Industrial communication networks - Profiles -- Part 5-14: Installation of fieldbuses - Installation profiles for CPF 14

This part of IEC 61784-5 specifies the installation profiles for CPF 14 (EPA1). The installation profiles are specified in the annex. This annex is read in conjunction with IEC 61918:2013.

Industrielle Kommunikationsnetze - Profile -- Teil 5-14: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 14

Réseaux de communication industriels - Profils -- Partie 5-14: Installation des bus de terrain - Profils d'installation pour CPF 14

La CEI 61784-5-14:2013 définit les profils d'installation applicables à la CPF 14 (EPA). Chaque profil d'installation de CP est spécifié dans une partie séparée de la présente série de normes. Cette norme fait partie d'une série élaborée pour faciliter l'utilisation des réseaux de communication dans des systèmes de contrôle-commande industriels. Cette troisième édition annule et remplace la deuxième édition publiée en 2010, dont elle constitue une révision technique. Cette édition inclut les modifications suivantes:
- ajout d'exigences pour CP 14/3,
- ajout de recommandations pour les applications concernant les réseaux en topologie linéaire/annulaire,
- mise à jour du Tableau A.2 et du Tableau A.6. La présente norme doit être utilisée conjointement à la CEI 61918:2013.

Industrijska komunikacijska omrežja - Profili - 5-14. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 14 (IEC 61784-5-14:2013)

General Information

Status
Published
Publication Date
09-Mar-2014
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
20-Dec-2013
Due Date
24-Feb-2014
Completion Date
10-Mar-2014

Relations

Buy Standard

Standard
EN 61784-5-14:2014 - BARVE
English language
35 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 61784-5-14:2014
01-april-2014
1DGRPHãþD
SIST EN 61784-5-14:2012
Industrijska komunikacijska omrežja - Profili - 5-14. del: Inštalacija procesnih vodil
- Inštalacijski profili za CPF 14 (IEC 61784-5-14:2013)
Industrial communication networks - Profiles -- Part 5-14: Installation of fieldbuses -
Installation profiles for CPF 14
Industrielle Kommunikationsnetze - Profile -- Teil 5-14: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 14
Réseaux de communication industriels - Profils -- Partie 5-14: Installation des bus de
terrain - Profils d'installation pour CPF 14
Ta slovenski standard je istoveten z: EN 61784-5-14:2013
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
SIST EN 61784-5-14:2014 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 61784-5-14:2014

---------------------- Page: 2 ----------------------

SIST EN 61784-5-14:2014

EUROPEAN STANDARD
EN 61784-5-14

NORME EUROPÉENNE
December 2013
EUROPÄISCHE NORM

ICS 25.040.40; 35.100.40 Supersedes EN 61784-5-14:2012


English version


Industrial communication networks -
Profiles -
Part 5-14: Installation of fieldbuses -
Installation profiles for CPF 14
(IEC 61784-5-14:2013)


Réseaux de communication industriels -  Industrielle Kommunikationsnetze -
Profils - Profile -
Partie 5-14: Installation des bus de terrain - Teil 5-14: Feldbusinstallation -
Profils d'installation pour CPF 14 Installationsprofile für die
(CEI 61784-5-14:2013) Kommunikationsprofilfamilie 14
(IEC 61784-5-14:2013)




This European Standard was approved by CENELEC on 2013-10-18. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels


© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61784-5-14:2013 E

---------------------- Page: 3 ----------------------

SIST EN 61784-5-14:2014
EN 61784-5-14:2013 - 2 -
Foreword
The text of document 65C/738/FDIS, future edition 2 of IEC 61784-5-14, prepared by
SC 65C "Industrial networks" of IEC/TC 65 "Industrial-process measurement, control and automation"
was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as
EN 61784-5-14:2013.

The following dates are fixed:
• latest date by which the document has to be (dop) 2014-07-18
implemented at national level by
publication of an identical national
standard or by endorsement
(dow) 2016-10-18
• latest date by which the national
standards conflicting with the
document have to be withdrawn

This document supersedes EN 61784-5-14:2012.

