Abstract

Protocol conformance testing (TTCN) for mobile stations to be used for Direct Mode operation

Status
Published
Publication Date
30-Nov-2003
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Dec-2003
Due Date
01-Dec-2003
Completion Date
01-Dec-2003

Buy Documents

Standard

SIST ETS 300 394-4-7 E1:2003

English language (45 pages)
Preview
Preview
e-Library read for
×1 day

SIST ETS 300 394-4-7 E1:2003 is the Slovenian identical version of ETS 300 394-4-7 Edition 1 from ETSI. It specifies protocol conformance testing for Terrestrial Trunked Radio (TETRA) Direct Mode Operation (DMO) mobile stations connected to a GateWay (MS-GW), with a focus on the Test Suite Structure and Test Purposes (TSS&TP) for the air interface between them. In practice, it tells test labs and implementers what has to be exercised in a DMO MS-GW implementation and how those tests are organized.

What does SIST ETS 300 394-4-7 E1:2003 specify?

SIST ETS 300 394-4-7 E1:2003 specifies TSS&TPs and the related test structure for conformance testing of TETRA DMO products, specifically the MS-GW case. It is a protocol testing document, not a product design specification.

The scope states that the document supports approval tests for TETRA equipment and aims at a high probability of air interface interoperability between different manufacturers’ equipment. Security features are outside the scope.

The document is organized into these main clauses:

  • Clause 1 - Scope
  • Clause 2 - References
  • Clause 3 - Definitions and abbreviations
  • Clause 4 - Test Suite Structure (TSS)
  • Clause 5 - Introduction to Test Purposes (TPs)
  • Clause 6 - Test Purposes for DMCC protocols of a DMO MS-GW
  • Clause 7 - Test Purposes for the DMMM protocol of a DMO MS-GW
  • Clause 8 - Test Purposes for the MAC protocol of a DMO MS-GW
  • Annex A - Bibliography

Clause 4 separates the test material by layer and protocol, while Clauses 6 to 8 contain the actual test purposes.

What are the key requirements of SIST ETS 300 394-4-7 E1:2003?

SIST ETS 300 394-4-7 E1:2003 defines how an MS-GW implementation is tested: by protocol area, by state, and by test purpose type. The practical point is that a tester must first know which features the implementation claims, then select the applicable cases, preambles, and postambles.

Clause 4 - the test structure

Clause 4 splits the suite into Layer 3, also called the NWK layer, and Layer 2 MAC tests. For the MS connected to a gateway, Layer 3 covers Direct Mode Call Control (DMCC), Short Data Service (SDS), and Direct Mode Mobility Management (DMMM); Layer 2 covers MAC. This matters because a product can be conformant in one area and still fail in another.

Clause 4 also divides tests into Capability (CA), Valid Behaviour (BV), and Timer (TI) groups. CA checks claimed features, BV checks correct responses to valid protocol events, and TI checks expiry and counter mismatch handling. In practice, this tells a lab whether it is proving supported features, normal exchanges, or timeout behaviour.

Clause 5 - how each test purpose is written

Clause 5 says each TP includes a TP name, reference, purpose, description, pass criteria, selection, preamble, and postamble. The selection field is tied to PICS statements, so the test set follows the implementation’s claimed options. For an engineer or buyer, that means the conformance plan is not generic - it is tailored to the supported feature set.

Clause 5 also defines preambles and postambles using MSCs. The preambles bring the IUT from idle into states such as TX occupation, RX occupation, or RX reservation; the postambles return the IUT to idle. That is important because many protocol tests depend on the starting state being controlled and repeatable.

Clause 6 - DMCC tests

Clause 6 covers DMCC Circuit Mode and SDS tests for an MS-GW. The CM cases check call set-up, release, incoming calls, presence check, pre-emption, changeover, and reactions to unacceptable quality of service. The timer cases exercise DT301, DT302, DT311, DT308, and DT309. In practice, these tests show whether the MS-GW handles normal call control and recovery events in the same way a network expects.

