JWG 25 - TC 88/JWG 25
TC 88/JWG 25
General Information
IEC TS 61400-25-71:2019 focus on the communications between wind power plant components such as wind turbines and actors such as SCADA systems. Non-IEC 61850/IEC 61400-25 internal communication within wind power plant components is outside the normative scope of the IEC 61400-25 series.
This document describes how to extend the IEC 61400-25 series with the IEC 618506 Substation Configuration description Language (SCL) file format for describing communication-related Intelligent Electronic Device (IED) configurations of a wind turbine, wind power plant controller, meteorological mast, etc. The extension of SCL to the wind domain is intended to simplify integration of wind power plant equipment for clients, as well as their integration to the electrical system. The adoption of SCL allows formalised tool-based exchange of IED parameters, communication system configurations, switch yard (function) structures, as well as description of the relations between them.
The purpose of this format is to formally and efficiently exchange wind turbine and wind power plant IED capability descriptions, and system descriptions between IED engineering tools and the system engineering tool(s) of different manufacturers in a compatible way. The file format is also intended to provide report configuration and alarms as well as HMI interface information from a wind power plant. This information can be used to engineer overlying SCADA systems for the site, for connected DSO, or TSO, or for fleet operators' maintenance and surveillance systems. Finally, the SCL is intended as a documentation of the configuration and topology of the delivered system.
- Technical specification86 pagesEnglish languagesale 15% off
IEC 61400-25-5:2017 specifies standard techniques for testing of compliance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of users to purchase systems that integrate easily, operate correctly, and support the applications as intended. This part of IEC 61400-25 defines: the methods and abstract test cases for compliance testing of server and client devices used in wind power plants; the metrics to be measured in said devices according to the communication requirements specified in IEC 61400-25 (all parts). This new edition includes the following significant technical changes with respect to the previous edition:
- harmonization with structure and test cases in IEC 61850-10:2012;
- reduction of overlap between standards and simplification by increased referencing to the IEC 61850 standard series.
- Standard56 pagesEnglish languagesale 15% off
- Standard117 pagesEnglish and French languagesale 15% off
IEC 61400-25-1:2017 is also available as IEC 61400-25-1:2017 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.
IEC 61400-25-1:2017 gives an overall description of the principles and models used in the IEC 6140025 series, which is designed for a communication environment supported by a client-server model. Three areas are defined, that are modelled separately to ensure the scalability of implementations: wind power plant information models, information exchange model, and mapping of these two models to a standard communication profile. This new edition includes the following significant technical changes with respect to the previous edition: general harmonization of text and overview models with the other parts of the IEC 6140025 series, harmonization of definitions in other related standards.
- Standard73 pagesEnglish and French languagesale 15% off
IEC 61400-25-6:2016 specifies the information models related to condition monitoring for wind power plants and the information exchange of data values related to these models. This standard is to be used with other standards of the IEC 61400-25 series. This new edition includes the following significant technical changes with respect to the previous edition:
- major restructuring of the data model to accommodate flexibility; removal of UFF58 format;
- access to data using the standard reporting and logging functions;
- recommendations for creating data names to accommodate flexibility
- Standard99 pagesEnglish and French languagesale 15% off
IEC 61400-25-2:2015 specifies the information model of devices and functions related to wind power plant applications. In particular, it specifies the compatible logical node names, and data names for communication between wind power plant components. This includes the relationship between logical devices, logical nodes and data. The names defined in the IEC 61400-25 series are used to build the hierarchical object references applied for communicating with components in wind power plants. Main changes with respect to the previous edition consist of:
- harmonization with newer editions of IEC 61850 standards;
- reduction of overlap between standards and simplification by increased referencing,
- extension of data objects for operation of smart grids,
- extended and enhanced semantics for existing data objects, etc.
- Standard221 pagesEnglish and French languagesale 15% off
IEC 61400-25-3:2015 is available as IEC 61400-25-3:2015 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.
IEC 61400-25-3:2015 specifies an abstract communication service interface describing the information exchange between a client and a server for:
- data access and retrieval,
- device control,
- event reporting and logging,
- self-description of devices (device data dictionary),
- data typing and discovery of data types.
Main changes with respect to the previous edition consist of:
- harmonization with newer editions of IEC 61850 standards;
- reduction of overlap between standards and simplification by increased referencing, etc.
- Standard64 pagesEnglish and French languagesale 15% off