Sprayed concrete - Part 2: Execution

This European Standard is applicable to sprayed concrete to be used for ground strengthening, repair and upgrading of existing structures and for free-standing structures.
The standard specifies requirements for the execution of concrete spraying both by wet and dry process.
The standard is applicable to temporary as well as permanent structures.
This standard does not cover safety and health aspects of execution.
This standard does not state requirements for quality assurance and for qualification of personnel for the various activities.

Spritzbeton - Teil 2: Ausführung

Diese Europäische Norm gilt für Spritzbeton, der zur Bodensicherung, zur Instandsetzung und Verstärkung von bestehenden Tragwerken sowie für neue Tragwerke freistehende Konstruktionen verwendet wird.
Die Norm enthält Anforderungen an die Ausführung von Spritzbeton sowohl im Nassspritzverfahren als auch im Trockenspritzverfahren.
Die Norm gilt sowohl für temporäre als auch für permanente Tragwerke.
Die Norm berücksichtigt nicht Aspekte der Arbeitssicherheit bei der Ausführung.
Die Norm beinhaltet keine Anforderungen an die Qualitätssicherung und an die Qualifikation des Personals der verschiedenen Gewerke.

Béton projeté - Partie 2 : Exécution

La présente Norme européenne s’applique au béton projeté destiné au soutènement, à la réparation et au renforcement de structures existantes ainsi qu’à des structures indépendantes.
La présente Norme spécifie les exigences relatives à l’exécution de la projection du béton tant par voie sèche que par voie mouillée.
La présente Norme s’applique aux structures temporaires ou permanentes.
Elle ne traite pas des aspects de santé et de sécurité de l’exécution.
Elle ne comprend aucune prescription relative à l’assurance qualité ou à la qualification des personnels chargés des différentes activités.

Brizgan beton - 2. del: Izvedba

General Information

Status
Published
Publication Date
28-Feb-2007
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Mar-2007
Due Date
01-Mar-2007
Completion Date
01-Mar-2007

Buy Standard

Standard
EN 14487-2:2007
English language
16 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Sprayed concrete - Part 2: ExecutionBrizgan beton - 2. del: IzvedbaBéton projeté - Partie 2 : ExécutionSpritzbeton - Teil 2: AusführungTa slovenski standard je istoveten z:EN 14487-2:2006SIST EN 14487-2:2007en91.100.30Beton in betonski izdelkiConcrete and concrete productsICS:SLOVENSKI
STANDARDSIST EN 14487-2:200701-marec-2007







EUROPEAN STANDARDNORME EUROPÉENNEEUROPÄISCHE NORMEN 14487-2October 2006ICS 91.100.30 English VersionSprayed concrete - Part 2: ExecutionBéton projeté - Partie 2 : ExécutionSpritzbeton - Teil 2: AusführungThis European Standard was approved by CEN on 3 August 2006.CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this EuropeanStandard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such nationalstandards may be obtained on application to the Central Secretariat or to any CEN member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a CEN member into its own language and notified to the Central Secretariat has the same status as the officialversions.CEN members are the national standards bodies of Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France,Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania,Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMITÉ EUROPÉEN DE NORMALISATIONEUROPÄISCHES KOMITEE FÜR NORMUNGManagement Centre: rue de Stassart, 36
B-1050 Brussels© 2006 CENAll rights of exploitation in any form and by any means reservedworldwide for CEN national Members.Ref. No. EN 14487-2:2006: E