The SDS cases cover acknowledged and unacknowledged service, including operation with and without FCS, pre-emption when the channel is busy, changeover, and the DT316 retry timer. This matters for short data traffic because the implementation has to either confirm delivery or retry according to the selected mode.

Clause 7 - DMMM tests

Clause 7 covers Direct Mode Mobility Management. It includes registration by invitation, uninvited registration, and registration cancellation. For implementers, this is the part that proves the MS can join, register, and cancel registration on the DMO side of the MS-GW interface.

Clause 8 - MAC tests

Clause 8 covers the MAC protocol for an MS-GW. The tests check fill bit addition and deletion, channel usage behaviour, the transmission of occupied indications, retransmission based on the frame count down element, fragmentation and reconstruction, addressing in DMAC-SYNC, random access abandonment, and the pre-emption timer DT211. In practice, these tests verify that the lower layer carries the right control information on the air interface, not just the higher-layer call and data messages.

What terms does SIST ETS 300 394-4-7 E1:2003 define?

SIST ETS 300 394-4-7 E1:2003 uses the following key terms and abbreviations.

  • Implementation Under Test (IUT) - the device or implementation being tested.
  • Protocol Implementation Conformance Statement (PICS) - the statement of supported protocol options used to select test cases.
  • Protocol Implementation eXtra Information for Testing (PIXIT) - extra implementation information needed to run the tests.
  • Test Suite Structure (TSS) - the organization of the test groups and subgroups.
  • Test Purpose (TP) - the individual objective of a test case.
  • Direct Mode Call Control (DMCC) - the Layer 3 control part for direct mode calls.
  • Short Data Service (SDS) - the direct mode short data service tested in Clause 6.
  • Medium Access Control (MAC) - the Layer 2 control function tested in Clause 8.

Who uses SIST ETS 300 394-4-7 E1:2003?

SIST ETS 300 394-4-7 E1:2003 is used by TETRA equipment manufacturers, conformance test laboratories, and approval or certification teams. It is also relevant to quality managers and technical buyers who need evidence that an MS-GW implementation has been tested against the correct protocol cases.

Engineers use it to map supported features to test purposes, prepare PICS/PIXIT data, and build Abstract Test Suites (ATSs) or TTCN-based test cases. Testers use it to decide preambles, postambles, and expected messages for call control, mobility management, SDS, and MAC verification.

What changed in SIST ETS 300 394-4-7 E1:2003 from the previous edition?

SIST ETS 300 394-4-7 E1:2003 is identical to ETS 300 394-4-7 Edition 1.

Which standards are used with SIST ETS 300 394-4-7 E1:2003?

SIST ETS 300 394-4-7 E1:2003 uses several companion documents to define the test basis and selection rules.

  • ETS 300 396-5 - gives the technical requirements for DMO Gateways and is the main reference for the protocol requirements tested here.
  • ETS 300 396-8-3 - provides the PICS proforma for the Gateway Air Interface, which the test selection uses.
  • ETS 300 394-4-1 - provides the MS-MS TSS&TP source that some SDS and MAC test purposes are derived from or compared with.
  • ISO/IEC 9646-1 - supplies the general conformance testing concepts and terminology.
  • ISO/IEC 9646-2 - supplies the Abstract Test Suite specification framework.
  • ETS 300 406 - gives the ETSI conformance testing methodology used as a base for the test approach.

What does the SIST ETS 300 394-4-7 E1:2003 document contain?

The document contains structured test purposes, not just narrative requirements. It includes MSC-based preambles and postambles, state-oriented test groups, and detailed TP tables with purpose, pass criteria, and selection conditions.

It also contains the naming convention for test purposes and the breakdown of Layer 3 and Layer 2 test groups. The worked test material covers call set-up and release, pre-emption, changeover, SDS, registration, fragmentation, reconstruction, and timer handling.

Annex A is a bibliography with related TETRA and conformance testing references.

Buy Documents

Standard

SIST ETS 300 394-4-7 E1:2003

English language (45 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

ANCE

Mexican certification and testing association.

