kSIST FprEN IEC 60794-1-120:2026
(Main)Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Cable storage performance before installation, method E20
- Status
- Not Published
- Public Enquiry End Date
- 30-Sep-2025
- Technical Committee
- MOC - Mobile Communications
- Current Stage
- 5020 - Formal vote (FV) (Adopted Project)
- Start Date
- 15-Oct-2026
- Due Date
- 03-Dec-2026
- Completion Date
- 16-Oct-2026
kSIST FprEN IEC 60794-1-120:2026 is a SIST standard based on the International Electrotechnical Commission (IEC) document for optical fibre cables. It specifies Method E20 for checking cable storage performance before installation, with two mechanical test methods for armoured optical fibre cables used with telecommunication equipment and similar devices. It is written for manufacturers, users and test laboratories that need a common way to specify, perform and report this test.
What does kSIST FprEN IEC 60794-1-120:2026 specify?
kSIST FprEN IEC 60794-1-120:2026 specifies test procedures for cable storage performance before installation. The document is aimed at armoured optical fibre cables, including cables used in underwater or other special protection applications, and cables that combine optical fibres and electrical conductors.
The document is organized around a short technical structure:
- Clause 1 gives the scope.
- Clause 2 lists the normative references.
- Clause 3 points to the applicable terms and definitions.
- Clause 4 gives Method E20 and splits it into Method E20A and Method E20B.
- Two figures show the test set-ups for the circular coiling and “figure-8” piling methods.
| Part of the document | What it covers |
|---|---|
| 4.1-4.2 | Purpose of the test and the two test options |
| 4.3 | Method E20A, circular coiling |
| 4.4 | Method E20B, “figure-8” piling |
What are the key requirements of kSIST FprEN IEC 60794-1-120:2026?
kSIST FprEN IEC 60794-1-120:2026 defines how to prepare the sample, run the test, and judge the result. The practical goal is to show whether an armoured cable can be stored and laid out before installation without losing acceptable performance.
Method E20A - circular coiling
Method E20A is for underwater cables stored on ships. The sample must be long enough to make the agreed number of coils, taken from the production inner end, and coiled flat on a suitable surface at a temperature close to ambient ship-loading and laying conditions.
The cable is started at the manufacturer-specified diameter and direction, kept in place for more than 5 minutes, and should form a smooth circle that stays flat on the surface. In practice, this means the user and manufacturer must agree the coiling diameter, number of coils and temperature before testing.
Method E20B - “figure-8” piling
Method E20B is for armoured optical cables delivered on drums, where the “figure-8” shape helps avoid torsional stress during installation. The sample is unwound from the drum without cutting, laid on a flat surface, and kept in the pile for more than 5 minutes.
The minor dimension of the pile must be at least 1.5 m and at least the minimum cable bending diameter during installation, while the major dimension must be at least twice the minor dimension. The pile should remain flat and smooth, and the test uses attenuation measurements before and after the test according to IEC 60793-1-46.
Performance and reporting
For E20B, the document requires no change in attenuation for single-mode fibres at 1 550 nm after the test, unless otherwise agreed. Both methods also require the relevant specification to state the key test settings, and the report to record the agreed settings, the visual condition of the cable and any deviations.
What terms does kSIST FprEN IEC 60794-1-120:2026 define?
The document uses terms from IEC 60794-1-1, and a few terms are central to reading it correctly.
- Armoured optical fibre cable - the cable type being tested, typically used where extra protection is needed.
- Method E20 - the overall test for cable storage performance before installation.
- Method E20A - the circular coiling version of the test.
- Method E20B - the “figure-8” piling version of the test.
- Attenuation - the optical loss measured before and after the test.
- Single-mode fibres - the fibres for which the document sets a no-change criterion at 1 550 nm in Method E20B.
Who uses kSIST FprEN IEC 60794-1-120:2026?
kSIST FprEN IEC 60794-1-120:2026 is used by cable manufacturers, purchasers, test laboratories and technical teams that specify or verify installation readiness. It is especially relevant for underwater cable systems, ship loading and laying operations, and armoured cable delivery on drums.
In practice, these users rely on the document to agree test conditions, run the storage test consistently, compare results and document acceptance. It is also useful where a cable needs to be checked before installation in telecommunication and similar applications.
What changed in kSIST FprEN IEC 60794-1-120:2026 from the previous edition?
This document partially replaces IEC 60794-1-21:2015+AMD1:2020 CSV. The stated technical changes are:
- Method E20 from IEC 60794-1-21 is cancelled and replaced here.
- The object now includes typical cable structures that were added and updated.
- A figure was added for Method E20A.
- Reporting details were added for Method E20A.
- Method E20B, the “figure-8” piling test, was added.
Which standards are used with kSIST FprEN IEC 60794-1-120:2026?
kSIST FprEN IEC 60794-1-120:2026 relies on two named IEC documents:
- IEC 60793-1-46 - used for measuring changes in attenuation before and after Method E20B.
- IEC 60794-1-1 - provides the general specification terms and definitions used in this document.
IEC 60794-1-2 is also cited as a reference guide for test methods, general requirements and definitions.
What does the kSIST FprEN IEC 60794-1-120:2026 document contain?
kSIST FprEN IEC 60794-1-120:2026 contains the method descriptions, test set-ups and reporting points for cable storage testing before installation. It includes the object of each method, sample preparation, apparatus needs, procedures, requirements, and the details that must be specified or reported.
