SIST EN 61850-10:2013/A1:2025
(Amendment)Communication networks and systems for power utility automation - Part 10: Conformance testing (IEC 61850-10:2012/AMD1:2025)
Communication networks and systems for power utility automation - Part 10: Conformance testing (IEC 61850-10:2012/AMD1:2025)
Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen Energieversorgung - Teil 10: Konformitätsprüfung (IEC 61850-10:2012/AMD1:2025)
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 10: Essais de conformité (IEC 61850-10:2012/AMD1:2025)
Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije - 10. del: Preskušanje skladnosti - Dopolnilo A1 (IEC 61850-10:2012/AMD1:2025)
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
01-november-2025
Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije -
10. del: Preskušanje skladnosti - Dopolnilo A1 (IEC 61850-10:2012/AMD1:2025)
Communication networks and systems for power utility automation - Part 10:
Conformance testing (IEC 61850-10:2012/AMD1:2025)
Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen
Energieversorgung - Teil 10: Konformitätsprüfung (IEC 61850-10:2012/AMD1:2025)
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques
- Partie 10: Essais de conformité (IEC 61850-10:2012/AMD1:2025)
Ta slovenski standard je istoveten z: EN 61850-10:2013/A1:2025
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EUROPEAN STANDARD EN 61850-10:2013/A1
NORME EUROPÉENNE
EUROPÄISCHE NORM September 2025
ICS 33.200
English Version
Communication networks and systems for power utility
automation - Part 10: Conformance testing
(IEC 61850-10:2012/AMD1:2025)
Réseaux et systèmes de communication pour Kommunikationsnetze und -systeme für die
l'automatisation des systèmes électriques - Partie 10: Automatisierung in der elektrischen Energieversorgung -
Essais de conformité Teil 10: Konformitätsprüfung
(IEC 61850-10:2012/AMD1:2025) (IEC 61850-10:2012/AMD1:2025)
This amendment A1 modifies the European Standard EN 61850-10:2013; it was approved by CENELEC on 2025-09-03. CENELEC
members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this amendment the
status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This amendment exists in three official versions (English, French, German). A version in any other language made by translation under the
responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as
the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the
Netherlands, Norway, Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Türkiye and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2025 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN 61850-10:2013/A1:2025 E
European foreword
The text of document 57/2769/FDIS, future edition 2 of IEC 61850-10/AMD1, prepared by TC 57
"Power systems management and associated information exchange" was submitted to the IEC-
CENELEC parallel vote and approved by CENELEC as EN 61850-10:2013/A1:2025.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2026-09-30
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2028-09-30
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
Any feedback and questions on this document should be directed to the users’ national committee. A
complete listing of these bodies can be found on the CENELEC website.
Endorsement notice
The text of the International Standard IEC 61850-10:2012/AMD1:2025 was approved by CENELEC as
a European Standard without any modification.
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1 Where an International Publication has been modified by common modifications, indicated by (mod),
the relevant EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available
here: www.cencenelec.eu.
Add the following references:
Publication Year Title EN/HD Year
IEC 61869-9 2016 Instrument transformers - Part 9: Digital EN IEC 61869-9 2019
interface for instrument transformers
IEC/IEEE 61850-9-3 2016 Communication networks and systems for - -
power utility automation - Part 9-3:
Precision time protocol profile for power
utility automation
Delete the following reference:
Publication Year Title EN/HD Year
IEC 62439-3 2012 Industrial communication networks - High EN 62439-3 2012
availability automation networks - Part 3:
Parallel Redundancy Protocol (PRP) and
High availability Seamless Redundancy
(HSR)
IEC 61850-10 ®
Edition 2.0 2025-07
INTERNATIONAL
STANDARD
AMENDMENT 1
Communication networks and systems for power utility automation -
Part 10: Conformance testing
ICS 33.200 ISBN 978-2-8327-0566-7
IEC 61850-10:2012-12/AMD1:2025-07(en)
IEC 61850-10:2012/AMD1:2025 © IEC 2025
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
Communication networks and systems for power utility automation -
Part 10: Conformance testing
AMENDMENT 1
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC Publication(s)"). Their
preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
may participate in this preparatory work. International, governmental and non-governmental organizations liaising
with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence between
any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) IEC draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). IEC takes no position concerning the evidence, validity or applicability of any claimed patent rights in
respect thereof. As of the date of publication of this document, IEC had not received notice of (a) patent(s), which
may be required to implement this document. However, implementers are cautioned that this may not represent
the latest information, which may be obtained from the patent database available at https://patents.iec.ch [and/or]
www.iso.org/patents. IEC shall not be held responsible for identifying any or all such patent rights.