EN 14487-2:2006 (E) 2 Contents Foreword.3 1 Scope.4 2 Normative references.4 3 Terms and definitions.4 4 Documentation.4 4.1 Project specification.4 4.2 Execution documentation.5 5 Preparatory works.5 5.1 For strengthening of ground.5 5.1.1 Preparation of substrate.5 5.1.2 Removal of dust and debris.6 5.1.3 Pre-wetting.6 5.1.4 Protection against extreme ambient temperatures.6 5.2 For repair, upgrading and free-standing structures.6 5.2.1 Scaffolding, falsework and formwork.6 5.2.2 Preparation of substrate.6 5.2.3 Pre-wetting.6 5.2.4 Protection against extreme ambient temperature.6 6 Reinforcement.7 7 Equipment.7 7.1 Storage of materials.7 7.2 Batching equipment.7 7.3 Mixers.8 7.4 Spraying equipment.8 7.5 Testing equipment.8 8 Batching, mixing and delivery of concrete.8 8.1 Batching and mixing.8 8.2 Delivery.9 8.2.1 Dry mix process.9 8.2.2 Wet mix process.9 9 Execution of spraying.9 9.1 Spraying.9 9.2 Surface of finished concrete.10 9.3 Curing and protection.10 10 Geometrical tolerances.11 10.1 General.11 10.2 Thickness.11 11 Inspection.11 11.1 General.11 11.2 Scope for inspection of execution.11 11.3 Inspection actions related to the scope of inspection.13 Annex A (informative)
Guidance on documentation.15 Bibliography.16



EN 14487-2:2006 (E) 3 Foreword This document (EN 14487-2:2006) has been prepared by Technical Committee CEN/TC 104 “Concrete and related products”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by April 2007, and conflicting national standards shall be withdrawn at the latest by April 2007. According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.



EN 14487-2:2006 (E) 4 1 Scope This European Standard is applicable to sprayed concrete to be used for ground strengthening, repair and upgrading of existing structures and for free-standing structures. The standard specifies requirements for the execution of concrete spraying both by wet and dry process. The standard is applicable to temporary as well as permanent structures. This standard does not cover safety and health aspects of execution. This standard does not state requirements for quality assurance and for qualification of personnel for the various activities. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 206-1:2000, Concrete — Part 1. Specification, performance, production and conformity EN 1504-3, Products and systems for the protection and repair of concrete structures — Definitions, requirements, quality control and evaluation of conformity — Part 3: Structural and non-structural repair EN 1504-10, Products and systems for the protection and repair of concrete structures — definitions — requirements — quality control and evaluation of conformity — Part 10: Site application of products and systems and quality control of the works ENV 13670-1, Execution of concrete structures — Part 1: Common EN 14487-1:2005, Sprayed concrete — Part 1: Definitions, specifications and conformity EN 14488-6, Testing sprayed concrete — Part 6: Thickness of concrete on a substrate EN 14889-1, Fibres for concrete — Part 1: Steel fibres — Definitions, specifications and conformity EN 14889-2, Fibres for concrete — Part 2: Polymer fibres — Definitions, specifications and conformity 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 14487-1:2005 apply. 4 Documentation 4.1 Project specification The project specification shall include all necessary information and technical requirements for execution of the works. As a minimum the following shall be stated:  type of project (bridge, house, road, railway, hydro power, etc.),  purpose of concrete spraying (permanent or temporary support etc. for ground strengthening), (structural or non structural for repair),



EN 14487-2:2006 (E) 5  inspection category according to EN 14487-1,  requirements related to health and safety,  qualification of personnel,  requirements on quality assurance plan for execution if required, NOTE 1 Quality plan for execution is normally required for inspection classes 2 and 3.  relevant European Technical Approvals and provisions valid on the construction site, NOTE 2 Provisions valid at the construction site are national standards and documents approved by competent authority defined in the project specification.  procedures for making alterations to previously agreed requirements,  list of relevant design documents. for ground strengthening also:  general type of ground conditions (rock type and quality etc.),  main principles
applied for the sprayed concrete ground strengthening design,  any particular execution conditions (e.g. frozen substrate, spraying under compressed air, special waste deposits). for repair, upgrading and free-standing structures also:  requirements on surface finish,  requirements on thickness.
 main structural design principles and objectives NOTE 3 Informative Annex A contains a checklist of requirements and information that may have to be included in the project specification as appropriate. Before commencement of execution of any part of the works, the project specification relevant to that part of the works shall be complete and available. The project specification should also include statements on requirements for the distribution, the filing and recording of technical documents used for the works. 4.2 Execution documentation If required, a quality plan for the execution of the work shall be prepared including a complete listing of relevant references. References shall, where appropriate, be given to requirements and conformity criteria in EN 14487-1. The sprayed concrete execution shall be documented according to requirements put forward in this standard and the established QA plan. 5 Preparatory works 5.1 For strengthening of ground 5.1.1 Preparation of substrate All poor or loose rock shall be removed.