EMA Mexico Verified

Intertek Slovenia

Intertek testing, inspection, and certification services in Slovenia.

UKAS Slovenia Verified

LNE (Laboratoire National de Métrologie et d'Essais)

French national laboratory for metrology and testing.

COFRAC France Verified

Sponsored listings

Frequently Asked Questions

SIST ETS 300 394-4-7 E1:2003 is a standard published by the Slovenian Institute for Standardization (SIST). Its full title is "Terrestrial Trunked Radio (TETRA); Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 7: Test Suite Structure and Test Purposes (TSS&TP) for Mobile Station to GateWay (MS-GW) Air Interface (AI)". This standard covers: Protocol conformance testing (TTCN) for mobile stations to be used for Direct Mode operation

Protocol conformance testing (TTCN) for mobile stations to be used for Direct Mode operation

SIST ETS 300 394-4-7 E1:2003 is classified under the following ICS (International Classification for Standards) categories: 33.070.10 - Terrestrial Trunked Radio (TETRA). The ICS classification helps identify the subject area and facilitates finding related standards.

SIST ETS 300 394-4-7 E1:2003 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • 1 Scope
  • 2 References
  • 3 Definitions and abbreviations
  • 3.1 TETRA definitions
  • 3.2 TETRA abbreviations
  • 3.3 ISO 9646 definitions
  • 3.4 ISO 9646 abbreviations
  • 4 Test Suite Structure (TSS)
  • 4.1 NWK layer or Layer 3 test groups
  • 4.2 Layer 2 test groups
  • 4.3 Test group description
  • 5 Introduction to Test Purposes (TPs)
  • 5.1 Test purpose definition conventions
  • 5.2 Test purpose naming conventions
  • 6 Test Purposes for the DMCC protocols of a DMO MS-GW
  • 6.1 DMCC Circuit Mode (CM) tests
  • 6.2 DMCC Short data service (SDS)
  • 7 Test Purposes for the DMMM protocol of a DMO MS-GW
  • 8 Test Purposes for the MAC protocol of a DMO MS-GW
  • 8.1 MS-GW MAC capability tests
  • 8.2 MS-GW MAC valid behaviour tests
  • 8.3 MS-GW MAC timer tests
  • Annex A (informative): Bibliography

1 Scope

This ETS contains the test specifications: Test Suite Structure and Test Purposes (TSS&TPs) and the Abstract Test Suites (ATSs) to test conformity of products to the TETRA Direct Mode Operation (DMO) protocols. This ETS is divided into several parts, each one dealing with one TSS&TP or one ATS for the test of a layer 2 or layer 3 protocol for DMO.

This present sub-part 7 deals with TSS&TP for a Mobile Station (MS) connected to a Gateway (MS-GW). NOTE: Sub-part 8 deals with TSS&TP for the other part of the DMO Gateway, which is a GateWay (GW) connecting the MS-GW to the Switching and Management Infrastructure (SwMI) of a Voice plus Data (V+D) system.

Testing of security features is outside the scope of this ETS. The objective of this test specification is to provide a basis for approval tests for TETRA equipment giving a high probability of air interface inter-operability between different manufacturer's TETRA equipment. The ISO standard for the methodology of conformance testing, ISO/IEC 9646-1 [5] and ISO/IEC 9646-2 [6], as well as the ETSI methodology for conformance testing, ETS 300 406 [7], are used as the basis for the test methodology.

2 References

This ETS incorporates by dated and undated reference, provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this ETS only when incorporated in it by amendment or revision. For undated references the latest edition of the publication referred to applies.

[1] Void.

[2] ETS 300 396-5: "Terrestrial Trunked RAdio (TETRA); Technical requirements for Direct Mode Operation (DMO); Part 5: Gateways".

