Corrigendum 1 - Maritime navigation and radiocommunication equipment and systems - Integrated navigation systems - Part 2: Modular structure for INS - Operational and performance requirements, methods of testing and required test results

General Information

Status
Published
Publication Date
04-Nov-2013
Current Stage
DELPUB - Deleted Publication
Completion Date
12-Feb-2021
Ref Project

Relations

Buy Standard

Standard
IEC 61924-2:2012/COR1:2013 - Corrigendum 1 - Maritime navigation and radiocommunication equipment and systems - Integrated navigation systems - Part 2: Modular structure for INS - Operational and performance requirements, methods of testing and required test results Released:11/5/2013
English language
10 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


IEC 61924-2
(First edition – 2012)
Maritime navigation and radiocommunication equipment and systems –
Integrated navigation systems –

Part 2: Modular structure for INS –

Operational and performance requirements, methods of testing

and required test results
CO RRI G E NDUM 1
Clause K.2 ACM – Alert command

Replace, in the title and the sentence definition (fourth paragraph) ACM by ACN as follows:

K.2 ACN – Alert command
$--ACN,hhmmss.ss, aaa, x.x, x.x, c, a*hh

Clause K.5 ARC – Alert command refused

Replace the existing sentence in this clause, by the following new sentence:

$--ARC, hhmmss.ss, aaa, x.x, x.x, c*hh
Refused alert command, A, Q, O or S (see Note 5)
Alert instance, 1 to 999999 (see Note 4)
Alert identifier (see Note 3)
Manufacturer mnemonic code (see Note 2)
Time (see Note 1)
Replace, in Note 5, ACM by ACN as follows:
NOTE 5 Refused Alert Command: Indicates refused “Alert command” of a corresponding ACN sentence. This
should not be a null field.
This change of designation of the alert command has to be updated throughout IEC 61924-2 as
follows:
Table of contents, the title of Table J.2 now reads: Conversion from ACN to ACK

Replace ACM by ACN in the following clauses, subclauses, tables and figures:

rd
8.9.1.1 3 paragraph
th
8.9.5.2.2 4 bullet
rd
Table F.1 3 row
nd
Table F.2 2 row
th
J.3.1 7 bullet
J.3.1 NOTE after 7th bullet 2 occurrences
J.3.2 Title
November 2013
– 2 –
st
1 paragrap
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.