Oil and gas industries including lower carbon energy - Well integrity - Life cycle governance (ISO/DIS 16530:2024)

ISO 16530-1:2017 is applicable to all wells that are operated by the petroleum and natural gas industry. This document is applicable to any well, or group of wells, regardless of their age, location (including onshore, subsea and offshore wells) or type (e.g. naturally flowing, artificial lift, injection wells).
ISO 16530-1:2017 is intended to assist the petroleum and natural gas industry to effectively manage well integrity during the well life cycle by providing:
-      minimum requirements to ensure management of well integrity; and
-      recommendations and techniques that well operators can apply in a scalable manner based on a well's specific risk characteristics.
Assuring well integrity comprises two main building blocks: the first is to ensure well integrity during well design and construction, and the second is to manage well integrity throughout the remaining well life thereafter.
This document addresses each stage of the well life cycle, as defined by the six phases in a) to f), and describes the deliverables between each phase within a Well Integrity Management system.
a)    The "Basis of Design Phase" identifies the probable safety and environmental exposure to surface and subsurface hazards and risks that can be encountered during the well life cycle. Once identified, these hazards and risks are assessed such that control methods of design and operation can be developed in subsequent phases of the well life cycle.
b)    The "Design Phase" identifies the controls that are to be incorporated into the well design, such that appropriate barriers can be established to manage the identified safety and environmental hazards. The design addresses the expected, or forecasted, changes during the well life cycle and ensures that the required barriers in the well's design are based on risk exposure to people and the environment.
c)    The "Construction Phase" defines the required or recommended elements to be constructed (including rework/repair) and verification tasks to be performed in order to achieve the intended design. It addresses any variations from the design which require a revalidation against the identified hazards and risks.
d)    The "Operational Phase" defines the requirements or recommendations and methods for managing well integrity during operation.
e)    The "Intervention Phase" (including work-over) defines the minimum requirements or recommendations for assessing well barriers prior to, and after, any well intervention that involves breaking the established well barrier containment system.
f)     The "Abandonment Phase" defines the requirements or recommendations for permanently abandoning a well.
The six phases of the well life cycle, as defined in this Scope, and their interrelationships, are illustrated in Figure 1 in the Introduction.
ISO 16530-1:2017 is not applicable to well control. Well control refers to activities implemented to prevent or mitigate unintentional release of formation fluids from the well to its surroundings during drilling, completion, intervention and well abandonment operations, and involves dynamic elements, i.e. BOPs, mud pumps, mud systems, etc.
ISO 16530-1:2017 is not applicable to wellbore integrity, sometimes referred to as "borehole stability". Wellbore integrity is the capacity of the drilled open hole to maintain its shape and remain intact after having been drilled.

Öl- und Gasindustrie einschließlich kohlenstoffarmer Energieträger - Bohrungsintegrität - Lebenszykluslenkung (ISO/DIS 16530:2024)

Industries du pétrole et du gaz, y compris les énergies à faible teneur en carbone - Intégrité du puits - Gouvernance du cycle de vie (ISO/DIS 16530:2024)

