SIST EN IEC 62052-11:2021/A11:2022
(Amendment)Electricity metering equipment - General requirements, tests and test conditions - Part 11: Metering equipment
Electricity metering equipment - General requirements, tests and test conditions - Part 11: Metering equipment
This part of IEC 62052 specifies requirements and associated tests, with their appropriate conditions for type testing of AC and DC electricity meters. This document details functional, mechanical, electrical and marking requirements, test methods, and test conditions, including immunity to external influences covering electromagnetic and climatic environments.
Elektrizitätszähler - Allgemeine Anforderungen, Prüfungen und Prüfbedingungen - Teil 11: Messeinrichtungen
Équipement de comptage de l'électricité - Exigences générales, essais et conditions d'essai - Partie 11: Équipement de comptage
Oprema za merjenje električne energije - Splošne zahteve, preskusi in preskuševalni pogoji - 11. del: Merilna oprema - Dopolnilo A11
Standard IEC 62052-11:2020 (E) določa zahteve in povezane preskuse z ustreznimi pogoji za tipsko preskušanje merilnikov električne energije za izmenični in enosmerni tok. Ta dokument podrobno opisuje funkcionalne, mehanske in električne zahteve ter zahteve glede označevanja, preskusne metode in preskusne pogoje, vključno z odpornostjo na zunanje vplive, ki zajemajo elektromagnetno okolje in podnebje.
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
SIST EN IEC 62052-11:2021/A11:2022
01-september-2022
Oprema za merjenje električne energije - Splošne zahteve, preskusi in
preskuševalni pogoji - 11. del: Merilna oprema - Dopolnilo A11
Electricity metering equipment - General requirements, tests and test conditions - Part
11: Metering equipment
Elektrizitätszähler - Allgemeine Anforderungen, Prüfungen und Prüfbedingungen - Teil
11: Messeinrichtungen
Équipement de comptage de l'électricité - Exigences générales, essais et conditions
d'essai - Partie 11: Équipement de comptage
Ta slovenski standard je istoveten z: EN IEC 62052-11:2021/A11:2022
ICS:
17.220.20 Merjenje električnih in Measurement of electrical
magnetnih veličin and magnetic quantities
91.140.50 Sistemi za oskrbo z elektriko Electricity supply systems
SIST EN IEC 62052-11:2021/A11:2022 en,fr
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
---------------------- Page: 2 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EUROPEAN STANDARD EN IEC 62052-11:2021/A11
NORME EUROPÉENNE
EUROPÄISCHE NORM June 2022
ICS 17.220.20
English Version
Electricity metering equipment - General requirements, tests and
test conditions - Part 11: Metering equipment
Équipement de comptage de l'électricité - Prescriptions Elektrizitätszähler - Allgemeine Anforderungen, Prüfungen
générales, essais et conditions d'essai - Partie 11: und Prüfbedingungen - Teil 11: Messeinrichtungen
Équipement de comptage
This amendment A11 modifies the European Standard EN IEC 62052-11:2021; it was approved by CENELEC on 2022-04-11. CENELEC
members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this amendment the
status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This amendment exists in three official versions (English, French, German). A version in any other language made by translation under the
responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as
the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the
Netherlands, Norway, Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2022 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN IEC 62052-11:2021/A11:2022 E
---------------------- Page: 3 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
Contents Page
European foreword . 3
Introduction . 4
1 Modification to Introduction . 4
2 Modification to Clause 1, “Scope” . 4
3 Modifications to Clause 2, “Normative references” . 4
4 Modifications to Clause 3, “Terms and definitions” . 4
5 Modifications to Clause 5, “Construction requirements” . 6
6 Modifications to Clause 6, “Meter marking and documentation”. 6
7 Modifications to Clause 7, “Metrological performance requirements and tests”. 7
8 Modifications to Clause 9, “The effects of external influence quantities and disturbances”
. 7
9 Modification to Clause 10, “Type test” . 8
10 Modification to Annex ZA, “Normative references to international publications with their
corresponding European publications” . 8
11 Addition of Annex ZZA, “Relationship between this European Standard and the essential
requirements of Directive 2014/32/EU aimed to be covered” and Annex ZZB, “Relationship
between this European standard and the essential requirements of Directive 2014/30/EU
[2014 OJ L96] aimed to be covered” .12
2
---------------------- Page: 4 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
European foreword
This document (EN IEC 62052-11:2021/A11:2022) has been prepared by CLC/TC 13 “Electrical energy
measurement and control”.
