Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants - Conformance testing

Specifies standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended.

Windenergieanlagen - Teil 25-5: Kommunikation für die Überwachung und Steuerung von Windenergieanlagen - Konformitätsprüfungen

Eoliennes - Partie 25-5: Communications pour la surveillance et la commande des centrales éoliennes - Essais de conformité

Sistemi generatorjev vetrne turbine - 25-5. del: Komunikacije za spremljanje in nadzor vetrnih elektrarn - Preskušanje skladnosti (IEC 61400-25-5:2006)

General Information

Status
Withdrawn
Publication Date
27-Feb-2007
Withdrawal Date
31-Jan-2010
Technical Committee
Drafting Committee
Parallel Committee
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
25-Oct-2020
Completion Date
25-Oct-2020

Relations

Buy Standard

Standard
EN 61400-25-5:2007
English language
48 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day
Draft
prEN 61400-25-5:2005
English language
38 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants - Conformance testingSistemi generatorjev vetrne turbine - 25-5. del: Komunikacije za spremljanje in nadzor vetrnih elektrarn - Preskušanje skladnosti (IEC 61400-25-5:2006)Eoliennes - Partie 25-5: Communications pour la surveillance et la commande des centrales éoliennes - Essais de conformitéWindenergieanlagen - Teil 25-5: Kommunikation für die Überwachung und Steuerung von Windenergieanlagen - KonformitätsprüfungenTa slovenski standard je istoveten z:EN 61400-25-5:2007SIST EN 61400-25-5:2007en,de27.180Sistemi turbin na veter in drugi alternativni viri energijeWind turbine systems and other alternative sources of energyICS:SLOVENSKI
STANDARDSIST EN 61400-25-5:200701-november-2007







EUROPEAN STANDARD EN 61400-25-5 NORME EUROPÉENNE
EUROPÄISCHE NORM February 2007
CENELEC European Committee for Electrotechnical Standardization Comité Européen de Normalisation Electrotechnique Europäisches Komitee für Elektrotechnische Normung
Central Secretariat: rue de Stassart 35, B - 1050 Brussels
© 2007 CENELEC -
All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61400-25-5:2007 E
ICS 27.180
English version
Wind turbines -
Part 25-5: Communications for monitoring
and control of wind power plants -
Conformance testing (IEC 61400-25-5:2006)
Eoliennes -
Partie 25-5: Communications
pour la surveillance et la commande
des centrales éoliennes - Essais de conformité (CEI 61400-25-5:2006)
Windenergieanlagen -
Teil 25-5: Kommunikation
für die Überwachung und Steuerung
von Windenergieanlagen -
Konformitätsprüfungen (IEC 61400-25-5:2006)
This European Standard was approved by CENELEC on 2007-02-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom.



EN 61400-25-5:2007
- 2 -
Foreword The text of document 88/277/FDIS, future edition 1 of IEC 61400-25-5, prepared by IEC TC 88, Wind turbines, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61400-25-5 on 2007-02-01. The following dates were fixed: – latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement
(dop)
2007-11-01 – latest date by which the national standards conflicting
with the EN have to be withdrawn
(dow)
2010-02-01 Annex ZA has been added by CENELEC. __________ Endorsement notice The text of the International Standard IEC 61400-25-5:2006 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 61850-4 NOTE
Harmonized as EN 61850-4:2002 (not modified). IEC 61850-5 NOTE
Harmonized as EN 61850-5:2003 (not modified). IEC 61850-6 NOTE
Harmonized as EN 61850-6:2004 (not modified). IEC 61850-7-3 NOTE
Harmonized as EN 61850-7-3:2003 (not modified). IEC 61850-8-1 NOTE
Harmonized as EN 61850-8-1:2004 (not modified). __________



- 3 - EN 61400-25-5:2007 Annex ZA
(normative)
Normative references to international publications with their corresponding European publications
The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.
NOTE
When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies.
Publication Year Title EN/HD Year
IEC 61400-25 Series Wind turbines -
Part 25: Communications for monitoring and control of wind power plant EN 61400-25 Series
IEC 61850-7-1 2003 Communication networks and systems in substations -
Part 7-1: Basic communication structure for substation and feeder equipment - Principles and models EN 61850-7-1 2003
IEC 61850-7-2 2003 Communication networks and systems
...