IEC 61784-5-14:2013 includes the following significant technical changes with respect to
EN 61784-5-14:2012:
- requirements for CP 14/3 have been added;
- recommendations for the applications about the linear/ring topology networks have been added;
- Table A.2 and Table A.6 have been updated.

This standard is to be used in conjunction with EN 61918:2013.

Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such
patent rights.

Endorsement notice
The text of the International Standard IEC 61784-5-14:2013 was approved by CENELEC as a
European Standard without any modification.

---------------------- Page: 4 ----------------------

SIST EN 61784-5-14:2014
- 3 - EN 61784-5-14:2013
Annex ZA
(normative)

Normative references to international publications
with their corresponding European publications

The following documents, in whole or in part, are normatively referenced in this document and are
indispensable for its application. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.

Annex ZA of EN 61918:2013 applies, except as follows:

Publication Year Title EN/HD Year
Addition to Annex ZA of EN 61918:2013:
IEC 61918 2013 Industrial communication networks - EN 61918 2013
Installation of communication networks in
industrial premises

---------------------- Page: 5 ----------------------

SIST EN 61784-5-14:2014

---------------------- Page: 6 ----------------------

SIST EN 61784-5-14:2014




IEC 61784-5-14

®


Edition 2.0 2013-09




INTERNATIONAL



STANDARD




NORME



INTERNATIONALE
colour

inside










Industrial communication networks – Profiles –

Part 5-14: Installation of fieldbuses – Installation profiles for CPF 14




Réseaux de communication industriels – Profils –

Partie 5-14: Installation des bus de terrain – Profils d'installation pour CPF 14















INTERNATIONAL

ELECTROTECHNICAL

COMMISSION


COMMISSION

ELECTROTECHNIQUE

PRICE CODE
INTERNATIONALE

CODE PRIX V


ICS 25.040.40; 35.100.40 ISBN 978-2-8322-1070-3



Warning! Make sure that you obtained this publication from an authorized distributor.

Attention! Veuillez vous assurer que vous avez obtenu cette publication via un distributeur agréé.

® Registered trademark of the International Electrotechnical Commission
Marque déposée de la Commission Electrotechnique Internationale

---------------------- Page: 7 ----------------------

SIST EN 61784-5-14:2014
– 2 – 61784-5-14 © IEC:2013
CONTENTS
FOREWORD . 4
INTRODUCTION . 6
1 Scope . 7
2 Normative references . 7
3 Terms, definitions and abbreviated terms . 7
4 CPF 14: Overview of installation profiles . 7
5 Installation profile conventions . 7
6 Conformance to installation profiles . 8
Annex A (Normative) CP 14/1, 14/2 and 14/3 (EPA) specific installation profile . 9
A.1 Installation profile scope . 9
A.2 Normative references . 9
A.3 Installation profile terms, definitions, and abbreviated terms . 9
A.3.1 Terms and definitions . 9
A.3.2 Abbreviated terms . 9
A.3.3 Conventions for installation profiles . 9
A.4 Installation planning . 9
A.4.1 General . 9
A.4.2 Planning requirements . 9
A.4.3 Network capabilities . 12
A.4.4 Selection and use of cabling components . 16
A.4.5 Cabling planning documentation . 23
A.4.6 Verification of cabling planning specification . 23
A.5 Installation implementation . 23
A.5.1 General requirements . 23
A.5.2 Cable installation . 23
A.5.3 Connector installation . 25
A.5.4 Terminator installation . 30
A.5.5 Device installation . 30
A.5.6 Coding and labelling . 30
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 30
A.5.8 As-implemented cabling documentation . 30
A.6 Installation verification and installation acceptance test . 30
A.6.1 General . 30
A.6.2 Installation verification . 30
A.6.3 Installation acceptance test . 31
A.7 Installation administration . 32
A.8 Installation maintenance and installation troubleshooting . 32

