Earned value management in project and programme management

ISO 21508:2018 provides guidance for practices of earned value management in project and programme management. It is applicable to any type of organization including public or private and any size or sector, as well as any type of project or programme in terms of complexity, size or duration. ISO 21508:2018 provides the following: a) terms and definitions; b) descriptions of the purpose and benefits of earned value management; c) the integration and relationship with project or programme management; d) an overview of the processes and process descriptions; e) basic requirements for an earned value management system; f) use of an earned value management system. ISO 21508:2018 does not provide guidance on the use of specific processes, methods or tools in the practice of earned value management. Annexes A, B and C describe cost, schedule and performance analysis, commonly used formulae with associated interpretations, and the integration of earned value with other project or programme management processes.

Management de la valeur acquise en management de projet et de programme

L'ISO 21508:2018 fournit des lignes directrices sur les pratiques de management par la valeur acquise dans le cadre du management de projets et de programmes. Il s'applique à tous les types d'organismes, qu'ils soient publics ou privés, quels que soient leur taille ou leur secteur d'activité, ainsi qu'à tout type de projet ou de programme en fonction de leur complexité, de leur taille ou de leur durée. L'ISO 21508:2018 fournit les éléments suivants: a) des termes et définitions; b) une description de la finalité et des bénéfices du management par la valeur acquise; c) l'intégration et les relations avec le management de projets ou de programmes; d) une vue d'ensemble des processus et leur description; e) les exigences fondamentales relatives à un système de management par la valeur acquise; f) l'utilisation d'un système de management par la valeur acquise. L'ISO 21508:2018 ne fournit pas de lignes directrices sur l'utilisation de processus, méthodes ou outils spécifiques pour les pratiques du management par la valeur acquise. Les Annexes A, B et C décrivent l'analyse des coûts, de l'échéancier et des performances, les formules couramment utilisées avec les interprétations associées, et l'intégration de la valeur acquise dans d'autres processus de management de projet ou de programme.

General Information

Status
Published
Publication Date
24-Apr-2018
Current Stage
9092 - International Standard to be revised
Completion Date
29-Sep-2023
Ref Project

Buy Standard

Standard
ISO 21508:2018 - Earned value management in project and programme management
English language
25 pages
sale 15% off
Preview
sale 15% off
Preview
Standard
ISO 21508:2018 - Management de la valeur acquise en management de projet et de programme
French language
27 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

INTERNATIONAL ISO
STANDARD 21508
First edition
2018-04
Earned value management in project
and programme management
Management de la valeur acquise en management de projet et de
programme
Reference number
ISO 21508:2018(E)
©
ISO 2018

---------------------- Page: 1 ----------------------
ISO 21508:2018(E)

COPYRIGHT PROTECTED DOCUMENT
© ISO 2018
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Fax: +41 22 749 09 47
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2018 – All rights reserved

---------------------- Page: 2 ----------------------
ISO 21508:2018(E)

Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms, definitions and abbreviated terms . 1
4 Overview of earned value management . 4
4.1 Earned value management . 4
4.2 Purpose and benefits of earned value management . 4
4.3 Guidelines for an earned value management system . 4
4.4 Earned value management planning . 5
4.5 Using earned value measurements and performance metrics . 5
5 Earned value management process steps . 6
5.1 General . 6
5.2 Step 1: Decompose the project or programme scope . 7
5.3 Step 2: Assign responsibility . 7
5.4 Step 3: Schedule the work . 7
5.5 Step 4: Develop time-phased budget . 8
5.6 Step 5: Assign objective measures of performance . 9
5.7 Step 6: Set the performance measurement baseline .10
5.8 Step 7: Authorize and perform the work .10
5.9 Step 8: Accumulate and report performance data .11
5.10 Step 9: Analyse performance data .
...

NORME ISO
INTERNATIONALE 21508
Première édition
2018-04
Management de la valeur acquise
en management de projet et de
programme
Earned value management in project and programme management
Numéro de référence
ISO 21508:2018(F)
©
ISO 2018

---------------------- Page: 1 ----------------------
ISO 21508:2018(F)

DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2018
Tous droits réservés. Sauf prescription différente ou nécessité dans le contexte de sa mise en oeuvre, aucune partie de cette
publication ne peut être reproduite ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique,
y compris la photocopie, ou la diffusion sur l’internet ou sur un intranet, sans autorisation écrite préalable. Une autorisation peut
être demandée à l’ISO à l’adresse ci-après ou au comité membre de l’ISO dans le pays du demandeur.
ISO copyright office
Case postale 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Tél.: +41 22 749 01 11
Fax: +41 22 749 09 47
E-mail: copyright@iso.org
Web: www.iso.org
Publié en Suisse
ii © ISO 2018 – Tous droits réservés

---------------------- Page: 2 ----------------------
ISO 21508:2018(F)

Sommaire Page
Avant-propos .iv
Introduction .v
1 Domaine d'application . 1
2 Références normatives . 1
3 Termes, définitions et abréviations . 1
3.1 Termes et définitions . 1
3.2 Abréviations . 3
4 Aperçu général du management par la valeur acquise . 4
4.1 Management par la valeur acquise . 4
4.2 Finalité et bénéfices du management par la valeur acquise . 4
4.3 Lignes directrices relatives à un système de management par la valeur acquise . 5
4.4 Planification du management par la valeur acquise. 5
4.5 Utilisation des mesures de la valeur acquise et des indicateurs de performance . 6
5 Étapes des processus de management par la valeur acquise . 6
5.1 Généralités . 6
5.2 Étape 1: Décomposer le périmètre du projet ou du programme. 7
5.3 Étape 2: Attribuer la responsabilité . 8
5.4 Étape 3: Planifier le travail. 8
5.5 Étape 4: Élaborer un budget échelonné dans le temps . 9
5.6 Étape 5: Définir des mesures objectives de la performance .10
5.7 Étape 6: Établir une référence de base de la mesure de la performance .11
5.8 Étape 7: Autoriser et réaliser le travail .12
5.9 Étape 8: Rassembler et consigner les données de performance dans un
...