The document also includes two figures: one for the circular coiling set-up and one for the “figure-8” piling set-up. These parts are meant for practical testing, specification writing and comparison of results between cable makers and users.
Relations
- Effective Date
- 09-Sep-2025
- Effective Date
- 09-Sep-2025
Get Certified
Connect with accredited certification bodies for this standard

ANCE
Mexican certification and testing association.

Intertek Slovenia
Intertek testing, inspection, and certification services in Slovenia.
LNE (Laboratoire National de Métrologie et d'Essais)
French national laboratory for metrology and testing.
Sponsored listings
Frequently Asked Questions
kSIST FprEN IEC 60794-1-120:2026 is a draft published by the Slovenian Institute for Standardization (SIST). Its full title is "Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Cable storage performance before installation, method E20". This standard covers: Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Cable storage performance before installation, method E20
Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test procedures - Mechanical tests methods - Cable storage performance before installation, method E20
kSIST FprEN IEC 60794-1-120:2026 is classified under the following ICS (International Classification for Standards) categories: 33.180.10 - Fibres and cables. The ICS classification helps identify the subject area and facilitates finding related standards.
kSIST FprEN IEC 60794-1-120:2026 has the following relationships with other standards: It is inter standard links to SIST EN 60794-1-21:2015/A1:2020, SIST EN 60794-1-21:2015. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
kSIST FprEN IEC 60794-1-120:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
SLOVENSKI STANDARD
oSIST prEN IEC 60794-1-120:2025
01-september-2025
Optični kabli - 1-120. del: Splošna specifikacija - Osnovni preskusni postopki za
optične kable - Mehanske preskusne metode - Zmogljivost shranjevanja kablov
pred namestitvijo, metoda E20
Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test
procedures - Mechanical tests methods - Cable storage performance before installation,
method E20
Câbles à fibres optiques - Partie 1-120: Spécification générique - Procédures
fondamentales d’essais des câbles optiques - Méthodes d'essai mécaniques -
Performance de stockage du câble avant installation, méthode e20
Ta slovenski standard je istoveten z: prEN IEC 60794-1-120:2025
ICS:
33.180.10 (Optična) vlakna in kabli Fibres and cables
oSIST prEN IEC 60794-1-120:2025 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
oSIST prEN IEC 60794-1-120:2025
oSIST prEN IEC 60794-1-120:2025
86A/2595/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 60794-1-120 ED1
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2025-08-01 2025-10-24
SUPERSEDES DOCUMENTS:
86A/2500/CD, 86A/2593/CC
IEC SC 86A : FIBRES AND CABLES
SECRETARIAT: SECRETARY:
France Mr Laurent Gasca
OF INTEREST TO THE FOLLOWING COMMITTEES: HORIZONTAL FUNCTION(S):
ASPECTS CONCERNED:
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some
Countries” clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the
final stage for submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).
TITLE:
Optical fibre cables - Part 1-120: Generic specification - Basic optical cable test procedures -
Mechanical tests methods - Cable storage performance before installation, Method E20
PROPOSED STABILITY DATE: 2029
NOTE FROM TC/SC OFFICERS:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
oSIST prEN IEC 60794-1-120:2025
IEC CDV 60794-1-120 © IEC 2025
1 CONTENTS
3 FOREWORD . 2
4 1 Scope . 4
5 2 Normative references . 4
6 3 Terms and definitions . 4
7 4 Method E20 – Cable storage performance before installation . 4
8 4.1 Object . 4
9 4.2 General . 4
10 4.3 Method E20A: Circular coiling method . 5
11 4.3.1 Sample . 5
12 4.3.2 Apparatus . 5
13 4.3.3 Procedure . 5
14 4.3.4 Requirements . 5
15 4.3.5 Details to be specified . 5
16 4.3.6 Details to be reported . 6
17 4.4 Method E20B: “figure-8” piling method . 6
18 4.4.1 Sample . 6
19 4.4.2 Apparatus . 6
20 4.4.3 Procedure . 6
21 4.4.4 Requirements . 7
22 4.4.5 Details to be specified . 7
23 4.4.6 Details to be reported . 7
24 Bibliography . 8
26 Figure 1 – Test set-up of the circular coiling method . 6
oSIST prEN IEC 60794-1-120:2025
IEC CDV 60794-1-120 © IEC 2025
29 INTERNATIONAL ELECTROTECHNICAL COMMISSION
30 ____________
32 OPTICAL FIBRE CABLES –
34 Part 1-120: Generic specification –
35 Basic optical cable test procedures –
36 Mechanical test methods – Cable storage performance before installation,
37 Method E20
39 FOREWORD
40 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
41 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
42 co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
43 in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
44 Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their
45 preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
46 may participate in this preparatory work. International, governmental and non-governmental organizations liaising
47 with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
48 Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
49 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
50 consensus of opinion on the relevant subjects since each technical committee has representation from all
51 interested IEC National Committees.
52 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
53 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
54 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
55 misinterpretation by any end user.
56 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
57 transparently to the maximum extent possible in their national and regional publications. Any divergence between
58 any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
59 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
60 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
61 services carried out by independent certification bodies.
62 6) All users should ensure that they have the latest edition of this publication.
63 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
64 members of its technical committees and IEC National Committees for any personal injury, property damage or
65 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
66 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications.
67 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
68 indispensable for the correct application of this publication.
69 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent
70 rights. IEC shall not be held responsible for identifying any or all such patent rights.
71 IEC 60794-1-120 has been prepared by subcommittee 86A: Fibres and cables, of IEC te
...