC .50
Table B.3 – Power supply (operational values) .56
Table B.4 – Line lengths which can be achieved .56
Table B.5 – Limit values for distortion, reflection and signal delay.57
Table B.6 – Recommended maximum cable lengths including spurs .57
Table B.7 – Recommended length of the spurs .57
Table B.8 – Maximum length of the splices .58
Table B.9 – Information relevant to copper cable: fixed cables.59
Table B.10 – Safety limit values for the fieldbus cable .60
Table B.11 – Connectors for copper cabling CPs not based on Ethernet.61
Table B.12 – Mixing devices from different categories .63
Table B.13 – Electrical characteristics of fieldbus interfaces .64
Table B.14 – Recommended data sheet specifications for CP 3/2 devices .65
Table B.15 – Parameters for balanced cables .73
Table B.16 – Contact assignments for the external connector for harsh industrial
environments .74

---------------------- Page: 9 ----------------------

SIST EN 61784-5-3:2012
– 4 – 61784-5-3 © IEC:2010(E)
Table C.1 – General transmission media selection information .79
Table C.2 – Network characteristics for balanced cabling based on Ethernet
(ISO/IEC 8802-3) .80
Table C.3 – Network characteristics for optical fibre cabling .80
Table C.4 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type A fixed cables .82
Table C.5 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type B flexible cables .82
Table C.6 – Information relevant to copper cable: CP 3/3, CP 3/4, CP 3/5 and CP 3/6
type C special cables.83
Table C.7 – Information relevant to optical fibre cables.83
Table C.8 – Requirements for plastic and hard clad silica optical fibre cables .84
Table C.9 – Requirements for glass multimode optical fibre cables .85
Table C.10 – Requirements for glass singlemode optical fibre cables .86
Table C.11 – Information relevant to hybrid cables (application type B) .87
Table C.12 – Information relevant to hybrid cables (application type C) .87
Table C.13 – Connectors for balanced cabling CPs based on Ethernet .88
Table C.14 – Optical fibre connecting hardware .89
Table C.15 – Relationship between FOC and fibre types (CP 3/3, CP 3/4, CP 3/5,
CP3/6) .89
Table C.16 – Typical fibre channels common for industrial applications. .92
Table C.17 – Parameters for balanced cables.95
Table C.18 – Parameters for silica optical fibre cables.96
Table C.19 – Parameters for POF optical fibre cables.96
Table C.20 – Parameters for hard clad silica optical fibre cables .96
Table C.21 – Colour coding for CP 3/3, CP 3/4, CP 3/5 and CP 3/6 connectors .97
Table C.22 – Maximum fibre channel attenuation for CP 3/3, CP 3/4, CP 3/5 and
CP 3/6 (PROFINET).101

---------------------- Page: 10 ----------------------

SIST EN 61784-5-3:2012
61784-5-3 © IEC:2010(E) – 5 –
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________

INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –

Part 5-3: Installation of fieldbuses –
Installation profiles for CPF 3


FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 61784-5-3 has been prepared by subcommittee 65C: Industrial
networks, of IEC technical committee 65: Industrial-process measurement, control and
automation.
This second edition cancels and replaces the first edition published in 2007. This edition
constitutes a technical revision.
This edition includes the technical changes of the corrigendum for the first edition in 2008 and
an addition concerning transmission performance measurement (see Annex C.6.3.2.1.2).
This standard is to be used in conjunction with IEC 61918:2010.

---------------------- Page: 11 ----------------------

SIST EN 61784-5-3:2012
– 6 – 61784-5-3 © IEC:2010(E)
The text of this standard is based on the following documents:
FDIS Report on voting
65C/602/FDIS 65C/616/RVD

Full information on the voting for the approval of this standard can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
A list of all parts of the IEC 61784-5 series, published under the general title Industrial
communication networks – Profiles – Installation of fieldbuses, can be found on the IEC
website.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC web site under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.
A bilingual version of this publication may be issued at a later date.

IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates
that it contains colours which are considered to be useful for the correct
understanding of its contents. Users should therefore print this document using a
colour printer.

---------------------- Page: 12 ----------------------

SIST EN 61784-5-3:2012
61784-5-3 © IEC:2010(E) – 7 –
INTRODUCTION
This International Standard is one of a series produced to facilitate the use of communication
networks in industrial control systems.
IEC 61918:2010 provides the common requirements for the installation of communication
networks in industrial control systems. This installation profile standard provides the
installation profiles of the communication profiles (CP) of a specific communication profile
family (CPF) by stating which requirements of IEC 61918 fully apply and, where necessary, by
supplementing, modifying, or replacing the other requirements (see Figure 1).
For general background on fieldbuses, their profiles, and relationship between the installation
profiles specified in this standard, see IEC/TR 61158-1.
Each CP installation profile is specified in a separate annex of this standard. Each annex is
structured exactly as the reference standard IEC 61918 for the benefit of the persons
representing the roles in the fieldbus installation process as defined in IEC 61918 (planner,
installer, verification personnel, validation personnel, maintenance personnel, administration
personnel). By reading the installation profile in conjunction with IEC 61918, these persons
immediately know which requirements are common for the installation of all CPs and which
are modified or replaced. The conventions used to draft this standard are defined in Clause 5.
The provision of the installation profiles in one standard for each CPF (for example
IEC 61784-5-3 for CPF 3), allows readers to work with standards of a convenient size.

PLANNING
DESIGN AND
INSTALLATION
Offices
GENERIC
OFFICE PREMISES ISO/IEC 11801
Annex
CABLING
Home
HOMES ISO/IEC 15018
Annex
ISO/IEC Data centre
DATA CENTRES ISO/IEC 24764
14763-2 Annex
BETWEEN
Industrial
AUTOMATION ISO/IEC 24702
Annex
ISLANDS
BETWEEN
AUTOMATION
Installation
INDUSTRIAL PREMISES IEC 61158
IEC 61918
ISLANDS
Profiles
series
IEC 61784-5 series
and
(Common
(Selection +
WITHIN
requirements)
IEC 61784-1, -2
Add/Repl/Mod)
AUTOMATION
ISLANDS
Com m on structure
APPLICATION-SPECIFIC
CABLING

Figure 1 – Standards relationships

---------------------- Page: 13 ----------------------

SIST EN 61784-5-3:2012
– 8 – 61784-5-3 © IEC:2010(E)
INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –

Part 5-3: Installation of fieldbuses –
Installation profiles for CPF 3



1 Scope
1
This part of IEC 61784 specifies the installation profiles for CPF 3 (PROFIBUS/PROFINET) .