Execution of special geotechnical works - Reinforced fill

Popravek k standardu SIST EN 14475:2006
This European Standard establishes general principles for the construction of reinforced fill. This European Standard covers engineered fills that are reinforced by the inclusion of horizontal or subhorizontal reinforcement placed between layers of fill during construction. The scope of reinforced fill applications considered in this European Standard includes (Figure 1): ç earth retaining structures, (vertical, battered or inclined walls, bridge abutments, bulk storage facilities), with a facing to retain fill placed between the reinforcing layers; ç reinforced steep slopes with a facing, either built-in or added or wrap-around, reinforced shallow slopes without a facing, but covered by some form of erosion protection without a facing, reinstatement of failed slopes; ç embankments with basal reinforcement and embankments with reinforcement against frost heave in the upper part. Principles for the execution of other special geotechnical works using soil nails, bored piles, displacement piles, micro piles, sheet pile walls, diaphragm walls, grouting or jet grouting are established in other European Standards. Reinforcement of road pavements is not covered by this Standard.

Ausführung von besonderen technischen Arbeiten (Spezialtiefbau) - Bewehrte Schüttkörper

Exécution de travaux géotechniques spéciaux - Remblais renforcés

Izvedba posebnih geotehničnih del - Armirano polnilo

General Information

Status
Published
Publication Date
18-Sep-2007
Technical Committee
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
06-Sep-2007
Due Date
11-Nov-2007
Completion Date
19-Sep-2007

Relations

Buy Standard

Corrigendum
EN 14475:2006/AC:2007
English and German language
2 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Execution of special geotechnical works - Reinforced fillExécution de travaux géotechniques spéciaux - Remblais renforcésAusführung von besonderen technischen Arbeiten (Spezialtiefbau) - Bewehrte SchüttkörperTa slovenski standard je istoveten z:EN 14475:2006/AC:2006SIST EN 14475:2006/AC:2007en,de93.020Zemeljska dela. Izkopavanja. Gradnja temeljev. Dela pod zemljoEarthworks. Excavations. Foundation construction. Underground worksICS:SLOVENSKI
STANDARDSIST EN 14475:2006/AC:200701-oktober-2007







EUROPEAN STANDARDNORME EUROPÉENNEEUROPÄISCHE NORMEN 14475:2006/ACSeptember 2006Septembre 2006September 2006ICS 93.020English versionVersion FrançaiseDeutsche FassungExecution of special geotechnical works - Reinforced fillExécution de travaux géotechniquesspéciaux - Remblais renforcésAusführung von besonderen technischenArbeiten (Spezialtiefbau) - BewehrteSchüttkörperThis corrigendum becomes effective on 20 September 2006 for incorporation in the official Germanand English versions of the EN.Ce corrigendum prendra effet le 20 septembre 2006 pour incorporation dans les versions officiellesallemande et anglaise de la EN.Die Berichtigung tritt am 20.September 2006 zur Einarbeitung in die offizielle Deutsche und EnglischeFassung der EN in Kra
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.