EN 61850-7-410:2007
(Main)Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control
Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control
Specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant.
Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen Energieversorgung - Teil 7-410: Wasserkraftwerke - Kommunikation für Überwachung, Regelung und Steuerung
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 7-410: Centrales hydroélectriques - Communication pour la surveillance et le contrôle-commande
Komunikacijska omrežja in sistemi za avtomatizacijo uporabe električne energije - 7-410. del: Hidroelektrarne - Komunikacije za nadzorovanje in krmiljenje (IEC 61850-7-410:2007)
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
01-januar-2008
.RPXQLNDFLMVNDRPUHåMDLQVLVWHPL]DDYWRPDWL]DFLMRXSRUDEHHOHNWULþQHHQHUJLMH
GHO+LGURHOHNWUDUQH.RPXQLNDFLMH]DQDG]RURYDQMHLQNUPLOMHQMH,(&
Communication networks and systems for power utility automation -- Part 7-410:
Hydroelectric power plants - Communication for monitoring and control
Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen
Energieversorgung -- Teil 7-410: Wasserkraftwerke - Kommunikation für Überwachung,
Regelung und Steuerung
Réseaux et systèmes de communication pour l'automatisation des services de
distribution d'énergie -- Partie 7-410: Centrales hydroélectriques - Communication pour
la surveillance et le contrôle-commande
Ta slovenski standard je istoveten z: EN 61850-7-410:2007
ICS:
27.140 Vodna energija Hydraulic energy engineering
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EUROPEAN STANDARD
EN 61850-7-410
NORME EUROPÉENNE
November 2007
EUROPÄISCHE NORM
ICS 33.200
English version
Communication networks and systems for power utility automation -
Part 7-410: Hydroelectric power plants -
Communication for monitoring and control
(IEC 61850-7-410:2007)
Réseaux et systèmes de communication Kommunikationsnetze und -systeme
pour l'automatisation des services für die Automatisierung
de distribution d'énergie - in der elektrischen Energieversorgung -
Partie 7-410: Centrales hydroélectriques - Teil 7-410: Wasserkraftwerke -
Communication pour la surveillance Kommunikation für Überwachung,
et le contrôle-commande Regelung und Steuerung
(CEI 61850-7-410:2007) (IEC 61850-7-410:2007)
This European Standard was approved by CENELEC on 2007-10-01. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the
Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,
Sweden, Switzerland and the United Kingdom.
CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
Central Secretariat: rue de Stassart 35, B - 1050 Brussels
© 2007 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61850-7-410:2007 E
Foreword
The text of document 57/886/FDIS, future edition 1 of IEC 61850-7-410, prepared by IEC TC 57, Power
systems management and associated information exchange, was submitted to the IEC-CENELEC
parallel vote and was approved by CENELEC as EN 61850-7-410 on 2007-10-01.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2008-07-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2010-10-01
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 61850-7-410:2007 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:
IEC 61362 NOTE Harmonized as EN 61362:1998 (not modified).
IEC 61400-25-2 NOTE Harmonized as EN 61400-25-2:2007 (not modified).
IEC 61850-7-1 NOTE Harmonized as EN 61850-7-1:2003 (not modified).
IEC 61850-10 NOTE Harmonized as EN 61850-10:2005 (not modified).
IEC 61970-301 NOTE Harmonized as EN 61970-301:2004 (not modified).
IEC 62270 NOTE Harmonized as EN 62270:2004 (not modified).
__________
– 3 – EN 61850-7-410:2007
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year
1)
IEC/TS 61850-2 – Communication networks and systems in – –
substations -
Part 2: Glossary
1) 2)
IEC 61850-5 – Communication networks and systems in EN 61850-5 2003
substations -
Part 5: Communication requirements for
functions and device models
1) 2)
IEC 61850-6 – Communication networks and systems in EN 61850-6 2004
substations -
Part 6: Configuration description language for
communication in electrical substations
related to IEDs
IEC 61850-7-2 2003 Communication networks and systems in EN 61850-7-2 2003
substations -
Part 7-2: Basic communication structure for
substation and feeder equipment - Abstract
communication service interface (ACSI)
IEC 61850-7-3 2003 Communication networks and systems in EN 61850-7-3 2003
substations -
Part 7-3: Basic communication structure for
substation and feeder equipment - Common
data classes
IEC 61850-7-4 2003 Communication networks and systems in EN 61850-7-4 2003
substations -
Part 7-4: Basic communication structure for
substation and feeder equipment -
Compatible logical node classes and data
classes
1)
Undated reference.