Amendment 1 to IEC 61850-10 has been prepared by IEC technical committee 57: Power
systems management and associated information exchange.
The major changes in this amendment are as follows:
– server device conformance test procedures have been updated; new test cases are: sAss4,
sAss5, sAssN7, sSrv14, sSrv15, sDs15, sSg11.sSg14, sRp15, sRp16, sRp17, sRp23,
sRpN9, sBr29, sBrN9, sBrN10, sGop12, sGos8.15, sGos20.23, sGosN7, sSBOns8, sTm6,
sTm7, sTmP1, sTmP2, sTmP5, sTmPN1;
– client device conformance test procedures have been updated; new test cases are: cAss10,
cAssN8, cAssN9, cSrv10, cSrvN7.cSrvN9, cSg46, cRp14.22, cRp40.46, cBr14.22,
cBr30.32, cBr46, cLog9, cLog46, cLogN4, cGcb46, cSBOns10, cFt16, cMsvcb1, cMsvcb2,
cMsvcb46;
IEC 61850-10:2012/AMD1:2025 © IEC 2025
– sampled values test procedures have been merged into server;
– server IED configuration tool related conformance test procedures have been updated; the
ICD export and SCD import test cases have been merged into server, new test cases are:
tTf4, tTf5;
– System Configuration Tool related conformance test procedures have been updated; new
test cases are: tSieN2, tSce8.10, tSceN2, tDfeN3, tSmo7.9, tSse4.7, tSsi5.6, tSeh7.11;
– GOOSE performance test procedures have been updated; the performance classes have
been updated to align with the performance class definition updates.
The text of this Amendment is based on the following documents:
Draft Report on voting
57/2769/FDIS 57/2797/RVD
Full information on the voting for its approval can be found in the report on voting indicated in
the above table.
The language used for the development of this Amendment is English.
This document was drafted in accordance with ISO/IEC Directives, Part 2, and developed in
accordance with ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement, available
at www.iec.ch/members_experts/refdocs. The main document types developed by IEC are
described in greater detail at www.iec.ch/publications/.
A list of all parts of IEC 61850 series, under the general title Communication networks and
systems for power utility automation, can be found on the IEC website.
The committee has decided that the contents of this document will remain unchanged until the
stability date indicated on the IEC website under webstore.iec.ch in the data related to the
specific document. At this date, the document will be
• reconfirmed,
• withdrawn, or
• revised.
___________
1 Scope
Add the following new text after the first paragraph of the Scope (before the NOTE):
Cyber security extensions provided by IEC 62351 are conformance tested against the
IEC 62351-100-4 and IEC 62351-100-6.
2 Normative references
Insert the following new normative references:
IEC/IEEE 61850-9-3:2016, Communication networks and systems for power utility automation
– Part 9-3: Precision time protocol profile for power utility
IEC 61850-10:2012/AMD1:2025 © IEC 2025
IEC 61869-9:2016, Instrument transformers – Part 9: Digital interface for instrument
transformers
Remove the following existing normative reference:
IEC 62439-3:2012, Industrial communication networks – High availability automation networks
– Part 3: Parallel Redundancy Protocol (PRP) and High Availability Seamless Redundancy
(HSR)
4 Abbreviated terms
Insert the following new abbreviated term:
PTP Precision Time Protocol
6 Device related conformance testing
Replace the existing text, figures (Figures 2 to 6) and tables (Tables 1 to 71) of Clause 6 with
the following new text, figures and tables:
6.1 Test methodology
Communication testing needs at least two devices to communicate with each other.
Comprehensive interoperability testing of all possible products is not feasible. Therefore, the
test concept shall include test devices, test configurations, and test scenarios. The dynamic
behaviour should be tested properly by using well-defined test cases.
Messages are generated to test the communication capabilities. Hardwired stimuli (contacts,
voltages, currents, etc.) and stimuli coming over a serial link if applicable should be used if
applicable.
Special attention shall be given to communication equipment such as star-couplers, switches,
etc. which shall support all requested features of the standard
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.