Monitoring and alarm receiving centre - Part 2: Technical requirements

This part of EN 50518 specifies the technical requirements of an ARC. This also includes functional performance criteria and verification of performance. This part of EN 50518 is to be read in conjunction with Part 1 and Part 3, and cannot be used separately.

Alarmempfangsstelle (AES) - Teil 2: Technische Anforderungen

Centre de contrôle et de réception d’alarme - Partie 2: Exigences techniques

Nadzorni in sprejemni centri za alarme - 2. del: Tehnične zahteve

Ta del standarda EN 50518 določa tehnične zahteve sprejemnih centrov za alarme. To vključuje tudi merila funkcionalne učinkovitosti in preverjanje učinkovitosti.

General Information

Status
Withdrawn
Publication Date
07-Nov-2013
Withdrawal Date
06-Oct-2016
Technical Committee
Drafting Committee
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
06-Feb-2022
Completion Date
06-Feb-2022

Relations

Effective Date
28-Jan-2023

Buy Standard

Standard
EN 50518-2:2013
English language
14 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 50518-2:2013
01-december-2013
1DGRPHãþD
SIST EN 50518-2:2010
SIST EN 50518-2:2010/AC:2011
1DG]RUQLLQVSUHMHPQLFHQWUL]DDODUPHGHO7HKQLþQH]DKWHYH
Monitoring and alarm receiving centre - Part 2: Technical requirements
Alarmempfangsstelle (AES) - Teil 2: Technische Anforderungen
Centre de contrôle et de réception d’alarme - Partie 2: Exigences techniques
Ta slovenski standard je istoveten z: EN 50518-2:2013
ICS:
13.320 Alarmni in opozorilni sistemi Alarm and warning systems
SIST EN 50518-2:2013 en,fr
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 50518-2:2013

---------------------- Page: 2 ----------------------

SIST EN 50518-2:2013

EUROPEAN STANDARD
EN 50518-2

NORME EUROPÉENNE
November 2013
EUROPÄISCHE NORM

ICS 13.320 Supersedes EN 50518-2:2010, EN 50518-2:2010/AC:2011


English version


Monitoring and alarm receiving centre -
Part 2: Technical requirements



Centre de contrôle et de réception Alarmempfangsstelle (AES) -
d’alarme - Teil 2: Technische Anforderungen
Partie 2: Exigences techniques






This European Standard was approved by CENELEC on 2013-10-07. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels


© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 50518-2:2013 E

---------------------- Page: 3 ----------------------

SIST EN 50518-2:2013
EN 50518-2:2013 - 2 -
Contents Page
Foreword . 3
Introduction . 4
1 Scope . 5
2 Normative references . 5
3 Terms, definitions and abbreviations. 5
3.1 Terms and definitions . 5
3.2 Abbreviations . 6
4 Performance requirements . 6
5 Communication requirements . 8
6 Reception of signals . 8
6.1 General requirements . 8
6.2 Operator actions . 8
7 Testing . 8
7.1 General .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.