Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses - Installation profiles for CPF 3

Superseded by EN 61784-5-3:2012

Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 3

Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de terrain - Profils d'installation pour CPF 3

Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 3 (IEC 61784-5-3:2007)

General Information

Status
Withdrawn
Publication Date
12-Jun-2008
Withdrawal Date
30-Apr-2011
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
19-Oct-2014
Completion Date
19-Oct-2014

Relations

Buy Standard

Standard
EN 61784-5-3:2008
English language
114 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-september-2008
Industrijska komunikacijska omrežja - Profili - 5-3. del: Inštalacija procesnih vodil -
Inštalacijski profili za CPF 3 (IEC 61784-5-3:2007)
Industrial communication networks - Profiles - Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3
Industrielle Kommunikationsnetze - Profile - Teil 5-3: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 3
Réseaux de communication industriels - Profils - Partie 5-3: Installation des bus de
terrain - Profils d'installation pour CPF 3
Ta slovenski standard je istoveten z: EN 61784-5-3:2008
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.05 9HþVORMQHXSRUDEQLãNH Multilayer applications
UHãLWYH
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 61784-5-3
NORME EUROPÉENNE
June 2008
EUROPÄISCHE NORM
ICS 35.100.05; 25.040.40
English version
Industrial communication networks -
Profiles -
Part 5-3: Installation of fieldbuses -
Installation profiles for CPF 3
(IEC 61784-5-3:2007)
Réseaux de communication industriels -  Industrielle Kommunikationsnetze -
Profils - Profile -
Partie 5-3: Installation des bus de terrain - Teil 5-3: Feldbusinstallation -
Profils d'installation pour CPF 3 Installationsprofile
(CEI 61784-5-3:2007) für die Kommunikationsprofilfamilie 3
(IEC 61784-5-3:2007)
This European Standard was approved by CENELEC on 2008-05-01. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the
Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,
Sweden, Switzerland and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Central Secretariat: rue de Stassart 35, B - 1050 Brussels

© 2008 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61784-5-3:2008 E
Foreword
The text of document 65C/471/FDIS, future edition 1 of IEC 61784-5-3, prepared by SC 65C,
Industrial networks, of IEC TC 65, Industrial-process measurement, control and automation, was
submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61784-5-3 on
2008-05-01.
This standard is to be used in conjunction with EN 61918:2008.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2009-02-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2011-05-01
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 61784-5-3:2007 was approved by CENELEC as a
European Standard without any modification.
__________
- 3 - EN 61784-5-3:2008
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year

1)
- - Electrical apparatus for potentially EN 50020 -
explosive atmospheres - Intrinsic safety 'i'

IEC 60079-0 2004 Electrical apparatus for explosive gas EN 60079-0 2006
(mod) atmospheres -
Part 0: General requirements
IEC 60079-11 2006 Explosive atmospheres -
+ corr. December 2006 Part 11: Equipment protection by intrinsic EN 60079-11 2007
safety "i"
IEC 60079-27 2005 Electrical apparatus for explosive gas EN 60079-27 2006
atmospheres -
Part 27: Fieldbus intrinsically safe concept
(FISCO) and Fieldbus non-incendive
concept (FNICO)
IEC 60793-2-10 2007 Optical fibres - EN 60793-2-10 2007
Part 2-10: Product specifications -
Sectional specification for category A1
multimode fibres
IEC 60793-2-50 2004 Optical fibres - EN 60793-2-50 2004
Part 2-50: Product specifications - + corr. July 2004
Sectional specification for class B
single-mode fibres
IEC 61000-4-2 1995 Electromagnetic compatibility (EMC) - EN 61000-4-2 1995
A1 1998 Part 4-2: Testing and measurement A1 1998
A2 2000 techniques - Electrostatic discharge A2 2001
immunity test
IEC/PAS 61076-2-107
2007 Connectors for electronic equipment - - -
Product requirements -
Part 2-107: Detail specification for circular
hybrid connectors M12 with electrical and
fibre-optical contacts with screw-locking