[3] ETS 300 396-8-3: "Terrestrial Trunked RAdio (TETRA); Direct Mode Operation (DMO); Part 8: Protocol Implementation Conformance Statement (PICS) proforma specification; Sub-part 3: Gateway Air Interface (AI)". [4] ETS 300 394-4-1: "Terrestrial Trunked Radio (TETRA);Conformance testing specification; Part 4: Protocol testing specification for Direct Mode Operation (DMO); Sub-part 1: Test Suite Structure and Test Purposes (TSS&TP) for Mobile Station to Mobile Station (MS-MS) Air Interface (AI)".

[5] ISO/IEC 9646-1 (1994): "Information technology; Open Systems Interconnection; Conformance testing methodology and framework; Part 1:

General concepts". (See also ITU-T Recommendation X.290 (1991)). [6] ISO/IEC 9646-2 (1994): "Information technology; Open Systems Interconnection; Conformance testing methodology and framework; Part 2: Abstract Test Suite specification". (See also ITU-T Recommendation X.291 (1991)).

[7] ETS 300 406 (1995): "Methods for Testing and Specification (MTS); Protocol and profile conformance testing specifications; Standardization methodology".

SIST ETS 300 394-4-7 E1:2003 Page 8 ETS 300 394-4-7: June 1999

3 Definitions and abbreviations

3.1 TETRA definitions

For the purposes of this ETS, the definitions given in ETS 300 396-5 [2] apply.

3.2 TETRA abbreviations

For the purposes of this ETS the following TETRA abbreviations apply:

CM Circuit Mode DMCC Direct Mode Call Control DMMM Direct Mode Mobility Management DMO Direct Mode of Operation FCS Frame Check Sequence GW Gateway MAC Medium Access Control MNI Mobile Network Identity MS Mobile Station NWK Network. Layer 3 of the TETRA protocol stack SDS Short Data Services SDU Service Data Unit TX Transmit RX Receive

3.3 ISO 9646 definitions

For the purposes of this ETS the following ISO/IEC 9646-1 [5] definitions apply:

Implementation Conformance Statement (ICS) Implementation Under Test (IUT) Implementation eXtra Information for Testing (IXIT) Protocol Implementation Conformance Statement (PICS) Protocol Implementation eXtra Information for Testing (PIXIT)

3.4 ISO 9646 abbreviations

For the purposes of this ETS the following ISO/IEC 9646-1 [5] abbreviations apply:

IUT Implementation Under Test PDU Protocol Data Unit PICS Protocol Implementation Conformance Statement PIXIT Protocol Implementation eXtra Information for Testing TP Test Purpose TSS Test Suite Structure

4 Test Suite Structure (TSS)

This TSS contains several components, some are specific of the gateway functionality and are new, while others are derived or form a subset of other TETRA specifications. TPs are either included in this ETS, or are referenced from another document.

Here is the list of the TSS components for the part dealing with an MS connected to a GateWay (DMO MS-GW):

at layer 3 also named NWK layer:

Direct Mode Call Control (DMCC):

Circuit Mode (CM): new component; Short Data Service (SDS): derived from DMO MS-MS TPs in ETS 300 394-4-1 [4]. Direct Mode Mobility Management (DMMM): new component.

at layer 2:

MAC layer: derived from DMO MS-MS TPs in ETS 300 394-4-1 [4].

SIST ETS 300 394-4-7 E1:2003 Page 9 ETS 300 394-4-7: June 1999

4.1 NWK layer or Layer 3 test groups

The first level separates the NWK layer (or layer 3) in different protocols (Circuit mode, Short Data Service). Next level splits protocol testing into functional test groups according to the type of testing:

Capability test (CA), Valid Behaviour (BV) and Timer tests (TI). Further level classifies the possible operations in each protocol condition or state.

The following list defines the NWK layer test group names and identifiers used for those:

MS connected to a gateway GW (DMO_MSGW_NWK):

Direct Mode Call Control (DMCC):

Circuit mode (CM):

Capability tests (CA); Valid Behaviour tests (BV):

from Idle state(ID); from Idle state, channel busy (IB); from TX occupation State (TXO); from RX occupation State (RO); from TX Reservation (TR); from RX Reservation State (RR).

