This part of EN 12079 specifies requirements for the design, manufacture and marking of offshore freight and service containers with maximum gross mass not exceeding 25000 kg, intended for repeated use to, from and between offshore installations and ships.
This part of EN 12079 specifies only transport related requirements.
Other parts of the standard are:
EN 12079-2, Offshore containers and associated lifting sets - Part 2: Lifting sets - Design, manufacture and marking
EN 12079-3, Offshore containers and associated lifting sets - Part 3: Periodic inspection, examination and testing

  • Standard
    34 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This part of EN 12079 specifies requirements for lifting sets for use with containers in offshore service.
Other parts of the standard are:
EN 12079-1, Offshore containers and associated lifting sets – Part 1: Offshore container - Design, manufacture and marking
EN 12079-3, Offshore containers and associated lifting sets – Part 3: Periodic inspection, examination and testing

  • Standard
    14 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This part of EN 12079 specifies requirements for the periodic inspection, examination and testing of offshore freight and service containers, built in accordance with EN 12079-1, with maximum gross mass not exceeding 25000 kg and their associated lifting sets, intended for repeated use to, from and between offshore installations and ships. Inspection requirements following damage and repair of offshore containers are also included.
Other parts of the standard are:
EN 12079-1, Offshore containers and associated lifting sets - Part 1: Offshore container – Design, manufacture and marking
EN 12079-2, Offshore containers and associated lifting sets - Part 2: Lifting sets – Design, manufacture and marking
Guidance as to the knowledge and experience required by those responsible for carrying out periodic inspection and testing is given in Annex A 'Recommended knowledge and experience of staff responsible for inspection of offshore containers'
Guidance on pre-trip inspections is given in Annex B ' Recommended knowledge and experience of staff responsible for inspection of lifting sets intended for use with offshore containers'

  • Standard
    19 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This standard specifies transport related requirements for the design, construction and marking of offshore freight and service containers with maximum gross mass not exceeding 25000 kg, intended for repeated use to, from and between offshore installations and ships. It establishes a system for plating of offshore containers, linked to a defined scheme for periodic examination and test and introduces a requirement for pre-trip inspection of offshore containers.

  • Standard
    36 pages
    English language
    sale 10% off
    e-Library read for
    1 day