2)
Valid edition at date of issue.
IEC 61850-7-410
Edition 1.0 2007-08
INTERNATIONAL
STANDARD
Communication networks and systems for power utility automation –
Part 7-410: Hydroelectric power plants – Communication for monitoring and
control
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
PRICE CODE
XC
ICS 33.200 ISBN 2-8318-9254-6
– 2 – 61850-7-410 © IEC:2007(E)
CONTENTS
FOREWORD.6
INTRODUCTION.8
1 Scope.9
2 Normative references .9
3 Terms and definitions .10
4 Abbreviations .10
5 Basic concepts for hydropower plant control and supervision .11
5.1 Functionality of a hydropower plant .11
5.2 Principles for water control in a river system .11
5.2.1 General .11
5.2.2 Principles for electrical control of a hydropower plant .12
5.3 Logical structure of a hydropower plant .13
6 Modelling concepts and examples .19
6.1 The concept of Logical Devices .19
6.2 Logical nodes for sensors, transmitters, supervising and monitoring functions.19
6.3 Address strings .20
6.4 Naming of logical nodes .21
6.5 Recommended naming structure for automatic control functions .21
6.6 Summary of logical nodes to be used in hydropower plants .22
6.6.1 General .22
6.6.2 Group C – Control functions .23
6.6.3 Group F – Functional blocks .23
6.6.4 Group H – Hydropower specific logical nodes.23
6.6.5 Group I – Interface and archiving.24
6.6.6 Group K – Mechanical and non-electrical primary equipment.25
6.6.7 Group L – Physical devices and common logical nodes .25
6.6.8 Group M – Metering and measurement .25
6.6.9 Group P – Protection functions .25
6.6.10 Group R – Protection related functions .26
6.6.11 Group S – Supervision and monitoring.26
6.6.12 Group T – Transducers and instrument transformers .27
6.6.13 Group X – Switchgear.27
6.6.14 Group Y – Power transformers .27
6.6.15 Group Z – Power system equipment .28
7 Logical Node Classes .28
7.1 Abbreviations and definitions used in Logical Node tables.28
7.1.1 Interpretation of Logical Node tables .28
7.1.2 Abbreviated terms used in Attribute Names .29
7.2 Logical Nodes representing functional blocks LN group F.30
7.2.1 Modelling remarks .30
7.2.2 LN: Counter Name: FCNT.30
7.2.3 LN: Curve shape description Name: FCSD .30
7.2.4 LN: Generic Filter Name: FFIL.31
7.2.5 LN: Control function output limitation Name: FLIM .31
7.2.6 LN: PID regulator Name: FPID.32
61850-7-410 © IEC:2007(E) – 3 –
7.2.7 LN: Ramp function Name: FRMP .33
7.2.8 LN: Set-point control function Name: FSPT.34
7.2.9 LN: Action at over threshold Name: FXOT .35
7.2.10 LN: Action at under threshold Name: FXUT .35
7.3 Hydropower specific Logical Nodes LN group H .36
7.3.1 Modelling remarks .36
7.3.2 LN: Turbine – generator shaft bearing Name: HBRG .36
7.3.3 LN: Combinator Name: HCOM.36
7.3.4 LN: Hydropower dam Name: HDAM .37
7.3.5 LN: Dam leakage supervision Name: HDLS .37
7.3.6 LN: Gate position indicator Name: HGPI.37
7.3.7 LN: Dam gate Name: HGTE.38
7.3.8 LN: Intake gate Name: HITG.38
7.3.9 LN: Joint control Name: HJCL.39
7.3.10 LN: Leakage supervision Name: HLKG .40
7.3.11 LN: Water level indicator Name: HLVL.40
7.3.12 LN: Mechanical brake Name: HMBR .41
7.3.13 LN: Needle control Name: HNDL .41
7.3.14 LN: Water net head data Name: HNHD.41
7.3.15 LN: Dam over-topping protection Name: HOTP.42
7.3.16 LN: Hydropower/water reservoir Name: HRES .42
7.3.17 LN: Hydropower unit sequencer Name: HSEQ .43
7.3.18 LN: Speed monitoring Name: HSPD .43
7.3.19 LN: Hydropower unit Name: HUNT .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.