The following dates are fixed:
• latest date by which this document has to be (dop) 2023-04-11
implemented at national level by publication of
an identical national standard or by
endorsement
• latest date by which the national standards (dow) 2025-04-11
conflicting with this document have to be
withdrawn
This document amends EN IEC 62052-11:2021.
EN IEC 62052-11:2021/A11:2022 includes the following significant technical changes with respect to
EN IEC 62052-11:2021:
— adaptation to MID and EMCD, addition of Annexes ZZA and ZZB.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
This document has been prepared under Standardization Requests given to CENELEC by the European
Commission and the European Free Trade Association, and supports essential requirements of EU Directive(s)
/ Regulation(s).
For the relationship with EU Directive(s) / Regulation(s), see informative Annexes ZZA and ZZB, which are an
integral part of this document.
Any feedback and questions on this document should be directed to the users’ national committee. A complete
listing of these bodies can be found on the CENELEC website.
3
---------------------- Page: 5 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
Introduction
The purpose of this amendment is to identify and modify all requirements that would not fit the EMCD or MID
requirements, so that the amended document could be harmonized under those two Directives.
1 Modification to Introduction
Remove
“
IEC 62057-1: –, Test equipment, techniques and procedures for electrical energy meters – Part 1: Stationary
Meter Test Units (MTU)
”
2 Modification to Clause 1, “Scope”
Remove Note 10 and renumber Notes.
3 Modifications to Clause 2, “Normative references”
In Clause 2 and throughout the text, replace
“
IEC 61000-4-5:2017, Electromagnetic compatibility (EMC) – Part 4: Testing and measurement techniques –
Section 5: Surge immunity test
”
with
“
IEC 61000-4-5:2014/AMD1:2017, Electromagnetic compatibility (EMC) – Part 4: Testing and measurement
techniques – Section 5: Surge immunity test
”
Remove
“
IEC 62057-1: Test equipment, techniques and procedures for electrical energy meters – Part 1: Stationary Meter
Test Units (MTU)
”
4 Modifications to Clause 3, “Terms and definitions”
Replace 3.1.11 with:
“
3.1.11
reference standard
reference meter
meter used to measure the unit of electrical energy, designed and operated to obtain the highest accuracy and
stability in a controlled laboratory environment and traceable to national or international primary standards”
4
---------------------- Page: 6 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
Replace 3.1.14 with:
“
3.1.14
AC active power
is defined at any single sinusoidal frequency component of a periodic signal in a single-phase circuit as the
product of the RMS values of current and voltage and the cosine of the phase angle between them, where the
phase angle is the angle of the voltage signal vector with respect to the current signal vector
Note 1 to entry: Under sinusoidal conditions, the AC active power is the real part of the complex power.
Note 2 to entry: The AC active power of a non-sinusoidal periodic signal is the algebraic sum of the AC active power of
the sinusoidal frequency components.
Note 3 to entry: The coherent SI unit for AC active power is the watt, W.”
Replace 3.1.15 with:
“
3.1.15
active energy
electrical energy transformable into some other form of energy
Note 1 to entry: The coherent SI unit of active energy is joule, J. Another unit is watt hour. Its multiple, kilowatt hour, kWh,
is commonly used for billing consumers of electric energy and is therefore indicated on electric energy meters.
Note 2 to entry: For AC signals, the active energy is the time integral of the AC active power as defined under 3.1.14.
Note 3 to entry: For DC signals, the active energy is the time integral of the DC active power as defined under 3.1.25.
[SOURCE: IEV 601-01-19:1985, modified – Notes to entry added]”
Replace 3.1.25 with:
“
3.1.25
DC active power
DC power
power in DC circuit is defined as the product of the mean value of DC current and the mean value of DC voltage
Note 1 to entry: It is assumed that the DC voltage and current is constant over the integration period.”
Add the following 3.1.26, 3.1.27 and 3.1.28:
“
3.1.26
apparent power
product of the rms voltage U between the terminals of a two-terminal element or two-terminal circuit and the
rms electric current I in the element or circuit
S = UI
Note 1 to entry: Under sinusoidal conditions, the apparent power is the modulus of the complex power S, thus S = |S|
Note 2 to entry: The coherent SI unit for apparent power is voltampere, VA.
