(Main)Environmental Engineering (EE) - Monitoring and control interface for infrastructure equipment (power, cooling and building environment systems used in telecommunication networks) - Part 12: ICT equipment power, energy and environmental parameters monitoring information model
Environmental Engineering (EE) - Monitoring and control interface for infrastructure equipment (power, cooling and building environment systems used in telecommunication networks) - Part 12: ICT equipment power, energy and environmental parameters monitoring information model
The present document defines measurement and monitoring of power, energy and environmental parameters for ICT equipment in telecommunications or data centre or customer premises. It defines the power, energy and environmental parameters monitoring interface of ICT equipment based on generic ETSI ES 202 336-1 [1] interface so that correlations can be made with ICT equipment parameters (traffic, flowrate, number of connected lines, radio setting, QoS KPI, etc.) in the Network Management System (NMS). Correlations of monitored data (power, energy consumption and environmental values) with other ICT equipment functional parameters and settings are not in the scope of the present document. The monitoring interface covers:
• Internal power consumption measurement on the ICT equipment powered in DC and AC.
• Power consumption measurement external to the ICT equipment (if not implemented internally, e.g. legacy equipment).
• Energy metering based on power consumption measurement.
• Environmental parameters of the ICT equipment (e.g. temperature at air inlet of equipment).
The present document defines:
• The minimum set of exchanged information required at the interface, including parameters such as measurement type (e.g. RMS), accuracy, range, etc. and settings such as data acquisition and transmission period, etc. This includes the data preparation, recording and transmission functions.
• The testing method of some parameters and functions.
Text tables in annexes A and B with data exchange described in "natural language"
Okoljski inženiring (EE) - Nadzorovalni in krmilni vmesnik za infrastrukturno opremo (elektroenergetski, hladilni in stavbni okoljski sistemi v telekomunikacijskih omrežjih) - 12. del: Oprema za napajanje IKT, energija in okoljski parametri za nadzorovanje informacijskega modela
General Information
Standards Content (Sample)
Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
ETSI STANDARD
Environmental Engineering (EE);
Monitoring and control interface for infrastructure equipment
(power, cooling and building environment systems used in
telecommunication networks);
Part 12: ICT equipment power, energy and environmental
parameters monitoring information model
2 Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
Reference
RES/EE-02106
Keywords
control, energy efficiency, interface, management,
network monitoring, power, system
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from the
ETSI Search & Browse Standards application.
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format on ETSI deliver repository.
Users should be aware that the present document may be revised or have its status changed,
this information is available in the Milestones listing.
If you find errors in the present document, please send your comments to
the relevant service listed under Committee Support Staff.
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure (CVD) program.
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2025.
All rights reserved.
ETSI
3 Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
Contents
Intellectual Property Rights . 4
Foreword . 4
Executive summary . 5
Modal verbs terminology . 5
Introduction . 5
1 Scope . 6
2 References . 6
2.1 Normative references . 6
2.2 Informative references . 7
3 Definition of terms, symbols and abbreviations . 8
3.1 Terms . 8
3.2 Symbols . 10
3.3 Abbreviations . 10
4 ICT power, energy and environmental parameters monitoring system . 11
4.1 General description. 11
4.2 Complementarity to existing site power and air-conditioning measurements . 13
4.3 Different site cases . 13
4.3.1 Simple site case . 13
4.3.2 Complex site case . 14
4.4 Measurement and monitoring description . 15
4.4.0 General description . 15
4.4.1 Internal measurements type 1 (Built-in in ICT equipment) . 15
4.4.2 External measurements type 2 (external sensors) for ICT equipment . 16
4.4.3 Common requirements for external (type 2) and internal (type 1) measurement . 17
4.5 PEE data analysis services. 17
Annex A (normative): Summary of mandatory monitoring / supervision information and
f unctions . 19
A.0 General description of mandatory monitoring / supervision information and functions tables . 19
A.1 Table for ICT equipment power, energy and environmental parameters measurements . 20
Annex B (informative): Summary of non-mandatory monitoring / supervision information
and functions . 22
B.0 General description of non mandatory monitoring / supervision information and functions tables . 22
B.1 Table for ICT equipment power, energy and environmental parameters . 23
Annex C (informative): 3GPP NR Management reference model and generic management
service definitions . 25
Annex D (informative): Bibliography . 26
Annex E (informative): Change history . 27
History . 28
ETSI
4 Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations
pertaining to these essential IPRs, if any, are publicly available for ETSI members and non-members, and can be
found in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to
ETSI in respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the
ETSI IPR online database.
Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs,
including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not
referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become,
essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its
Members. 3GPP™, LTE™ and 5G™ logo are trademarks of ETSI registered for the benefit of its Members and of the
3GPP Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of ®
the oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association.
Foreword
This final draft ETSI Standard (ES) has been produced by ETSI Technical Committee Environmental Engineering (EE),
and is now submitted for the ETSI Membership Approval Procedure (MAP).
The present document is part 12 of a multi-part deliverable covering monitoring and control interface for infrastructure
equipment (power, cooling and building environment systems used in telecommunication networks), as identified
below:
Part 1: "Generic Interface";
Part 2: "DC power system control and monitoring information model";
Part 3: "AC UPS power system control and monitoring information model";
Part 4: "AC distribution power system control and monitoring information model";
Part 5: "AC diesel back-up generator system control and monitoring information model";
Part 6: "Air Conditioning System control and monitoring information model";
Part 7: "Other utilities system control and monitoring information model";
Part 8: "Remote Power Feeding System control and monitoring information model";
Part 9: "Alternative Power Systems";
Part 10: "AC inverter power system control and monitoring information model";
Part 11: "Battery system with integrated control and monitoring information model";
Part 12: "ICT equipment power, energy and environmental parameters monitoring information model".
ETSI
5 Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
Executive summary
The goal of the present document is to define the measurement of electrical power and energy consumption of ICT
equipment as well as environmental parameters (temperature, hygrometry) in order to improve energy monitoring and
to correlate the power consumption to equipment operation activity (telecom traffic, computation, etc.). It is also to
define the transfer protocol of this measurement data from site to network operation centre. Understanding power
consumption provides the opportunity to reduce energy consumption of equipment and/or the network. Granularity,
measurement period and accuracies are defined to meet these targets. They may depend on equipment types and
location in the different segments of a network (customer termination, access, core, data-centre, etc.). In addition, these
measurements can be used to improve engineering and operation including more accurate dimensioning of power
systems, network evolution modelling and prevision, audit on field, etc.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
Introduction
The present document was developed jointly by ETSI TC EE and ITU-T Study Group 5. It is published respectively by
ITU and ETSI as Recommendation ITU-T L.1396 [i.2] and ETSI ES 202 336-12 [i.16] (the present document), which
are technically-equivalent.
ETSI
6 Final draft ETSI ES 202 336-12 V1.3.1 (2025-07)
1 Scope
The present document defines measurement and monitoring of power, energy and environmental parameters for ICT
equipment in telecommunications or data centre or customer premises.
It defines the power, energy and environmental parameters monitoring interface of ICT equipment based on generic
ETSI ES 202 336-1 [1] interface so that correlations can be made with ICT equipment parameters (traffic, flowrate,
number of connected lines, radio setting, QoS KPI, etc.) in the Network Management System (NMS).
Correlations of monitored data (power, energy consumption and environm
...
SLOVENSKI STANDARD
01-november-2025
Okoljski inženiring (EE) - Nadzorovalni in krmilni vmesnik za infrastrukturno
opremo (elektroenergetski, hladilni in stavbni okoljski sistemi v
telekomunikacijskih omrežjih) - 12. del: Oprema za napajanje IKT, energija in
okoljski parametri za nadzorovanje informacijskega modela
Environmental Engineering (EE) - Monitoring and control interface for infrastructure
equipment (power, cooling and building environment systems used in telecommunication
networks) - Part 12: ICT equipment power, energy and environmental parameters
monitoring information model
Ta slovenski standard je istoveten z: ETSI ES 202 336-12 V1.3.1 (2025-09)
ICS:
19.040 Preskušanje v zvezi z Environmental testing
okoljem
33.050.01 Telekomunikacijska Telecommunication terminal
terminalska oprema na equipment in general
splošno
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
ETSI STANDARD
Environmental Engineering (EE);
Monitoring and control interface for infrastructure equipment
(power, cooling and building environment systems used in
telecommunication networks);
Part 12: ICT equipment power, energy and environmental
parameters monitoring information model
2 ETSI ES 202 336-12 V1.3.1 (2025-09)
Reference
RES/EE-02106
Keywords
control, energy efficiency, interface, management,
network monitoring, power, system
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from the
ETSI Search & Browse Standards application.