IEC 61156-5 2002 Multicore and symmetrical pair/quad - -
cables for digital communications -
Part 5: Symmetrical pair/quad cables with
transmission characteristics up to 600 MHz -
Horizontal floor wiring - Sectional
specification
1)
Undated reference.
Publication Year Title EN/HD Year

IEC 61508 Series Functional safety of EN 61508 Series
electrical/electronic/programmable electronic
safety-related systems
IEC 61918 (mod) 2007 Industrial communication networks - EN 61918 2008
Installation of communication networks in
industrial premises
1)
ANSI TIA/EIA-485-A - Electrical Characteristics of Generators - -
and Receivers for Use in Balanced Digital
Multipoint Systems
IEC 61784-5-3
Edition 1.0 2007-12
INTERNATIONAL
STANDARD
Industrial communication networks – Profiles –
Part 5-3: Installation of fieldbuses – Installation profiles for CPF 3

INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
PRICE CODE
XE
ICS 35.100.05 25.040.40 ISBN 2-8318-9403-4

– 2 – 61784-5-3 © 2007:IEC(E)
CONTENTS
FOREWORD.7
INTRODUCTION.9
1 Scope.10
2 Normative references .10
3 Terms, definitions and abbreviated terms .10
4 CPF 3: Overview of installation profiles .10
5 Installation profile conventions .10
6 Conformance to installation profiles.11
Annex A (normative) CP 3/1 specific installation profile .12
A.1 Installation profile scope.12
A.2 Normative references .12
A.3 Installation profile terms, definitions, and abbreviated terms.12
A.3.1 Terms and definitions .12
A.3.2 Abbreviated terms .12
A.3.3 Conventions for installation profiles .13
A.4 Installation planning .13
A.4.1 Introduction .13
A.4.2 Planning requirements.13
A.4.3 Network capabilities .15
A.4.4 Selection and use of cabling components .18
A.4.5 Cabling planning documentation.28
A.4.6 Verification of cabling planning specification.28
A.5 Installation implementation .28
A.5.1 General requirements .28
A.5.2 Cable installation.28
A.5.3 Connector installation.31
A.5.4 Terminator installation .35
A.5.5 Device installation .35
A.5.6 Coding and labeling.35
A.5.7 Earthing and bonding of equipment and device and shielded cabling.35
A.5.8 As-implemented cabling documentation.36
A.6 Installation verification and installation acceptance test.36
A.6.1 Introduction .36
A.6.2 Installation verification.37
A.6.3 Installation acceptance test .38
A.7 Installation administration.44
A.8 Installation maintenance and installation troubleshooting .44
A.8.1 General .44
A.8.2 Maintenance.44
A.8.3 Troubleshooting.44
A.8.4 Specific requirements for maintenance and troubleshooting .44
Annex B (normative)  CP 3/2 (PROFIBUS) specific installation profile.46
B.1 Installation profile scope.46
B.2 Normative references .46
B.3 Installation profile terms, definitions, and abbreviated terms.46
B.3.1 Terms and definitions .46
B.3.2 Abbreviated terms .47

61784-5-3 © 2007:IEC(E) – 3 –
B.3.3 Conventions for installation profiles .47
B.4 Installation planning .48
B.4.1 Introduction .48
B.4.2 Planning requirements.49
B.4.3 Network capabilities .57
B.4.4 Selection and use of cabling components .62
B.4.5 Cabling planning documentation.77
B.4.6 Verification of cabling planning specification.77
B.5 Installation implementation .77
B.5.1 General requirements .78
B.5.2 Cable installation.78
B.5.3 Connector installation.79
B.5.4 Terminator installation .80
B.5.5 Device installation .80
B.5.6 Coding and labelling .80
B.5.7 Earthing and bonding of equipment and device and shielded cabling.80
B.5.8 As-implemented cabling documentation.80
B.6 Installation verification and i
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.