Timer Tests (TI).

Short Data Service (SDS):

Capability tests (CA); Valid Behaviour tests (BV):

from Idle state(ID); from Idle state, channel busy (IB); from RX Occupation State (RO); from TX Reservation State (TR); from RX Reservation State (RR).

Timer Tests (TI).

Direct Mode Mobility Management (DMMM).

4.2 Layer 2 test groups

The first level of the Layer 2 test groups separates the test suite in functional test groups: CA, BV and TI. The second level of the test subgroups is used to form a division of protocol requirements. In the case of an MS connected to a gateway, layer 2 contains the MAC only and is structured as follows:

MS connected to a gateway MAC layer (DMO_DMO_MSGW_MAC):

Capability tests (CA); Valid behaviour tests (BV):

Channel usage (CU); Signalling messages (SM); Traffic mode (TM).

Timer tests (TI).

4.3 Test group description

Capability (CA) tests provide limited testing that the observable capabilities of the IUT are in accordance with the conformance requirements and the additional capabilities claimed in the PICS/PIXIT. The Valid Behaviour (BV) group tests an IUT in response to valid behaviour of the test system. "Valid" means that a test event is syntactically and contextually correct. All test cases in the valid behaviour group are intended to verify as thoroughly as possible the various functions of the protocol. Different timers are defined to supervise the various state transitions. The Timer (TI) test group is intended to verify that the IUT is reacting properly to an expiry of one of the timers or to a counter mismatch.

SIST ETS 300 394-4-7 E1:2003 Page 10 ETS 300 394-4-7: June 1999

5 Introduction to Test Purposes (TPs)

The test purposes for each test suite are defined in clause 6 of this ETS for NWK layer and MAC layer.

5.1 Test purpose definition conventions

5.1.1 Text and MSCs

Each TP is described in a table that contains the following information:

Table 0 TP-Name Reference: reference to the paragraph number of The TP name is a unique identifier, specification ETS 300 396-5 [2] stating this conformance specified according to the TP naming requirement.

conventions defined in the subclause For example: ETS 300 396-5 [2], 6.2.5.1 below. (it is also the name of the corresponding test case) Purpose purpose of the test itself, indicating for example the test performed against a requirement of the protocol, described by this test purpose.

Example: test of changeover initiated from RX reservation state. Test description body of the test Pass criteria visible action to be observed at PCO to declare that the IUT passes the test and conforms to the specifications Selection expression based on ETS 300 396-8-3 [3] PICS statements, used to select or deselect the corresponding test case according to the options of the implementation.

Preamble "None" or name of the preamble procedure bringing the IUT from idle state to the state required to run the test.

For example: idle_to_RX_reservation.

"None" or name of the postamble to bring the IUT back to idle state, Postamble for example: RX_occupation_to_idle.

The preambles and postambles are described using MSCs and are shown in the following paragraphs.

5.1.2 Preamble descriptions

Preambles are used to bring the IUT from the idle state to the state where the test takes place. As the protocol has different options, as for instance the use of presence check or the absence of presence check, there are several ways to reach a given state. The preamble has to be chosen according to the IUT capabilities and the implemented options.

SIST ETS 300 394-4-7 E1:2003 Page 11 ETS 300 394-4-7: June 1999

5.1.2.1 Preamble registration

Without registration invitation MSC Registration_uninvited_supp IUT Tester

NOT PREAMBLE:

REGISTERED Bring the IUT from Not Registered state to Registration Accepted state when un−invited registration is supported < IMP!DM_REGISTER_REQUEST>

DM_GREGISTER_REQUEST DM_GREGISTER ACCEPT REGISTRATION ACCEPTED

SIST ETS 300 394-4-7 E1:2003 Page 12 ETS 300 394-4-7: June 1999 With registration invitation MSC Registration_invited_supp IUT Tester

NOT PREAMBLE:

REGISTERED Bring the IUT from Not Registered state to Registration Accepted state when invited registration is supported