Le présent document s'applique à tous les puits exploités par l'industrie du pétrole et du gaz naturel. Le présent document s'applique à tout puits ou groupe de puits, indépendamment de son âge, de sa localisation (y compris puits terrestre, sous-marin et en mer), de sa fonction, de son état ou de son type (par exemple : puits à écoulement naturel, en activation ou injection).
Il a pour objet d'aider l'industrie du pétrole et du gaz naturel à gérer efficacement l'intégrité du puits pendant son cycle de vie en fournissant :
—    les exigences minimales auxquelles satisfaire pour assurer la gestion de l'intégrité du puits ; et
—    les recommandations et les techniques que les exploitants de puits peuvent appliquer de manière évolutive, en fonction des caractéristiques de risque spécifiques d'un puits.
L'assurance de l'intégrité du puits repose sur deux composantes principales : premièrement, assurer l'intégrité du puits pendant sa conception et sa construction et, deuxièmement, gérer par la suite l'intégrité du puits pendant sa durée de vie restante.
Le présent document traite de chaque étape du cycle de vie du puits, telle que définie par les six phases de a) à f), et décrit les livrables requis entre chaque phase dans le cadre d'un système de gestion de l'intégrité du puits :
a)    La « Phase de base de conception » identifie les expositions probables, ayant une incidence sur la sécurité et l'environnement, aux phénomènes dangereux et risques en surface et subsurface pouvant être rencontrés pendant le cycle de vie du puits. Une fois identifiés, ces phénomènes dangereux et risques sont évalués de sorte que des méthodes de contrôle de la conception et de l'exploitation puissent être mises au point dans les phases suivantes du cycle de vie du puits.
b)    La « Phase de conception » identifie les mesures de contrôle à intégrer à la conception du puits, de manière à pouvoir établir des barrières appropriées pour gérer les phénomènes dangereux identifiés relatifs à la sécurité et à l'environnement. La conception traite des changements attendus ou prévus pendant le cycle de vie du puits et assure que les barrières nécessaires dans la conception du puits sont basées sur l'exposition au risque des personnes et de l'environnement.
c)    La « Phase de construction » définit les éléments qu'il est nécessaire ou recommandé de construire (y compris reprise/réparation) ainsi que les activités de vérification qu'il faut réaliser afin d'obtenir la conception désirée. Elle traite des changements dans la conception qui nécessitent une revalidation en fonction des phénomènes dangereux et risques identifiés. La phase de construction se termine généralement lorsque le puits est transféré à la fonction des opérations de production.
d)    La « Phase d'exploitation » définit les exigences ou recommandations et les méthodes concernant la gestion de l'intégrité du puits pendant son exploitation. En règle générale, les puits sont alors sous le contrôle de la fonction d'exploitation/de production.
e)    La « Phase d'intervention » (y compris reconditionnement) définit les exigences minimales ou les recommandations concernant l'évaluation des barrières du puits avant et après une intervention sur le puits nécessitant la rupture du système de confinement constitué par les barrières du puits.
f)     La « Phase d'abandon » définit les exigences ou les recommandations relatives à l'abandon définitif d'un puits.
Les six phases du cycle de vie du puits (y compris la réce

Naftna in plinska industrija, vključno z nizkoogljično energijo - Celovitost vrtine - Upravljanje življenjskega cikla (ISO/DIS 16530:2024)

General Information

Status
Not Published
Publication Date
28-Jun-2026
Current Stage
4060 - Closure of enquiry - Enquiry
Start Date
24-Feb-2025
Due Date
24-Feb-2025
Completion Date
24-Feb-2025

Relations

Buy Standard

Draft
prEN ISO 16530:2025 - BARVE
English language
137 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-februar-2025
Naftna in plinska industrija, vključno z nizkoogljično energijo - Celovitost vrtine -
Upravljanje življenjskega cikla (ISO/DIS 16530:2024)
Oil and gas industries including lower carbon energy - Well integrity - Life cycle
governance (ISO/DIS 16530:2024)
Öl- und Gasindustrie einschließlich kohlenstoffarmer Energieträger - Bohrungsintegrität -
Lebenszykluslenkung (ISO/DIS 16530:2024)
Industries du pétrole et du gaz, y compris les énergies à faible teneur en carbone -
Intégrité du puits - Gouvernance du cycle de vie (ISO/DIS 16530:2024)
Ta slovenski standard je istoveten z: prEN ISO 16530
ICS:
13.020.60 Življenjski ciklusi izdelkov Product life-cycles
75.180.10 Oprema za raziskovanje, Exploratory, drilling and
vrtanje in odkopavanje extraction equipment
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