EN 14487-2:2006 (E) 6 Ground water leakages are to be collected in hoses, pipes or other drainage systems, to prevent detriment to the quality of the sprayed concrete. Any specified rock mechanics instrumentation shall be installed. 5.1.2 Removal of dust and debris Dust debris and other deposits shall be removed by pressurised water jetting prior to spraying. 5.1.3 Pre-wetting The need for additional pre-wetting prior to spraying shall be considered taking into account the suction of the substrate and the consequent risk of an adverse influence on the sprayed concrete. 5.1.4 Protection against extreme ambient temperatures When working in high or low temperatures, precautions shall be taken to ensure the quality of the sprayed concrete. If the ambient temperature is expected to be below 0 °C at the time of spraying or in the curing period, precautions shall be planned to protect the concrete against damage due to freezing. If the ambient temperature is forecast to be high at the time of spraying or in the curing period, precautions shall be planned to protect concrete against damaging effects. 5.2 For repair, upgrading and free-standing structures 5.2.1 Scaffolding, falsework and formwork
Scaffolding, falsework and formwork shall, generally, apply to ENV 13670-1. For scaffolding and falsework for sprayed concrete operations, the following additional clauses shall be considered:  it shall be strong enough to take all the loads including the produced rebound, without undue deformations,  it shall accommodate the safe working of the nozzleman,  it shall be placed such that a sufficient distance between nozzle and surface of application can be achieved (see 9.1),  it shall allow easy access to all parts of the members to be treated. Formwork for sprayed concrete operations shall be designed so as to avoid pockets of rebound. 5.2.2 Preparation of substrate It is essential that sprayed concrete is applied to a thoroughly clean, rough and defect-free surface. High pressure water jetting or grit blasting, capable of etching the substrate surface, are the recommended methods. For repair and upgrading, the preparation of concrete substrate and reinforcement shall conform to EN 1504-10. 5.2.3 Pre-wetting For repair and upgrading, pre-wetting of the substrate of the existing concrete (or other porous material) shall be considered according to EN 1504-10. 5.2.4 Protection against extreme ambient temperature Formwork or structural parts in contact with the section to be sprayed shall have a temperature which does not result in freezing of the sprayed concrete before it has sufficient strength to resist the effects of freezing.



EN 14487-2:2006 (E) 7 If the ambient temperature is expected to be below 0 °C at the time of spraying or during the curing period, precautions shall be taken to protect the concrete against damage due to freezing. If the ambient temperature is expected to be high at the time of spraying or during the curing period, precautions shall be taken to protect concrete against damaging effects. 6 Reinforcement Reinforcement steel may be mesh, reinforcement bars or fibres. For ground strengthening, lattice girders and steel ribs may be incorporated in the sprayed concrete, under separate materials specification. Reinforcement in terms of mesh or bars for sprayed concrete structures shall comply with ENV 13670-1. Steel or polymer fibres used for reinforcement shall comply with EN 14889-1 or EN 14889-2 respectively. Additionally:  reinforcement is to be fixed in such a way, that it will stay in place and not vibrate during the spraying process,  design and the arrangement of the rebars shall be adapted for the spraying process in order to minimize the shadow effect and improve compaction.  where two or more layers of mesh reinforcement are incorporated, the rear layer should be encased in sprayed concrete prior to fixing the next front layer (not applicable to necessary overlaps within a layer) which shall be fixed at a distance of at least 2 times the maximum aggregate size from the preceding sprayed concrete layer. Pressurised air used shall be freed from oil by using adequate equipment (e.g. oil traps). 7 Equipment 7.1 Storage of materials Constituent materials shall be stored and handled so that their properties do not change significantly, e.g. by action of climates, intermingling or contamination, and that their conformity with the respective standard is maintained. Storage compartments shall be clearly marked in order to avoid errors in the use of the constituent materials. Special instructions from the suppliers of the constituent materials shall be taken into account. Facilities shall be provided to enable samples to be taken from the stockpiles, silos and bins. 7.2
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.