DPRES_SYNC layer 2 PDU − registration invited DM_GREGISTER_REQUEST DM_GREGISTER ACCEPT REGISTRATION ACCEPTED

SIST ETS 300 394-4-7 E1:2003 Page 13 ETS 300 394-4-7: June 1999

5.1.2.2 Preamble idle_to_TX_occupation: From Idle state to Call Active TX Occupation

Without presence check MSC Idle_to_TX_OCCUPATION_npc IUT Tester

Registration PREAMBLE:

preamble Bring the IUT from IDLE state to TX_OCCUPATION state

IDLE <IMP!DM_GSETUP> DM_GSETUP DM_GACK DM_GCONNECT DM_SETUP TX_OCCUPATION

SIST ETS 300 394-4-7 E1:2003 Page 14 ETS 300 394-4-7: June 1999

5.1.2.3 Preamble idle_to_RX_occupation: From Idle state to Call Active RX Occupation

With presence check MSC Idle_to_RX_RESERVATION_wpc IUT Tester

PREAMBLE: idle_to_RX_occupation Bring the IUT from IDLE state to RX_RESERVATION state when set−up with presence check is supported

RX_OCCUPATION DM_TX_CEASED RX_RESERVATION

SIST ETS 300 394-4-7 E1:2003 Page 15 ETS 300 394-4-7: June 1999 Without presence check MSC Idle_to_RX_OCCUPATION_npc IUT Tester

PREAMBLE:

IDLE Bring the IUT from IDLE state to RX_OCCUPATION state when set−up without presence check is supported DM_SETUP

RX_OCCUPATION

SIST ETS 300 394-4-7 E1:2003 Page 16 ETS 300 394-4-7: June 1999

5.1.2.4 Preamble idle_to_RX_reservation

By passing through RX occupation state MSC Idle_to_RX_RESERVATION_wpc IUT Tester

PREAMBLE: idle_to_RX_occupation Bring the IUT from IDLE state to RX_RESERVATION state when set−up with presence check is supported

RX_OCCUPATION DM_TX_CEASED RX_RESERVATION

SIST ETS 300 394-4-7 E1:2003 Page 17 ETS 300 394-4-7: June 1999 By passing through TX occupation state MSC Idle_to_RX_RESERVATION_TX IUT Tester

idle_to_TX_occupation PREAMBLE:

Bring the IUT from IDLE state to RX_RESERVATION state when set−up supported

TX_OCCUPATION < IMP!DM_TX_CEASED> DM_TX_CEASED RX_RESERVATION

SIST ETS 300 394-4-7 E1:2003 Page 18 ETS 300 394-4-7: June 1999

5.1.2.5 Preamble idle_channel_occupation

Without presence check MSC Idle_channel_occupation_wpc MS’ Tester IUT

PREAMBLE:

Set up the channel to be occupied with the tester as the master of IDLE the channel while the IUT is still in state IDLE.

DM_SETUP_PRES DM_CONNECT DM_CONNECT_ACK

Channel occupied

SIST ETS 300 394-4-7 E1:2003 Page 19 ETS 300 394-4-7: June 1999 With presence check MSC Idle_channel_occupation_npc IUT Tester MS’ IDLE

PREAMBLE:

Set up the channel to be occupied with the tester as the master of the channel while the IUT is still in state IDLE.

DM_SETUP

Channel occupied

5.1.3 Layer 3 postamble descriptions

Postambles are used to bring the IUT from the state ending the test, to the idle state.

