This part of IEC 62264 defines transactions in terms of information exchanges between applications performing business and manufacturing activities associated with Levels 3 and 4. The exchanges are intended to enable information collection, retrieval, transfer and storage in support of Enterprise-Control system integration. This part of IEC 62264 is consistent with the IEC 62264-1 models and terminology and IEC 62264-2 object model attributes. This standard also defines transactions that specify how to exchange the objects defined in IEC 62264-1, Clause 7, IEC 62264-2 and this standard. Other uses of the transaction model are not defined in this part. The models covered in this standard are: Personnel Model, Equipment Model, Maintenance Model, Material Model, Process Segment Model, Production Capability Model, Product Definition Model, Production Schedule Model, and Production Performance Model.
Integration von Unternehmensführungs- und Leitsystemen - Teil 5: Transaktionen zwischen Geschäftsabläufen und Produktionssteuerung (IEC 62264-5:2011)
Intégration du système de commande d'entreprise - Partie 5: Transactions entre systèmes de gestion de commande d'entreprise et systèmes de fabrication (CEI 62264-5:2011)
La CEI 62264-5:2011 définit des transactions en termes d'échanges d'informations entre des applications d'activités commerciales et de fabrication associées aux Niveaux 3 et 4. L'objectif de ces échanges est la capture, l'extraction, le transfert et le stockage des informations, confortant en cela l'intégration du système d'entreprise. La présente partie de la CEI 62264 est conforme aux modèles et à la terminologie de la CEI 62264-1 et aux attributs des modèles d'objet de la CEI 62264-2. Cette norme définit également des transactions spécifiant comment échanger les objets définis à l'Article 7 de la CEI 62264-1, la CEI 62264-2 et la présente norme. Les modèles traités dans la présente norme sont: les modèles associés aux ressources humaine, l'équipement, la maintenance, la matière, le processus, la capacité de production, la définition du produit, l'ordonnancement de production et la performance de production.
Integracija sistemov za upravljanje podjetij - 5. del: Prenosi posla v proizvodnjo (IEC 62264-5:2011)
Ta del standarda IEC 62264 določa prenose v smislu izmenjave informacij med aplikacijami, ki izvajajo poslovne in proizvodne dejavnosti, povezane z ravnema 3 in 4. Izmenjave so namenjene omogočanju zbiranja, pridobivanja, prenosa in shranjevanja v podporo integraciji sistemov za upravljanje podjetij. Ta del standarda IEC 62264 je skladen z modeli in terminologijo iz standarda IEC 62264-1 ter lastnostmi objektnega modela iz standarda IEC 62264-2. Ta standard opredeljuje tudi prenose, ki določajo, kako je treba izmenjati predmete iz točke 7 standarda IEC 62264-1, IEC 62264-2 in tega standarda. Drugi načini uporabe modela prenosa v tem delu niso opredeljeni. V tem standardu so zajeti naslednji modeli: model za osebje, model za opremo, model za vzdrževanje, model za material, model za procesni segment, model za proizvodno zmogljivost, model za opredelitev izdelkov, model za razpored proizvodnje in model za zmogljivost proizvodnje.
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
SIST EN 62264-5:2012
01-maj-2012
Integracija sistemov za upravljanje podjetij - 5. del: Prenosi posla v proizvodnjo
(IEC 62264-5:2011)
Enterprise system integration - Part 5: Business to manufacturing transactions (IEC
62264-5:2011)
Integration von Unternehmensführungs- und Leitsystemen - Teil 5: Transaktionen
zwischen Geschäftsabläufen und Produktionssteuerung (IEC 62264-5:2011)
Intégration du système de commande d'entreprise - Partie 5: Transactions entre
systèmes de gestion de commande d'entreprise et systèmes de fabrication (CEI 62264-
5:2011)
Ta slovenski standard je istoveten z: EN 62264-5:2012
ICS:
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
SIST EN 62264-5:2012 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST EN 62264-5:2012
---------------------- Page: 2 ----------------------
SIST EN 62264-5:2012
EUROPEAN STANDARD
EN 62264-5
NORME EUROPÉENNE
March 2012
EUROPÄISCHE NORM
ICS 25.040.99; 35.100; 35.200
English version
Enterprise system integration -
Part 5: Business to manufacturing transactions
(IEC 62264-5:2011)
Intégration du système de commande Integration von Unternehmensführungs-
d'entreprise - und Leitsystemen -
Partie 5: Transactions entre systèmes de Teil 5: Transaktionen zwischen
gestion de commande d'entreprise et Geschäftsabläufen und
systèmes de fabrication Produktionssteuerung
(CEI 62264-5:2011) (IEC 62264-5:2011)
This European Standard was approved by CENELEC on 2012-02-03. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland, Turkey and the United Kingdom.
CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
Management Centre: Avenue Marnix 17, B - 1000 Brussels
© 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 62264-5:2012 E
---------------------- Page: 3 ----------------------
SIST EN 62264-5:2012
EN 62264-5:2012 - 2 -
The text of document 65E/100/CDV, future edition 1 of IEC 62264-5, prepared by SC 65E, "Devices and
integration in enterprise systems", of IEC TC 65, "Industrial-process measurement, control and
automation" was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as
EN 62264-5:2012.
The following dates are fixed:
(dop) 2012-11-03
• latest date by which the document has
to be implemented at national level by
publication of an identical national
standard or by endorsement
(dow) 2015-02-03
• latest date by which the national
standards conflicting with the
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent
rights.
Endorsement notice
The text of the International Standard IEC 62264-5:2011 was approved by CENELEC as a European
Standard without any modification.
---------------------- Page: 4 ----------------------
SIST EN 62264-5:2012
- 3 - EN 62264-5:2012
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies
NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year
IEC 62264-1 - Enterprise-control system integration - EN 62264-1 -
Part 1: Models and terminology
IEC 62264-2 - Enterprise-control system integration - EN 62264-2 -
Part 2: Object model attributes
IEC 62264-3 - Enterprise-control system integration - EN 62264-3 -
Part 3 Activity models of manufacturing
operations management
---------------------- Page: 5 ----------------------
SIST EN 62264-5:2012
---------------------- Page: 6 ----------------------
SIST EN 62264-5:2012
IEC 62264-5
®
Edition 1.0 2011-02
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Enterprise-control system integration –
Part 5: Business to manufacturing transactions
Intégration du système de commande d’entreprise –
Partie 5: Transactions entre systèmes de gestion de commande d’entreprise et
systèmes de fabrication
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX XE
ICS 25.040.99; 35.100; 35.200 ISBN 978-2-88912-378-0
® Registered trademark of the International Electrotechnical Commission
Marque déposée de la Commission Electrotechnique Internationale
---------------------- Page: 7 ----------------------
SIST EN 62264-5:2012
– 2 – 62264-5 IEC:2011
CONTENTS
FOREWORD . 7
INTRODUCTION . 9
1 Scope . 10
2 Normative references . 10
3 Terms, definitions and abbreviations . 10
3.1 Terms and definitions . 10
3.2 Abbreviations . 11
4 Transaction messages and verbs . 11
4.1 General . 11
4.2 Transaction models . 12
4.3 Message structure . 13
4.3.1 General structure . 13
4.3.2 Application identification area . 14
4.3.3 Data area . 14
4.3.4 Message nouns . 14
4.3.5 Wildcard . 15
5 Message verbs . 16
5.1 Verbs and transaction models . 16
5.2 GET verb . 18
5.3 SHOW verb . 19
5.4 PROCESS verb . 20
5.5 ACKNOWLEDGE verb . 20
5.6 CHANGE verb . 22
5.7 CANCEL verb . 22
5.8 CONFIRM verb . 23
5.9 RESPOND verb . 24
5.10 SYNC verb . 24
5.11 SYNC ADD verb . 25
5.12 SYNC CHANGE verb . 25
5.13 SYNC DELETE verb . 25
6 Message nouns . 26
6.1 General . 26
6.2 Defined message contents . 26
6.2.1 Transaction service profile . 26
6.2.2 Personnel class . 26
6.2.3 Person . 26
6.2.4 Qualification test specification . 26
6.2.5 Equipment class . 27
6.2.6 Equipment . 27
6.2.7 Equipment capability test specification . 27
6.2.8 Maintenance request . 27
6.2.9 Maintenance work order . 27
6.2.10 Maintenance response. 27
6.2.11 Material class . 27
6.2.12 Material definition . 27
6.2.13 Material lot . 27
---------------------- Page: 8 ----------------------
SIST EN 62264-5:2012
62264-5 IEC:2011 – 3 –
6.2.14 Material sublot . 28
6.2.15 QA test Specification . 28
6.2.16 Process segment . 28