DRAFT
International
Standard
ISO/DIS 16530
ISO/TC 67/SC 4
Oil and gas industries including
Secretariat: ANSI
lower carbon energy — Well
Voting begins on:
integrity — Life cycle governance
2024-12-02
ICS: ISO ics
Voting terminates on:
2025-02-24
THIS DOCUMENT IS A DRAFT CIRCULATED
FOR COMMENTS AND APPROVAL. IT
IS THEREFORE SUBJECT TO CHANGE
AND MAY NOT BE REFERRED TO AS AN
INTERNATIONAL STANDARD UNTIL
PUBLISHED AS SUCH.
This document is circulated as received from the committee secretariat.
IN ADDITION TO THEIR EVALUATION AS
BEING ACCEPTABLE FOR INDUSTRIAL,
TECHNOLOGICAL, COMMERCIAL AND
USER PURPOSES, DRAFT INTERNATIONAL
STANDARDS MAY ON OCCASION HAVE TO
ISO/CEN PARALLEL PROCESSING
BE CONSIDERED IN THE LIGHT OF THEIR
POTENTIAL TO BECOME STANDARDS TO
WHICH REFERENCE MAY BE MADE IN
NATIONAL REGULATIONS.
RECIPIENTS OF THIS DRAFT ARE INVITED
TO SUBMIT, WITH THEIR COMMENTS,
NOTIFICATION OF ANY RELEVANT PATENT
RIGHTS OF WHICH THEY ARE AWARE AND TO
PROVIDE SUPPORTING DOCUMENTATION.
Reference number
ISO/DIS 16530:2024(en)
DRAFT
ISO/DIS 16530:2024(en)
International
Standard
ISO/DIS 16530
ISO/TC 67/SC 4
Oil and gas industries including
Secretariat: ANSI
lower carbon energy — Well
Voting begins on:
integrity — Life cycle governance
ICS: ISO ics
Voting terminates on:
THIS DOCUMENT IS A DRAFT CIRCULATED
FOR COMMENTS AND APPROVAL. IT
IS THEREFORE SUBJECT TO CHANGE
AND MAY NOT BE REFERRED TO AS AN
INTERNATIONAL STANDARD UNTIL
PUBLISHED AS SUCH.
This document is circulated as received from the committee secretariat.
IN ADDITION TO THEIR EVALUATION AS
BEING ACCEPTABLE FOR INDUSTRIAL,
© ISO 2024
TECHNOLOGICAL, COMMERCIAL AND
USER PURPOSES, DRAFT INTERNATIONAL
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
STANDARDS MAY ON OCCASION HAVE TO
ISO/CEN PARALLEL PROCESSING
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
BE CONSIDERED IN THE LIGHT OF THEIR
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
POTENTIAL TO BECOME STANDARDS TO
WHICH REFERENCE MAY BE MADE IN
or ISO’s member body in the country of the requester.
NATIONAL REGULATIONS.
ISO copyright office
RECIPIENTS OF THIS DRAFT ARE INVITED
CP 401 • Ch. de Blandonnet 8
TO SUBMIT, WITH THEIR COMMENTS,
CH-1214 Vernier, Geneva
NOTIFICATION OF ANY RELEVANT PATENT
Phone: +41 22 749 01 11
RIGHTS OF WHICH THEY ARE AWARE AND TO
PROVIDE SUPPORTING DOCUMENTATION.
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland Reference number
ISO/DIS 16530:2024(en)
ii
ISO/DIS 16530:2024(en)
Contents Page
Foreword .vii
Introduction .viii
1 Scope . 1
2 Normative references . 2
3 Terms and definitions . 2
4 Abbreviated terms . 10
5 Non-Petroleum Wells.11
5.1 Abandoned Wells .11
5.2 Storage Wells - Flammable fluids (Gas, Oil, Hydrogen, etc) .11
5.3 Storage Wells - Non-flammable fluids (Carbon Capture (predominantly carbon
dioxide), Brines, Chemicals etc.) .11
5.4 Disposal Wells .11
5.5 Geothermal Wells .11
5.6 Solution Mining . 12
5.7 Aquifers . 12
6 Common elements of the well integrity life cycle .12
6.1 General . 12
6.2 Well integrity . 12
6.3 Well integrity policy . 12
6.4 Well integrity management system . 12
6.5 Risk assessment . 13
6.5.1 General . 13
6.5.2 Risk register .14
6.5.3 Well type risk profile . 15
6.6 Organizational structure and tasks . 15
6.7 Barriers . 15
6.7.1 General . 15
6.7.2 Barrier philosophy .16
6.7.3 Well barriers .16
6.7.4 Operational barriers .18
6.7.5 Human barriers .18
6.7.6 Administrative controls .18
6.7.7 Impact barriers .19
6.8 Performance standards for equipment .19
6.8.1 General .19
6.8.2 Well operating limits .19
6.9 Well barrier verification . 20
6.9.1 General . 20
6.9.2 Function testing . 20
6.9.3 Barrier verification testing . 20
6.9.4 Direction of flow .21
6.9.5 Effects of temperature .21
6.9.6 Modelling verification . 22
6.10 Reporting and documentation . 22
6.10.1 General . 22
6.10.2 Well integrity status reporting . 22
6.10.3 Well life cycle phase deliverables . 23
6.10.4 Well handover process . 23
6.11 Management of change .24
6.11.1 General .24
6.11.2 Dispensation from the WIMS . 25
6.12 Continuous improvement . . 25
6.12.1 General . 25

iii
ISO/DIS 16530:2024(en)
6.12.2 Key performance indicat
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.