Monitoring and alarm receiving centre - Part 2: Technical requirements

This part of EN 50518 specifies the technical requirements of an ARC. This also includes functional performance criteria and verification of performance.

Alarmempfangsstelle (AES) - Teil 2: Technische Anforderungen

Centre de contrôle et de réception d’alarme - Partie 2: Exigences techniques

Nadzorni in sprejemni centri za alarme - 2. del: Tehnične zahteve

Ta del standarda EN 50518 določa tehnične zahteve sprejemnih centrov za alarme. To vključuje tudi merila funkcionalne učinkovitosti in preverjanje učinkovitosti.

General Information

Status
Withdrawn
Publication Date
20-Nov-2013
Withdrawal Date
24-Jan-2022
Technical Committee
Current Stage
9900 - Withdrawal (Adopted Project)
Start Date
24-Jan-2022
Due Date
16-Feb-2022
Completion Date
25-Jan-2022

Relations

Buy Standard

Standard
EN 50518-2:2013
English language
14 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 50518-2:2013
01-december-2013
1DGRPHãþD
SIST EN 50518-2:2010
SIST EN 50518-2:2010/AC:2011
1DG]RUQLLQVSUHMHPQLFHQWUL]DDODUPHGHO7HKQLþQH]DKWHYH
Monitoring and alarm receiving centre - Part 2: Technical requirements
Alarmempfangsstelle (AES) - Teil 2: Technische Anforderungen
Centre de contrôle et de réception d’alarme - Partie 2: Exigences techniques
Ta slovenski standard je istoveten z: EN 50518-2:2013
ICS:
13.320 Alarmni in opozorilni sistemi Alarm and warning systems
SIST EN 50518-2:2013 en,fr
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 50518-2:2013

---------------------- Page: 2 ----------------------

SIST EN 50518-2:2013

EUROPEAN STANDARD
EN 50518-2

NORME EUROPÉENNE
November 2013
EUROPÄISCHE NORM

ICS 13.320 Supersedes EN 50518-2:2010, EN 50518-2:2010/AC:2011


English version


Monitoring and alarm receiving centre -
Part 2: Technical requirements



Centre de contrôle et de réception Alarmempfangsstelle (AES) -
d’alarme - Teil 2: Technische Anforderungen
Partie 2: Exigences techniques






This European Standard was approved by CENELEC on 2013-10-07. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels


© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 50518-2:2013 E

---------------------- Page: 3 ----------------------

SIST EN 50518-2:2013
EN 50518-2:2013 - 2 -
Contents Page
Foreword . 3
Introduction . 4
1 Scope . 5
2 Normative references . 5
3 Terms, definitions and abbreviations. 5
3.1 Terms and definitions . 5
3.2 Abbreviations . 6
4 Performance requirements . 6
5 Communication requirements . 8
6 Reception of signals . 8
6.1 General requirements . 8
6.2 Operator actions . 8
7 Testing . 8
7.1 General . 8
7.2 Daily tests . 8
7.3 Weekly tests . 9
7.4 Fault procedures and reporting . 9
8 Data . 9
8.1 General . 9
8.2 Client data . 9
8.3 Data of ARC external communications . 9
8.4 Log of operator actions . 10
9 Data storage . 10
10 Availability and verification of performance of the ARC . 10
11 Contingency plan . 10
11.1 General . 10
11.2 Abnormal occurrence examples . 10
Annex A (normative) ARC availability calculations . 12
Bibliography . 14

Figure
Figure 1 ― Sequence of operations . 7

---------------------- Page: 4 ----------------------

SIST EN 50518-2:2013
- 3 - EN 50518-2:2013
Foreword
This document (EN 50518-2:2013) has been prepared by CLC/TC 79 "Alarm systems".
The following dates are fixed:
(dop) 2014-10-07
• latest date by which this document has to be implemented
at national level by publication of an identical
national standard or by endorsement
(dow) 2016-10-07
• latest date by which the national standards conflicting with
this document have to be withdrawn
This document supersedes EN 50518-2:2010.
EN 50518-2:2013 includes the following significant technical changes with respect to EN 50518-2:2010.
– There was no mandatory connection for certification between the three parts of the standard with the
result that it could be possible to certify only against one or two of the three parts of the standard, which is
clearly not the purpose of the WG. This is solved by adding a sentence “This part of EN 50518 is to be
read in conjunction with Part 1 and Part 3, and cannot be used separately.” to the foreword.
– The scope is limited to intruder and hold-up alarm systems.
– All normative references are updated.
– Corrigendum AC:2011 is included, and event 1 of Annex A is removed.
EN 50518 consists of the following parts under the generic title “Monitoring and alarm receiving centre”:
 Part 1: Location and construction requirements;
 Part 2: Technical requirements;
 Part 3: Procedures and requirements for operation.
This part of EN 50518 is to be read in conjunction with Part 1 and Part 3, and cannot be used separately.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent rights.

---------------------- Page: 5 ----------------------

SIST EN 50518-2:2013
EN 50518-2:2013 - 4 -
Introduction
This European Standard applies to all Monitoring and Alarm Receiving Centres (MARCs) that monitor and/or
receive and/or process signals that require an emergency response.
In all existing EN 50131 series accomplished under CLC/TC 79 "Alarm systems", the abbreviation ARC is
used. To avoid confusion and to achieve consistency in terminology the abbreviation ARC will be used
throughout this European Standard, where MARC is equivalent for ARC.
It is noted that this European Standard cannot supersede any legislative requirements deemed necessary by
a National Government to control the security sector on a national basis. This European Standard cannot
interfere with items that are regulated by (inter)national regulations concerning external services (e.g. water,
wastewater, fuel supplies, gas, oil and mains power supplies).

---------------------- Page: 6 ----------------------

SIST EN 50518-2:2013
- 5 - EN 50518-2:2013
1 Scope
This part of EN 50518 specifies the technical requirements of an ARC. This also includes functional
performance criteria and verification of performance.
2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
EN 50131-1, Alarm systems – Intrusion and hold-up systems – Part 1: System requirements
EN 50136-1, Alarm systems – Alarm transmission systems and equipment – Part 1: General requirements for
alarm transmission systems
EN 50518-1, Monitoring and alarm receiving centre – Part 1: Location and construction requirements
EN 50518-3, Monitoring and alarm receiving centre – Part 3: Procedures and requirements for operation
3 Terms, definitions and abbreviations
3.1 Terms and definitions
For the purposes of this document, the terms and definitions given in EN 50518-1:2013 and the following
apply.
3.1.1
alarm transmission equipment
collective term to describe SPT, MCT and RCT
[SOURCE: EN 50136-1:2012, 4.1.4]
3.1.2
alarm transmission system
ATE and networks used to transfer information concerned with the state of one or more ASs to the AE of one
more ARCs
Note 1 to entry: An ATS may consist of ATPs of different classes, e.g. for use in so called "dual path systems".
[SOURCE: EN 50136-1:2012, 4.1.8, modified]
3.1.3
annunciation equipment
equipment located at an ARC which displays the alarm status, or the changed alarm status of ASs in
response to the receipt of incoming alarm messages
Note 1 to entry: The AE is not part of the ATS.
[SOURCE: EN 50136-1:2012, 4.1.12, modified]

---------------------- Page: 7 ----------
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.