6.2.17 Production capability . 28
6.2.18 Product definition . 28
6.2.19 Production schedule . 29
6.2.20 Production performance . 29
6.3 Personnel model . 30
6.3.1 Personnel model elements . 30
6.3.2 Personnel class verbs . 30
6.3.3 Personnel class verb actions . 30
6.3.4 Person verbs . 33
6.3.5 Person verb actions . 33
6.3.6 Qualification test specification verbs . 36
6.3.7 Qualification test specification verb actions . 36
6.4 Equipment model . 38
6.4.1 Equipment model elements . 38
6.4.2 Equipment class verbs . 38
6.4.3 Equipment class verb actions . 38
6.4.4 Equipment verbs . 41
6.4.5 Equipment verb actions . 41
6.4.6 Equipment capability test specification verbs . 44
6.4.7 Equipment capability test specification test verb actions . 44
6.5 Maintenance model . 46
6.5.1 Maintenance model elements . 46
6.5.2 Maintenance request verbs . 46
6.5.3 Maintenance request verb actions . 46
6.5.4 Maintenance response verbs . 47
6.5.5 Maintenance response verb actions . 48
6.5.6 Maintenance work order verbs . 48
6.5.7 Maintenance work order verb actions . 49
6.6 Material model. 50
6.6.1 Material model elements . 50
6.6.2 Material class verbs . 50
6.6.3 Material class verb actions . 50
6.6.4 Material definition verbs . 53
6.6.5 Material definition verb actions . 53
6.6.6 Material lot verbs . 56
6.6.7 Material lot verb actions . 56
6.6.8 Material sublot verbs . 59
6.6.9 Material sublot verb actions . 59
6.6.10 QA test specification verbs . 62
6.6.11 QA test specification verb actions . 62
6.7 Process segment model . 64
6.7.1 Process segment model elements . 64
6.7.2 Process segment verbs . 64
6.7.3 Process segment verb actions . 64
6.8 Production capability model . 66
6.8.1 Production capability model elements . 66
---------------------- Page: 9 ----------------------
SIST EN 62264-5:2012
– 4 – 62264-5 IEC:2011
6.8.2 Production capability verbs . 66
6.8.3 Production capability verb actions . 66
6.9 Product definition model . 70
6.9.1 Production definition model elements . 70
6.9.2 Product definition verbs . 70
6.9.3 Product definition verb actions . 70
6.10 Production schedule model . 71
6.10.1 Production schedule model element . 71
6.10.2 Production schedule verbs . 72
6.10.3 Production schedule verb actions . 72
6.11 Production performance model . 75
6.11.1 Production performance model elements . 75
6.11.2 Production performance verbs . 76
6.11.3 Production performance verb actions . 76
6.12 Transaction Profile . 78
7 Completeness, compliance and conformance . 80
7.1 Completeness . 80
7.2 Compliance . 80
7.3 Conformance . 80
Annex A (informative) Transaction models and business scenario examples . 83
Annex B (informative) Questions on the use of transactions . 94
Annex C (informative) Patterns for Verbs . 97
Annex D (informative) General rules for identifying nouns from object models . 102
Bibliography . 105
Figure 1 – Typical exchanged messages in a transaction . 13
Figure 2 – Typical exchanged data set . 13
Figure 3 – Typical layout of an application identification area. 14
Figure 4 – GET with wildcard and SHOW response . 15
Figure 5 – GET and SHOW transaction . 19
Figure 6 – GET and SHOW transaction with a CONFIRM always . 20
Figure 7 – PROCESS/ACKNOWLEDGE transaction . 21
Figure 8 – Example of ACKNOWLEDGE to a process message . 21
Figure 9 – CHANGE/RESPOND transaction . 22
Figure 10 – CANCEL message . 22
Figure 11 – Example of a GET message with Confirm OnError . 23
Figure 12 – Confirm Message . 24
Figure 13 – SYNC ADD transaction with confirmation . 25
Figure 14 – SYNC DELETE transaction with no confirmation . 26
Figure 15 – Object grouping for the personnel model . 30
Figure 16 – Object grouping for the equipment model . 38
Figure 17 – Object grouping for the maintenance model . 46
Figure 18 – Object grouping for the material model . 50
Figure 19 – Object grouping for the process segment model . 64