SIST ETS 300 394-4-7 E1:2003 Page 20 ETS 300 394-4-7: June 1999

5.1.3.1 Postamble TX_occupation_to_idle: From Call Active TX Occupation state to Idle

MSC From_TX_OCCUPATION_to_IDLE IUT Tester TX OCCUPATION

POSTAMBLE:

Bring the IUT from <IMP!DMCC RELEASE> TX OCCUPATION state to IDLE state caused by a DMCC_RELEASE

DM_RELEASE IDLE

5.1.3.2 Postamble RX_occupation_to_idle: From Call Active RX Occupation state to Idle

MSC From_RX_OCCUPATION_to_IDLE IUT Tester RX OCCUPATION

POSTAMBLE:

Bring the IUT from <IMP!DMCC_RELEASE> RX OCCUPATION state to IDLE state

IDLE

SIST ETS 300 394-4-7 E1:2003 Page 21 ETS 300 394-4-7: June 1999

5.1.3.3 Postamble RX_reservation_to_idle: From Call Active RX Reserved state to Idle

MSC From_RX_RESERVED_to_IDLE IUT Tester RX RESERVED

POSTAMBLE:

Bring the IUT from <IMP!DMCC_RELEASE_request> RX RESERVED state to IDLE state

IDLE

5.2 Test purpose naming conventions

The identifier of the test purpose is built according to table 1:

Table 1: Test purpose naming convention DMO/<ts>/<fm>/<ss>/<tt>/<uu>/<nn> <ts> = test suite type MSMS MS to MS (see ETS 300 394-4-1 [4]) MSGW MS connected to a gateway GATE Gateway REPx Repeater type x (see ETS 300 394-4-4 [4]) <fm> = functional entity in a layer DMCC Direct Mode Call Control (layer 3) MAC Upper MAC (layer 2) <ss> = test group letters such as: abbreviation of the group name (optional) CM Circuit Mode (layer 3) SDS Short Data Service (layer 3) tt = Type of testing CA Capability Tests BV Valid Behaviour Tests BI Invalid Behaviour Tests TI Timer expiry and counter mismatch tests <uu> = test subgroup letters abbreviation of the subgroup name (optional) <nn> = sequential number 01-99 Test Purpose Number

SIST ETS 300 394-4-7 E1:2003 Page 22 ETS 300 394-4-7: June 1999

6 Test Purposes for the DMCC protocols of a DMO MS-GW

In this clause, the IUT is an MS connected to a gateway. The tester is a gateway. The interface between the MS and the gateway is being tested.

6.1 DMCC Circuit Mode (CM) tests

Test group objective: To test the behaviour of the DMCC CM entity of the IUT. Condition: IUT implements the CM.

6.1.1 MS-GW CM capability tests

To test the basic capabilities of the CM module of the IUT, when operating in group address mode (without presence check) or in individual address mode (with or without presence check). DMO_MSGW_DMCC_CM_CA_01 Reference: ETS 300 396-5 [2], 6.2.1.1, 6.2.4.1 Purpose Set-up and release a group call.

The tester issues an implicit send to cause the IUT to initiate a group call. Test description Pass criteria 1 The IUT sends DM-GSETUP to the tester.

Test description The tester sends back a DM-GACK followed by DM-GCONNECT. The IUT sends DM-SETUP PDU to the tester.

Pass criteria 2 Test description The tester issues an implicit send to cause the IUT to initiate a call release. The IUT sends DM-RELEASE PDU to the tester.

Pass criteria 3 Selection A.7/1 Initiate call set-up on group address.

ETS 300 396-8-3 [3] Preamble None.

Postamble None.

DMO_MSGW_DMCC_CM_CA_02 Reference: ETS 300 396-5 [2], 6.2.1.1, 6.2.4.1 Establish and terminate an individual call Purpose Test description The tester issues an implicit send to cause the IUT to initiate an individual call.

The IUT sends DM-GSETUP to the tester.

Pass criteria 1 Test description The tester sends back a DM-GACK followed by DM-GCONNECT. Pass criteria 2 The IUT sends DM-SETUP PDU to the tester.

The tester issues an implicit send to cause the IUT to initiate a call release. Test description Pass criteria 3 The IUT sends DM-RELEASE PDU to the tester.

A.7/3 Initiate call set-up on individual address.

Selection ETS 300 396-8-3 [3] None.

Preamble Postamble None.