Figure 1 – Standards relationships . 6
Figure A.1 – Example of EPA explosion-proof system . 10
Figure A.2 – Earth of zener safety barrier . 11
Figure A.3 – Earth of isolated safety barrier . 11
Figure A.4 – Three stars coupled to a ring topology . 12
Figure A.5 – Five daisy chain lines coupled to a ring topology . 12

---------------------- Page: 8 ----------------------

SIST EN 61784-5-14:2014
61784-5-14 © IEC:2013 – 3 –
Figure A.6 – Five sub-rings coupled to a ring topology . 13
Figure A.7 – Example of power with Ethernet . 15
Figure A.8 – Example of power supply over 0,2 A . 16
Figure A.9 – Example of power with Ethernet in linear/ring topology network . 16
Figure A.10 – Examples of earthing method for the linear/ring topologies network . 22
Figure A.11 – Pin assignment of sub-D connector . 25
Figure A.12 – Example of a 4-pin open style connector . 27
Figure A.13 – Example of a 6-pin open style connector . 28
Figure A.14 – Example of an 8-pin open style connector . 29

Table A.1 – Network characteristics for balanced cabling based on Ethernet . 14
Table A.2 – Network characteristics for optical fibre cabling . 14
Table A.3 – Information relevant to copper cable . 16
Table A.4 – Information relevant to copper cable: fixed cables . 17
Table A.5 – Information relevant to copper cable: cords . 17
Table A.6 – Information relevant to optical fibre cables . 18
Table A.7 – Connectors for balanced cabling CPs based on Ethernet . 19
Table A.8 – Optical fibre connecting hardware . 19
Table A.9 – Relationship between FOC and fibre type (CP 14/1, CP 14/2 and CP 14/3) . 20
Table A.10 – Specific connectors for balanced cabling based on Ethernet . 20
Table A.11 – Requirements of sub-D and open style connector . 21
Table A.12 – Parameters for balanced cables . 23
Table A.13 – Parameters for silica optical fibre cables . 24
Table A.14 – Parameters for POF optical fibre cables . 24
Table A.15 – Parameters for hard cladded silica optical fibre cables . 24
Table A.16 – Signal lines assignment of sub-D connector . 26
Table A.17 – Signal lines assignment of sub-D connector for 1 000 Base Ethernet . 26
Table A.18 – Signal lines assignment for a 4-pin open style connector . 27
Table A.19 – Signal lines assignment for a 6-pin open style connector . 28
Table A.20 – Signal lines assignment for an 8-pin open style connector(10/100 Mbps) . 29
Table A.21 – Signal lines assignment for an 8-pin open style connector(1 000 Mbit/s) . 30

---------------------- Page: 9 ----------------------

SIST EN 61784-5-14:2014
– 4 – 61784-5-14 © IEC:2013
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________

INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –

Part 5-14: Installation of fieldbuses –
Installation profiles for CPF 14


FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 61784-5-14 has been prepared by subcommittee 65C: Industrial
networks, of IEC technical committee 65: Industrial-process measurement, control and
automation.
This second edition cancels and replaces the first edition issued in 2010. It constitutes a
technical revision.
The main technical changes with regard to the previous edition are as follows:
• requirements for CP 14/3 have been added,
• recommendations for the applications about the linear/ring topology networks have
been added,
• Table A.2 and Table A.6 have been updated.
This standard is to be used in conjunction with IEC 61918:2013.

---------------------- Page: 10 ----------------------

SIST EN 61784-5-14:2014
61784-5-14 © IEC:2013 – 5 –
The text of this standard is based on the following documents:
FDIS Report on voting
65C/738/FDIS 65C/743/RVD

Full information on the voting for the approval of this standard can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
A list of all parts of IEC 61784-5 series, under the general title Industrial communication
networks – Profiles – Installation of fieldbuses, can be found on the IEC website.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC web site under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.