[SOURCE: IEV 131-11-41]
5
---------------------- Page: 7 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
3.1.27
power factor
λ
under periodic conditions, ratio of the absolute value of the active power P to the apparent power S:
P
λ=
S
Note 1 to entry: Under sinusoidal conditions, the power factor is the absolute value of the active factor.
Note 2 to entry: Active factor is also referred to as cos(φ) for active energy.
[SOURCE: IEV 131-11-46, modified – Note 2 to entry has been added]
3.1.28
non-active power factor
λ
~
to the apparent power S:
under periodic conditions, ratio of the non-active power Q∼
Q
~
λ =
~
S
Note 1 to entry: Under sinusoidal conditions, the non-active power factor is the absolute value of the reactive factor.
Note 2 to entry: Reactive factor is also referred to as sin(φ) for reactive energy.
[SOURCE: IEV 131-11-47, modified – Note 2 to entry has been added]”
5 Modifications to Clause 5, “Construction requirements”
Delete subclause 5.6.2, “Meters without indicating displays” and renumber the following subclause.
Add the following note to 5.1 after “The meter shall comply with the safety requirements covered in IEC 62052-
31:2015.“:
“
NOTE IEC 62052-31:2015 covers AC voltages only up to 600 V and Ed. 2 of IEC 62052-31 will cover AC voltages up
to 1000 V.”
6 Modifications to Clause 6, “Meter marking and documentation”
In 6.2, remove a).
In 6.2, remove d).
In 6.2, replace g) with
“
g) the minimum current, nominal current and the maximum current: I – I (I );
min n max
NOTE For example, 0,5 – 10(40) A, for a meter having a minimum current of 0,5 A, nominal current of 10 A and a
maximum current of 40 A.”
In 6.2, replace h) with
“
h) the rated secondary current of transformer(s) to which a transformer-operated meter should be connected,
for example /5 A or /1 A, may be included in the type designation;”
6
---------------------- Page: 8 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
7 Modifications to Clause 7, “Metrological performance requirements and tests”
In 7.1. replace
“
f) For requirements regarding test stations, see IEC 62057-1:–. ”
with
“
f) For requirements regarding test stations, see relevant or established test methods. ”
In 7.2. replace
“The verification of accuracy may be performed using any of the meter test methods specified in IEC 62057-1:
–, or alternatively by reading the meter’s energy registers. The content of the meter’s energy registers may be
verified by reading the energy registers through the meter’s communication ports using the communication
protocols specified by the manufacturer. ”
with
“The verification of accuracy may be performed using the relevant or established test methods, or alternatively
by reading the meter’s energy registers. The content of the meter’s energy registers may be verified by reading
the energy registers through the meter’s communication ports using the communication protocols specified by
the manufacturer.”
8 Modifications to Clause 9, “The effects of external influence quantities and
disturbances”
In 9.3.1.2.2, replace
“The manufacturer shall specify the number of test pulses necessary for the verification of accuracy, or an
alternative and equivalent method of verification of accuracy.”
with
“The number of test pulses necessary for the verification of accuracy shall be applied, or an alternative and
equivalent method of verification of accuracy shall be applied.”
In 9.3.2.1, add the following note to Table 16, “Voltage dips, short interruptions and voltage variations
immunity tests”:
“
NOTE 2 ΔU specifies the relative voltage reduction in Table 16. The basic standard IEC 61000-4-11 specifies the
residual voltage instead. Also, tests were modified partly compared to the basic standard based on long field experience
with TC 13 products.”
Renumber the original NOTE as “NOTE 1”.
In 9.3.2.2, add the following note to Table 17, “Voltage dips, short interruptions and voltage variations on
DC input power port immunity tests”:
“
NOTE ΔU specifies the relative voltage reduction in Table 17. The basic standard IEC 61000-4-11 specifies the
residual voltage instead. Also, tests were modified partly compared to the basic standard based on long field experience
with TC13 products.”
7
---------------------- Page: 9 ----------------------
SIST EN IEC 62052-11:2021/A11:2022
EN IEC 62052-11:2021/A11:2022 (E)
In 9.3.14, replace
“
e) Indicating display shall be exercised during the test with a test image constructed and provided by the
manufacturer according to the CISPR 32:2015, Clause B.2.”
with
“
e) Indicating display shall be exercised during the test with a test image according to the CISPR 32:2015, Clause
B.2.”
In 9.4.3, in the notes after Table 19, replace
“
a
Un-min and Un-max refer respectively to the lowest nominal voltage and to the highest nominal voltage specif
...