SLOVENSKI oSIST prEN 61400-25-5:2005

PREDSTANDARD
november 2005
Sistemi generatorjev vetrne turbine – 25-5. del: Komunikacije za spremljanje
in nadzor vetrnih elektrarn – Preskušanje skladnosti
Wind turbines – Part 25-5: Communications for monitoring and control of wind
power plants – Conformance testing
ICS 27.180; 35.240.50 Referenčna številka
oSIST prEN 61400-25-5:2005(en)
©  Standard je založil in izdal Slovenski inštitut za standardizacijo. Razmnoževanje ali kopiranje celote ali delov tega dokumenta ni dovoljeno

---------------------- Page: 1 ----------------------
88/242/CDV
COMMITTEE DRAFT (CD)

Project number
IEC/TC or SC:
IEC 61400-25-5 Ed.1
TC 88
Date of circulation Closing date for comments
Title of TC/SC:
2005-08-05 2006-01-06
Wind turbines
Also of interest to the following committees Supersedes document
TC 57 88/217/CD & 88/237/CC
Functions concerned:
   Safety   EMC   Environment   Quality assurance
Secretary:
THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT
SHOULD NOT BE USED FOR REFERENCE PURPOSES.
A.C. van der Giessen
RECIPIENTS OF THIS DOCUMENT ARE INVITED TO SUBMIT, WITH THEIR
COMMENTS, NOTIFICATION OF ANY RELEVANT PATENT RIGHTS OF
WHICH THEY ARE AWARE AND TO PROVIDE SUPPORTING
DOCUMENTATION.

Title: Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants –
Conformance testing
Introductory note
This CDV contains a solution for communications for monitoring and control of wind power plants. IEC
61400-25 defines wind power plant specific information, the mechanisms for information exchange and
the mapping to communication protocols.
IEC 61400-25 consists of the following parts, under the general title Communications for monitoring and
control of wind power plants:
Part 25-1 Overall description of principles and models
Part 25-2: Information models
Part 25-3: Information exchange models
Part 25-4: Mapping to communication profile
Part 25-5: Conformance testing
The documents have been drawn up by IEC TC88 Project Team 25, consisting of experts from many of
the large vendors as well as representatives of utilities, consultants and suppliers of third-party products.
All parts are distributed for comments and voting simultaneously, as committee drafts for voting (CDV).
No major technical changes have been made as a result of the comments and proposals received on the
CD (88/217/CD), most comments having been editorial.


ATTENTION ATTENTION

CDV soumis en parallèle au vote (CEI) Parallel IEC CDV/CENELEC Enquiry
et à l’enquête (CENELEC)


Copyright © 2005 International Electrotechnical Commission, IEC. All rights reserved. It is
permitted to download this electronic file, to make a copy and to print out the content for the sole
purpose of preparing National Committee positions. You may not copy or "mirror" the file or printed
version of the document, or any part of it, for any other purpose without permission in writing from IEC.
FORM CD (IEC)
International Electrotechnical Commission, IEC
©
2002-08-08
Commission Électrotechnique Internationale, CEI

---------------------- Page: 2 ----------------------
– 2 –
61400-25-5 Ed.1/CDV © IEC:2005
1
2
3 WIND TURBINES
4 Part 25-5:
5 Communications for monitoring and control of wind power plants –
6 Conformance testing
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 Version: 61400-25-5_R0-4 Draft1CDV_2005-07-11

---------------------- Page: 3 ----------------------
– 3 –
61400-25-5 Ed.1/CDV © IEC:2005
1
2 CONTENTS
3 FOREWORD.5
4 INTRODUCTION.6
5 1 Scope .7
6 2 Normative references .9
7 3 Terms and definitions .11
8 4 Abbreviated terms .13
9 5 Introduction to conformance testing .14
10 5.1 General .14
11 5.2 Conformance test procedures .14
12 5.3 Quality assurance and testing .15
13 5.3.1 General .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.