Petroleum and natural gas industries - Drilling and production equipment - Part 1: Design and operation of marine drilling riser equipment (ISO 13624-1:2009)

ISO 13624-1:2009 pertains to the design, selection, operation and maintenance of marine riser systems for floating drilling operations. Its purpose is to serve as a reference for designers, for those who select system components, and for those who use and maintain this equipment. It relies on basic engineering principles and the accumulated experience of offshore operators, contractors, and manufacturers.
The marine drilling riser is best viewed as a system. It is necessary that designers, contractors, and operators realize that the individual components are recommended and selected in a manner suited to the overall performance of that system. For the purposes of ISO 13624-1:2009, a marine drilling riser system includes the tensioner system and all equipment between the top connection of the upper flex/ball joint and the bottom of wellhead conductor outer casing. It specifically excludes the diverter. Also, the applicability of ISO 13624-1:2009 is limited to operations with a subsea BOP stack deployed at the seafloor.
ISO 13624-1:2009 is directly applicable to most floating drilling operations, to special situations dealing with deepwater drilling and collapse, to the special considerations required for guidelineless drilling and to operations in cold-weather conditions and H2S considerations.
It is important that all riser primary-load-path components addressed in this International Standard be consistent with the load classifications specified in ISO 13625.

Erdöl- und Erdgasindustrie - Bohr- und Förderanlagen - Teil 1: Auslegung und Betrieb von Bohrförderanlagen auf See (ISO 13624-1:2009)

Industries du pétrole et du gaz naturel - Équipement de forage et de production - Partie 1: Conception et exploitation des tubes prolongateurs pour les forages en mer (ISO 13624-1:2009)

L'ISO 13624-1:2009 porte sur la conception, la sélection, le fonctionnement et la maintenance des tubes prolongateurs pour les forages flottants. Elle fait office de référence pour les concepteurs, ainsi que pour les personnes qui sélectionnent les composants du système et qui utilisent et entretiennent cet équipement. Elle repose sur des principes d'ingénierie et sur l'expérience acquise des exploitants, entrepreneurs et fabricants hauturiers.
Les tubes prolongateurs pour les forages en mer sont essentiellement perçus comme un système. Il est nécessaire que les concepteurs, les entrepreneurs et les exploitants conçoivent et sélectionnent les composants individuels de manière à s'adapter aux performances globales dudit système. Pour les besoins de l'ISO 13624-1:2009, un tube prolongateur pour les forages en mer est composé d'un système tensionneur et de tous les équipements placés entre le joint flexible/joint à rotule supérieur et le bas du tube de cuvelage extérieur du conducteur de tête de puits. Il exclut spécifiquement le dériveur. De même, l'applicabilité de l'ISO 13624-1:2009 se limite aux opérations d'un bloc d'obturation de puits sous-marin déployé au niveau des fonds marins.
L'ISO 13624-1:2009 s'applique directement aux opérations de forage le plus flottant ainsi qu'aux situations particulières de forage en eau profonde et écrasements. Les considérations particulières requises pour les forages sans câble de guidage sont également traitées, ainsi que les conditions par temps froid et les considérations H2S.
Il est important que les principaux composants du chemin de charge du tube abordés dans l'ISO 13624-1:2009 soient conformes aux classifications de charge spécifiées dans l'ISO 13625.

Industrija za predelavo nafte in zemeljskega plina - Vrtalna in proizvodna oprema - 1. del: Načrtovanje in delovanje dvižne opreme za vrtine na morju (ISO 13624-1:2009)

Ta del ISO 13624 se nanaša na načrtovanje, izbor, delovanje in vzdrževanje dvižne opreme na morju za plavajoče operacije vrtanja. Namenjen je temu, da služi kot referenca za načrtovalce, za tiste, ki izbirajo sistemske komponente, ter za tiste, ki uporabljajo in vzdržujejo to opremo. Osnovan je na osnovnih inženirskih načelih in akumuliranih izkušnjah operaterjev na morju, izvajalcev in proizvajalcev. Najboljše je, če na dvižno opremo za vrtine na morju gledamo kot na sistem. Načrtovalci, izvajalci in operaterji se morajo zavedati, da so posamezne komponente priporočene in izbrane na način, ki ustreza celovitemu delovanju sistema. Za namene tega dela ISO 13624 dvižni sistem za vrtine na morju zajema sistem napenjanja ter vso opremo med zgornjo povezavo zgornjega upogljivega/krogličnega spoja in spodnjim delom zunanjega ohišja prevodnika vrtalne glave. Izrecno izključuje preusmerjevalec. Veljavnost tega dela ISO 13624 je tudi omejena na delovanje s stolpom za preprečevanje izbruhov med vrtanjem, ki je nameščen pod vodno gladino na morskem dnu. Klavzule od 1 do 7 tega dela ISO 13624 veljajo neposredno za večino plavajočih operacij vrtanja. Posebne situacije so obravnavane v točkah 8.1 in 8.4, ki obravnavata globokomorsko vrtanje in sesedanje. Posebne zahteve, ki jih je potrebno upoštevati pri vrtanju brez vodil, so obravnavane v točki 8.2. Poleg tega točki 8.3 in 8.5 obravnavata operacije v pogojih hladnega vremena, kot tudi zadeve, na katere je potrebno paziti v zvezi s H2S. Pomembno je, da vse komponente dvižnega sistema, ki tvorijo pot primarnega nakladanja in ki so obravnavane v tem delu ISO 13624, ustrezajo klasifikacijam tovora, ki so določene v ISO 13625.