SLOVENSKI STANDARD
SIST EN IEC 62052-11:2021/oprAA:2021
01-september-2021
Oprema za merjenje električne energije - Splošne zahteve, preskusi in
preskuševalni pogoji - 11. del: Merilna oprema - Dopolnilo AA
Electricity metering equipment - General requirements, tests and test conditions - Part
11: Metering equipment
Elektrizitätszähler - Allgemeine Anforderungen, Prüfungen und Prüfbedingungen - Teil
11: Messeinrichtungen
Équipement de comptage de l'électricité - Exigences générales, essais et conditions
d'essai - Partie 11: Équipement de comptage
Ta slovenski standard je istoveten z: EN IEC 62052-11:2021/prAA
ICS:
17.220.20 Merjenje električnih in Measurement of electrical
magnetnih veličin and magnetic quantities
91.140.50 Sistemi za oskrbo z elektriko Electricity supply systems
SIST EN IEC 62052-11:2021/oprAA:2021 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
---------------------- Page: 2 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EUROPEAN STANDARD DRAFT
EN IEC 62052-11:2021
NORME EUROPÉENNE
EUROPÄISCHE NORM
prAA
July 2021
ICS 17.220.20
English Version
Electricity metering equipment - General requirements, tests and
test conditions - Part 11: Metering equipment
Équipement de comptage de l'électricité - Exigences Elektrizitätszähler - Allgemeine Anforderungen, Prüfungen
générales, essais et conditions d'essai - Partie 11: und Prüfbedingungen - Teil 11: Messeinrichtungen
Équipement de comptage
This draft amendment prAA, if approved, will modify the European Standard EN IEC 62052-11:2021; it is submitted to CENELEC members
for enquiry.
Deadline for CENELEC: 2021-10-15.
It has been drawn up by CLC/TC 13.
If this draft becomes an amendment, CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which
stipulate the conditions for giving this amendment the status of a national standard without any alteration.
This draft amendment was established by CENELEC in three official versions (English, French, German).
A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to
the CEN-CENELEC Management Centre has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the
Netherlands, Norway, Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.
Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are aware and to
provide supporting documentation.
Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without notice and
shall not be referred to as a European Standard.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2021 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Project: 73514 Ref. No. EN IEC 62052-11:2021/prAA E
---------------------- Page: 3 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
Contents Page
European foreword . 3
Introduction . 4
1 Modifications to Clause 3, “Terms and definitions” . 5
2 Modification to Clause 5, “Construction requirements” . 5
3 Modification to Clause 6, “Meter marking and documentation”. 5
4 Modifications to Clause 9, The effects of external influence quantities and disturbances . 6
5 Modification to Annex ZA, “Normative references to international publications with their
corresponding European publications” . 6
6 Addition of Annex ZZA, “Relationship between this European Standard and the essential
requirements of Directive 2014/32/EU aimed to be covered” and Annex ZZB,
“Relationship between this European standard and the essential requirements of
Directive 2014/30/EU [2014 OJ L96] aimed to be covered” . 9
2
---------------------- Page: 4 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
European foreword
This document (EN IEC 62052-11:2021/prAA:2021) has been prepared by CLC/TC 13 “Electrical energy
measurement and control”.
This document is currently submitted to the Enquiry.
The following dates are proposed:
• latest date by which the existence of this (doa) dor + 6 months
document has to be announced at national
level
• latest date by which this document has to be (dop) dor + 12 months
implemented at national level by publication of
an identical national standard or by
endorsement
• latest date by which the national standards (dow) dor + 36 months
conflicting with this document have to be (to be confirmed or
withdrawn modified when voting)
This document will amend EN IEC 62052-11:2021.
EN IEC 62052-11:2021/A11:2021 includes the following significant technical changes with respect to
EN IEC 62052-11:2021:
— adaptation to MID and EMCD, addition of Annexes ZZA and ZZB.
This document has been prepared under mandates given to CENELEC by the European Commission and the
European Free Trade Association, and supports essential requirements of EU Directive(s).
For the relationship with EU Directives see informative Annexes ZZA and ZZB, which are an integral part of
this document.
3
---------------------- Page: 5 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
Introduction
The purpose of this amendment is to identify and modify all requirements that would not fit the EMCD or MID
requirements, so that the amended document could be harmonized under those two directives.