SIST ETS 300 394-4-7 E1:2003 Page 23 ETS 300 394-4-7: June 1999

6.1.2 MS-GW CM valid behaviour tests
6.1.2.1 The IUT is in IDLE state, DMO channel is free

DMO_MSGW_DMCC_CM_BV_ID_01 Reference: ETS 300 396-5 [2], 6.2.2.1 Receive an incoming group call without presence check.

Purpose Test description The tester sends DM-SETUP PDU to the IUT, which brings the IUT to CALL ACTIVE RX OCCUPATION state.

To check that IUT reaches CALL ACTIVE RX OCCUPATION state, the Pass criteria tester sends DM-TX CEASED which brings the IUT to CALL ACTIVE RX RESERVATION state. Then, during the reservation period, the tester issues an implicit send to cause the IUT to issue a call set-up. Verify that before attempting the call set-up, the IUT issues a DM-GTX REQUEST to initiate a changeover.

Selection A.8/1 Accept call without presence check.

ETS 300 396-8-3 [3] Preamble None.

Tester issues a DM-GREJECT followed by RX_Reservation_to_idle. Postamble DMO_MSGW_DMCC_CM_BV_ID_02 Reference: ETS 300 396-5 [2], 6.2.2.2 Purpose Receive an incoming individual call with presence check. Test description The tester sends DM-SETUP PRES to the IUT which sends back DM- CONNECT. The tester responds with DM-CONNECT ACK. This brings the IUT to CALL ACTIVE RX OCCUPATION state.

To check that IUT reaches CALL ACTIVE RX OCCUPATION state, the Pass criteria tester sends DM-TX CEASED which brings the IUT to "call active RX reservation" state. Then, during the reservation period, the tester issues an implicit send to cause the IUT to issue a call set-up. Verify that before attempting the call set-up, the IUT issues a DM-GTX REQUEST to initiate a changeover.

Selection A.8/2 Accept call with presence check.

ETS 300 396-8-3 [3] Preamble None.

Tester issues a DM-REJECT followed by RX_Reservation_to_idle.

Postamble DMO_MSGW_DMCC_CM_BV_ID_03 Reference: ETS 300 396-5 [2], 6.2.1.1 Purpose Release a call set-up attempt when the offered Quality of Service is not acceptable to the DMCC.

The tester issues an implicit send to cause the IUT to initiate a call set-up. Test description Then the IUT sends DM-GSETUP to the tester. The tester sends DM- GCONNECT to the IUT with an unacceptable QOS.

The QOS being not acceptable, the IUT sends DM-RELEASE to the tester Pass criteria and returns to idle.

Selection A.6/3 Initiate call set-up.

ETS 300 396-8-3 [3] Preamble None.

None.

Postamble

SIST ETS 300 394-4-7 E1:2003 Page 24 ETS 300 394-4-7: June 1999 DMO_MSGW_DMCC_CM_BV_ID_04 Reference: ETS 300 396-5 [2], 6.2.1.1, 8.5.7.2.1 Purpose Pre-emption flags in DM-SETUP and DM-TX-CEASED PDU.

The tester issues an implicit send to cause the IUT to initiate a call set-up. Test description The IUT initiates the call (DM-GSETUP PDU).

Pass criteria 1 after receiving DM-GCONNECT from tester, verify that IUT sends the DM- SETUP PDU with the pre-emption flag set to 1 and the timing flag set to 0. The tester issues an implicit send to cause the IUT to terminate the call. Test description Pass criteria 2 Verify that the IUT sends the DM-TX CEASED PDU with the request and changeover flags set to 0.

A.6/3 Initiate call set-up.

Selection ETS 300 396-8-3 [3] None.

Preamble Postamble RX_Reservation_to_idle.

DMO_MSGW_DMCC_CM_BV_ID_05 Reference: ETS 300 396-5 [2], 6.2.1.1 Purpose Error after DM-GSETUP.

The tester issues an implicit send to cause the IUT to initiate a call set-up. Test description The IUT sends the DM-GSETUP PDU. The tester answers with a DM- GACK PDU indicating ‘message not fully received’.

Verify that IUT sends again the DM-GSETUP PDU.

...