Figure 20 – Object grouping for the production capability model . 66
---------------------- Page: 10 ----------------------
SIST EN 62264-5:2012
62264-5 IEC:2011 – 5 –
Figure 21 – Object grouping for the product defintion model . 70
Figure 22 – Object grouping for the production schedule model . 72
Figure 23 – Object grouping for the production performance model. 75
Figure 24 – Transaction profile model . 78
Figure A.1 – Coordination of planning and operations processes . 83
Figure A.2 – Push model – Production schedule and production performance . 84
Figure A.3 – Pull model – Production schedule and production performance . 85
Figure A.4 – Publish model – Production schedule and production performance . 85
Figure A.5 – Push model – Production schedule changes . 86
Figure A.6 – Publish model – Production schedule changes. 86
Figure A.7 – Push model – Production schedule cancelled . 87
Figure A.8 – Push and pull model – Schedule cancelled . 87
Figure A.9 – Push model – Daily production performance . 88
Figure A.10 – Pull model – Daily production performance . 88
Figure A.11 – Publish model – Daily production schedule . 89
Figure A.12 – Pull and push model – Production capability and production schedule . 89
Figure A.13 – Publish and push model – Production capability and production schedule . 90
Figure A.14 – Push and pull model – Schedule changes . 91
Figure A.15 – Publish model – Schedule changes after capability changes . 91
Figure A.16 – Push model – Material lot added, material lot quantity changed . 92
Figure A.17 – Publish and push model – Material quantity changes . 92
Figure A.18 – Push and pull model – Material quantity changes . 93
Figure D.1 – Object model with composite relationships . 103
Figure D.2 – Object model with non composite relationships . 104
Figure D.3 – Example of multiple composite objects . 104
Table 1 – Defined verbs . 17
Table 2 – Acknowledge request options . 20
Table 3 – Acknowledge element . 21
Table 4 – Respond options . 22
Table 5 – Confirmation request options . 23
Table 6 – Respond element . 24
Table 7 – Personnel class verb actions . 31
Table 8 – Person verb actions . 34
Table 9 – Qualification test specification verb actions . 37
Table 10 – Equipment class verb actions . 39
Table 11 – Equipment verb actions . 42
Table 12 – Equipment capability test specification verb actions . 45
Table 13 – Maintenance request verb actions . 47
Table 14 – Maintenance response verb actions. 48
Table 15 – Maintenance work order verb actions . 49
Table 16 – Material Class verb actions . 51
Table 17 – Material definition verb actions . 54
---------------------- Page: 11 ----------------------
SIST EN 62264-5:2012
– 6 – 62264-5 IEC:2011
Table 18 – Material lot verb actions . 57
Table 19 – Material sublot verb actions . 60
Table 20 – QA test verb actions . 63
Table 21 – Process segment verb actions . 65
Table 22 – Production Capability verb actions. 67
Table 23 – Production capability element definitions for GET and no ID messages . 69
Table 24 – Product definition verb actions . 71
Table 25 – Production schedule verb actions . 73
Table 26 – Production Schedule element definitions for GET and no ID messages . 75
Table 27 – Production Performance verb actions . 76
Table 28 – Production Performance definitions for GET and no ID messages . 78
Table 29 – Supported action attributes . 79
Table 30 – Transaction Profile verb actions . 80
Table 31 – Supported verb-noun actions . 81
Table 32 – Vendor conformance example . 82
Table C.1 – GET message with object ID is specified . 97
Table C.2 – GET message with wildcard in object ID . 98
Table C.3 – GET message with no object ID specified . 98
Table C.4 – PROCESS message with Object ID specified . 98
Table C.5 – PROCESS message with no object ID .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.