4
---------------------- Page: 6 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
1 Modifications to Clause 3, “Terms and definitions”
Replace 3.1.14 with:
“
3.1.14
AC active power
AC active power at any single sinusoidal frequency component of a periodic signal in a single-phase circuit is
defined as the product of the RMS values of current and voltage and the cosine of the phase angle between
them, where the phase angle is the angle of the voltage signal vector with respect to the current signal vector
Note 1 to entry: Under sinusoidal conditions, the AC active power is the real part of the complex power.
Note 2 to entry: The AC active power of a non-sinusoidal periodic signal is the algebraic sum of the AC active power of
the sinusoidal frequency components.
Note 3 to entry: The coherent SI unit for AC active power is the watt, W.”
Replace 3.1.15 with:
“
3.1.15
active energy
electrical energy transformable into some other form of energy
Note 1 to entry: The coherent SI unit of active energy is joule, J. Another unit is watt hour. Its multiple, kilowatt hour,
kWh, is commonly used for billing consumers of electric energy and is therefore indicated on electric energy meters.
Note 2 to entry: For AC signals, the active energy is the time integral of the AC active power as defined under 3.1.14.
Note 3 to entry: For DC signals, the active energy is the time integral of the DC active power as defined under 3.1.25.
[SOURCE: IEV 601-01-19:1985, modified – Notes to entry added]”
Replace 3.1.25 with:
“
3.1.25
DC active power
power DC
power in DC circuit is defined as the product of the mean value of DC current and the mean value of DC
voltage
Note 1 to entry: It is assumed that the DC voltage and current is constant over the integration period.”
2 Modification to Clause 5, “Construction requirements”
Delete subclause 5.6.2, “Meters without indicating displays” and renumber the following subclause.
3 Modification to Clause 6, “Meter marking and documentation”
In 6.2, replace a) with:
“
a) name, registered trade name or registered trade mark and the postal address of the manufacturer;"
5
---------------------- Page: 7 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
4 Modifications to Clause 9, “The effects of external influence quantities and
disturbances”
In 9.3.2.1, add the following note to Table 16, “Voltage dips, short interruptions and voltage variations
immunity tests”:
“
NOTE 2 ΔU specifies the percentage voltage reduction in Table 16. The basic standard IEC 61000-4-11 specifies the
residual voltage instead. Also, tests were modified partly compared to the basic standard based on long field experience
with TC 13 products.”
Renumber the original NOTE as “NOTE 1”.
In 9.3.2.2, add the following note to Table 17, “Voltage dips, short interruptions and voltage variations on
DC input power port immunity tests”:
“
NOTE ΔU specifies the percentage voltage reduction in Table 17. The basic standard IEC 61000-4-11 specifies the
residual voltage instead. Also, tests were modified partly compared to the basic standard based on long field experience
with TC13 products.”
5 Modification to Annex ZA, “Normative references to international publications
with their corresponding European publications”
Replace the Annex ZA with the following:
“Annex ZA
(normative)
Normative references to international publications with their corresponding
European publications
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
NOTE 1 When an International Publication has been modified by common modifications, indicated by (mod), the
relevant EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 60038 (mod) 2009 IEC standard voltages EN 60038 2011
IEC 60068-2-1 2007 Environmental testing - Part 2–1: Tests - Test EN 60068-2-1 2007
A: Cold
IEC 60068-2-2 2007 Environmental testing - Part 2–2: Tests - Test EN 60068-2-2 2007
B: Dry heat
IEC 60068-2-5 2018 Environmental testing – Part 2–5: Tests – Test EN IEC 60068-2-5 2018
S: Simulated solar radiation at ground level
and guidance for solar radiation testing and
weathering
IEC 60068-2-6 2007 Environmental testing - Part 2–6: Tests - Test EN 60068-2-6 2008
Fc: Vibration (sinusoidal)
6
---------------------- Page: 8 ----------------------
SIST EN IEC 62052-11:2021/oprAA:2021
EN IEC 62052-11:2021/prAA:2021 (E)
Publication Year Title EN/HD Year
IEC 60068-2-27 2008 Environmental testing - Part 2–27: Tests - Test EN 60068-2-27 2009
Ea and guidance: Shock
IEC 60068-2-30 2005 Environmental testing - Part 2–30: Tests - Test EN 60068-2-30 2005
Db: Damp heat, cyclic (12 h + 12 h cycle)
IEC 60381-1 1982 Analogue signals for process control systems. HD 452.1 S1 1984
Part 1: Direct current signals
IEC 60404-5 2015 Magnetic materials - Part 5: Permanent EN 6
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.