IMPORTANT – The 'colour inside' logo on the cover page of this publication indicates
that it contains colours which are considered to be useful for the correct
understanding of its contents. Users should therefore print this document using a
colour printer.

---------------------- Page: 11 ----------------------

SIST EN 61784-5-14:2014
– 6 – 61784-5-14 © IEC:2013
INTRODUCTION
This International Standard is one of a series produced to facilitate the use of communication
networks in industrial control systems.
IEC 61918:2013 provides the common requirements for the installation of communication
networks in industrial control systems. This installation profile standard provides the
installation profiles of the communication profiles (CP) of a specific communication profile
family (CPF) by stating which requirements of IEC 61918 fully apply and, where necessary, by
supplementing, modifying, or replacing the other requirements (see Figure 1).
For general background on fieldbuses, their profiles, and relationship between the installation
profiles specified in this standard, see IEC 61158-1.
Each CP installation profile is specified in a separate annex of this standard. Each annex is
structured exactly as the reference standard IEC 61918 for the benefit of the persons
representing the roles in the fieldbus installation process as defined in IEC 61918 (planner,
installer, verification personnel, validation personnel, maintenance personnel, administration
personnel). By reading the installation profile in conjunction with IEC 61918, these persons
immediately know which requirements are common for the installation of all CPs and which
are modified or replaced. The conventions used to draft this standard are defined in Clause 5.
The provision of the installation profiles in one standard for each CPF (for example
IEC 61784-5-14 for CPF 14), allows readers to work with standards of a convenient size.

Figure 1 – Standards relationships

---------------------- Page: 12 ----------------------

SIST EN 61784-5-14:2014
61784-5-14 © IEC:2013 – 7 –
INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –

Part 5-14: Installation of fieldbuses –
Installation profiles for CPF 14



1 Scope
1
This part of IEC 61784-5 specifies the installation profiles for CPF 14 (EPA ).
The installation profiles are specified in the annex. This annex is read in conjunction with
IEC 61918:2013.
2 Normative references
The following documents, in whole or in part, are normatively referenced in this document and
are indispensable for its application. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 61918:2013, Industrial communication networks – Installation of communication networks
in industrial premises
The normative references of IEC 61918:2013, Clause 2, apply.
3 Terms, definitions and abbreviated terms
For the purposes of this document, the terms, definitions and abbreviated terms of
IEC 61918 :2013 Clause 3, apply.
4 CPF 14: Overview of installation profiles
CPF 14 consists of three communication profiles as specified in IEC 61784-2.
The installation requirements for CP 14/1, CP 14/2 and CP 14/3 (EPA) are specified in
Annex A.
5 Installation profile conventions
The numbering of the clauses and subclauses in the annexes of this standard corresponds to
the numbering of IEC 61918 main clauses and subclauses.
The annex clauses and subclauses of this standard supplement, modify, or replace the
respective clauses and subclauses in IEC 61918.
___________
1 EPA is the technology name of the CPF14. EPA is the trade name of Zhejiang SUPCON Technology Group Co.
Ltd, China. This information is given for the convenience of users of this document and does not constitute an
endorsement by IEC of the trademark holder or any of its products. Compliance to this profile does not require
use of the trade name. Use of the trade name requires permission of the trade name holder.