General Information

Status
Published
Publication Date
14-Nov-2009
Withdrawal Date
30-May-2010
Current Stage
6060 - Definitive text made available (DAV) - Publishing
Start Date
15-Nov-2009
Completion Date
15-Nov-2009

Buy Standard

Standard
EN ISO 13624-1:2010
English language
118 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Erdöl- und Erdgasindustrien - Bohr- und Förderanlagen - Auslegung und Betrieb von Bohrförderanlagen auf See (ISO 13624-1:2009)Industries du pétrole et du gaz naturel - Équipement de forage et de production - Partie 1: Conception et exploitation des tubes prolongateurs pour les forages en mer (ISO 13624-1:2009)Petroleum and natural gas industries - Drilling and production equipment - Part 1: Design and operation of marine drilling riser equipment (ISO 13624-1:2009)75.180.10Oprema za raziskovanje in odkopavanjeExploratory and extraction equipmentICS:Ta slovenski standard je istoveten z:EN ISO 13624-1:2009SIST EN ISO 13624-1:2010en,fr01-januar-2010SIST EN ISO 13624-1:2010SLOVENSKI
STANDARD
EUROPEAN STANDARD NORME EUROPÉENNE EUROPÄISCHE NORM
EN ISO 13624-1
November 2009 ICS 75.180.10 English Version
Petroleum and natural gas industries - Drilling and production equipment - Part 1: Design and operation of marine drilling riser equipment (ISO 13624-1:2009)
Industries du pétrole et du gaz naturel - Équipement de forage et de production - Partie 1: Conception et exploitation des tubes prolongateurs pour les forages en mer (ISO 13624-1:2009)
Erdöl- und Erdgasindustrien - Bohr- und Förderanlagen - Auslegung und Betrieb von Bohrförderanlagen auf See (ISO 13624-1:2009) This European Standard was approved by CEN on 29 September 2009.
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN Management Centre or to any CEN member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION EUROPÄISCHES KOMITEE FÜR NORMUNG
Management Centre:
Avenue Marnix 17,
B-1000 Brussels © 2009 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN ISO 13624-1:2009: ESIST EN ISO 13624-1:2010

Reference numberISO 13624-1:2009(E)© ISO 2009
INTERNATIONAL STANDARD ISO13624-1First edition2009-11-15Petroleum and natural gas industries — Drilling and production equipment — Part 1: Design and operation of marine drilling riser equipment Industries du pétrole et du gaz naturel — Équipement de forage et de production — Partie 1: Conception et exploitation des tubes prolongateurs pour les forages en mer
ISO 13624-1:2009(E) PDF disclaimer This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat accepts no liability in this area. Adobe is a trademark of Adobe Systems Incorporated. Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.
©
ISO 2009 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISO's member body in the country of the requester. ISO copyright office Case postale 56 • CH-1211 Geneva 20 Tel.
+ 41 22 749 01 11 Fax
+ 41 22 749 09 47 E-mail
copyright@iso.org Web
www.iso.org Published in Switzerland
ii © ISO 2009 – All rights reserved
ISO 13624-1:2009(E) © ISO 2009 – All rights reserved iii Contents Page Foreword.v Introduction.vi 1 Scope.1 2 Normative references.1 3 Terms, definitions, and abbreviations.2 3.1 Terms and definitions.2 3.2 Abbreviations.10 4 Component function and selection.11 4.1 Introduction.11 4.2 Component selection criteria.11 4.3 Marine drilling riser system.11 4.4 Tensioner system.13 4.5 Diverter system (surface).14 4.6 Telescopic joint (slip joint).14 4.7 Riser joints.16 4.8 Lower marine riser package (LMRP).17 4.9 Flex and ball joints.18 4.10 Flexible choke and kill lines.19 4.11 Riser running equipment.20 4.12 Riser-mounted choke/kill and auxiliary lines.21 4.13 Buoyancy equipment.22 4.14 Specialty equipment.23 5 Riser response analysis.24 5.1 General considerations.24 5.2 Riser analysis procedure.24 5.3 Design.25 5.4 General riser modelling and analysis approach.29 5.5 Coupled/decoupled analysis methodology.35 5.6 Drift-off/drive-off analysis methodology.36 5.7 Weak-point analysis methodology.37 5.8 Recoil analysis methodology.38 5.9 High-current environment.38 5.10 Hang-off analysis methodology.41 6 Riser operations.44 6.1 Introduction.44 6.2 Rise operations manual.44 6.3 Drilling-riser-operations information systems.44 6.4 Preparing to run riser.45 6.5 Riser running and retrieval.48 6.6 Installed riser operations.51 6.7 Emergency disconnect — Sudden storm, drive-/drift-off.57 7 Riser integrity.58 7.1 Basis of inspection requirements.58 7.2 Maintenance after riser retrieval.62 7.3 Other riser system maintenance.62 7.4 Transportation, handling, and storage.62 7.5 Scheduled field inspection and maintenance.64 7.6 In-service inspection.64 SIST EN ISO 13624-1:2010

ISO 13624-1:2009(E) iv © ISO 2009 – All rights reserved 7.7 Guidance on components for inspection.68 7.8 Inspection objectives and acceptance criteria.69 7.9 Operational records for riser components.71 8 Special situations.73 8.1 Deep-water drilling.73 8.2 Guidelineless systems.76 8.3 Cold weather considerations.76 8.4 Riser collapse considerations.77 8.5 H2S considerations.78 Annex A (informative)
Riser analy
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.