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format on ETSI deliver repository.
Users should be aware that the present document may be revised or have its status changed,
this information is available in the Milestones listing.
If you find errors in the present document, please send your comments to
the relevant service listed under Committee Support Staff.
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure (CVD) program.
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2025.
All rights reserved.
ETSI
3 ETSI ES 202 336-12 V1.3.1 (2025-09)
Contents
Intellectual Property Rights . 4
Foreword . 4
Executive summary . 5
Modal verbs terminology . 5
Introduction . 5
1 Scope . 6
2 References . 6
2.1 Normative references . 6
2.2 Informative references . 7
3 Definition of terms, symbols and abbreviations . 8
3.1 Terms . 8
3.2 Symbols . 10
3.3 Abbreviations . 10
4 ICT power, energy and environmental parameters monitoring system . 11
4.1 General description. 11
4.2 Complementarity to existing site power and air-conditioning measurements . 13
4.3 Different site cases . 13
4.3.1 Simple site case . 13
4.3.2 Complex site case . 14
4.4 Measurement and monitoring description . 15
4.4.0 General description . 15
4.4.1 Internal measurements type 1 (Built-in in ICT equipment) . 15
4.4.2 External measurements type 2 (external sensors) for ICT equipment . 16
4.4.3 Common requirements for external (type 2) and internal (type 1) measurement . 17
4.5 PEE data analysis services. 17
Annex A (normative): Summary of mandatory monitoring / supervision information and
f unctions . 19
A.0 General description of mandatory monitoring / supervision information and functions tables . 19
A.1 Table for ICT equipment power, energy and environmental parameters measurements . 20
Annex B (informative): Summary of non-mandatory monitoring / supervision information
and functions . 22
B.0 General description of non mandatory monitoring / supervision information and functions tables . 22
B.1 Table for ICT equipment power, energy and environmental parameters . 23
Annex C (informative): 3GPP NR Management reference model and generic management
service definitions . 25
Annex D (informative): Bibliography . 26
Annex E (informative): Change history . 27
History . 28
ETSI
4 ETSI ES 202 336-12 V1.3.1 (2025-09)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations
pertaining to these essential IPRs, if any, are publicly available for ETSI members and non-members, and can be
found in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to
ETSI in respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the
ETSI IPR online database.
Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs,
including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not
referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become,
essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its
Members. 3GPP™, LTE™ and 5G™ logo are trademarks of ETSI registered for the benefit of its Members and of the
3GPP Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of ®
the oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association.
Foreword
This ETSI Standard (ES) has been produced by ETSI Technical Committee Environmental Engineering (EE).
The present document is part 12 of a multi-part deliverable covering monitoring and control interface for infrastructure
equipment (power, cooling and building environment systems used in telecommunication networks), as identified
below:
Part 1: "Generic Interface";
Part 2: "DC power system control and monitoring information model";
Part 3: "AC UPS power system control and monitoring information model";
Part 4: "AC distribution power system control and monitoring information model";
Part 5: "AC diesel back-up generator system control and monitoring information model";
Part 6: "Air Conditioning System control and monitoring information model";
Part 7: "Other utilities system control and monitoring information model";
Part 8: "Remote Power Feeding System control and monitoring information model";
Part 9: "Alternative Power Systems";
Part 10: "AC inverter power system control and monitoring information model";
Part 11: "Battery system with integrated control and monitoring information model";
Part 12: "ICT equipment power, energy and environmental parameters monitoring information model".
ETSI
5 ETSI ES 202 336-12 V1.3.1 (2025-09)
Executive summary
The goal of the present document is to define the measurement of electrical power and energy consumption of ICT
equipment as well as environmental parameters (temperature, hygrometry) in order to improve energy monitoring and
to correlate the power consumption to equipment operation activity (telecom traffic, computation, etc.). It is also to
define the transfer protocol of this measurement data from site to network operation centre. Understanding power
consumption provides the opportunity to reduce energy consumption of equipment and/or the network. Granularity,
measurement period and accuracies are defined to meet these targets. They may depend on equipment types and
location in the different segments of a network (customer termination, access, core, data-centre, etc.). In addition, these
measurements can be used to improve engineering and operation including more accurate dimensioning of power
systems, network evolution modelling and prevision, audit on field, etc.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be in
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.