---------------------- Page: 13 ----------------------

SIST EN 61784-5-14:2014
– 8 – 61784-5-14 © IEC:2013
Where there is no corresponding subclause of IEC 61918:2013 in the normative annexes in
this standard, the subclause of IEC 61918 applies without modification.
The annex heading letter represents the installation profile assigned in Clause 4. The annex
heading number shall represent the corresponding numbering of IEC 61918.
EXAMPLE “Subclause A.4.4” in IEC 61784-5-14 means that CP 14/2 specifies the subclause 4.4 of IEC 61918.
All main clauses of IEC 61918 are cited and apply in full unless otherwise stated in each
normative installation profile annex.
If all subclauses of a (sub)clause are omitted, then the corresponding IEC 61918 (sub)clause
applies.
If in a (sub)clause it is written “Not applicable.”, then the corresponding
IEC 61918 (sub)clause does not apply.
If in a (sub)clause it is written “Addition:”, then the corresponding IEC 61918 (sub)clause
applies with the additions written in the profile.
If in a (sub)clause it is written “Replacement:”, then the text provided in the profile replaces
the text of the corresponding IEC 61918 (sub)clause.
NOTE A replacement can also comprise additions.
If in a (sub)clause it is written “Modification:”, then the corresponding IEC 61918 (sub)clause
applies with the modifications written in the profile.
If all (sub)clauses of a (sub)clause are omitted but in this (sub)clause it is written
× has addition:” (or “replacement:”) or “(Sub)clause x is not applicable.”, then
“(Sub)clause
(sub)clause x becomes valid as declared and all the other corresponding
IEC 61918 (sub)clauses apply.
6 Conformance to installation profiles
Each installation profile within this standard includes part of IEC 61918:2013. It may also
include defined additional specifications.
2
A statement of compliance to an installation profile of this standard shall be stated as either
3
Compliance to IEC 61784-5-14:2013 for CP 14/m or
Compliance to IEC 61784-5-14 (Ed.2.0) for CP 14/m
where the name within the angle brackets < > is optional and the angle brackets are not to be
included. The m within CP 14/m shall be replaced by the profile number 1 to 3.
NOTE The name can be the name of the profile, for example EPA-NRT, EPA-RT, or EPA-FRT.
If the name is a trade name then the permission of the trade name holder shall be required.
Product standards shall not include any conformity assessment aspects (including quality
management provisions), neither normative nor informative, other than provisions for product
testing (evaluation and examination).
___________
2
 In accordance with ISO/IEC Directives.
3
The date should not be used when the edition number is used.

---------------------- Page: 14 ----------------------

SIST EN 61784-5-14:2014
61784-5-14 © IEC:2013 – 9 –
Annex A
(Normative)

CP 14/1, 14/2 and 14/3 (EPA) specific installation profile

A.1 Installation profile scope
Addition:
This standard specifies the installation profile for Communication Profile CP 14/1, CP 14/2
and CP14/3 (EPA). The CP 14/1, CP 14/2 and CP14/3 are specified in IEC 61784-2.
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
Not applicable.
A.4 Installation planning
A.4.1 General
A.4.1.1 Objective
A.4.1.2 Cabling in industrial premises
A.4.1.3 The planning process
A.4.1.4 Specific requirements for CPs
Not applicable.
A.4.1.5 Specific requirements for generic cabling in accordance with ISO/IEC 24702
A.4.2 Planning requirements
A.4.2.1 Safety
A.4.2.1.1 General
A.4.2.1.2 Electric safety
A.4.2.1.3 Functional safety
A.4.2.1.4 Intrinsic safety
Addition:

---------------------- Page: 15 ----------------------

SIST EN 61784-5-14:2014
– 10 – 61784-5-14 © IEC:2013
In some CP14/2 applications, intrinsic safety functionality may be required for the devices
mounted in the area with flammable gases or fuels according to the relevant national or local
regulations.
Power Operator PC
EPA Bridge


Switch
Safe area
Safety Barrier
Dangerous area


Switch
Intrinsic

safety
device


Switch Intrinsic

safety
device
Intrinsic
safety
device

Figure A.1 – Example of EPA explosion-proof system
For example (see Figure A.1), among EPA explosion-proof systems, switches are in
explosion-proof field boxes, and field devices are intrinsically safe. In an intrinsic safety
system, each intrinsically safe device should be connected with three safety barriers. Two of
them are connected with the sending signal pairs (TX+/TX-) and the receiving signal pairs
(RX+/RX-), and the other one is connected with the power supply. The power cable to the
explosion-proof field box should
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.