Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High availability Seamless Redundancy (HSR)

IEC 62439-3:2010(E) is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology. It specifies two redundancy protocols based on the duplication of the LAN, respectively duplication of the transmitted information, designed to provide seamless recovery in case of single failure of an inter-switch link or switch in the network. It cancels and replaces IEC 62439 published in 2008 and constitutes a technical revision. It includes the following significant technical changes with respect to IEC 62439 (2008): -adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q), - adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP (Distributed Redundancy Protocol), - moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy, availability calculation) to IEC 62439-1, which serves now as a base for the other documents, - moving Clause 5 (MRP) to IEC 62439-2 with minor editorial changes, -

Industrielle Kommunikationsnetze - Hochverfügbare Automatisierungsnetze - Teil 3: Parallelredundanz-Protokoll (PRP) und nahtloser Hochverfügbarkeits-Ring (HSR)

Réseaux de communication industrielle - Réseaux d’automatisme à haute disponibilité - Partie 3 : Protocole de redondance parallèle (PRP) et redondance transparente de haute disponibilité (HSR)

Industrijska komunikacijska omrežja za avtomatizacijo z visoko razpoložljivostjo - 3. del: Protokol vzporedne redundance (RPR) in brezprehodna zanka z visoko razpoložljivostjo (HSR) (IEC 62439-3:2010)

Serija IEC 62439 velja za omrežja za avtomatizacijo z visoko razpoložljivostjo, osnovana na ISO/IEC 8802-3 (IEEE 802.3) (eternet) tehnologiji. Ta del serije IEC 62439 določa dva redundantna protokola, osnovana na podvajanju LAN in podvajanje oddanih informacij v tem zaporedju, ki sta načrtovana tako,da zagotavljata neprehodno okrevanjem v primeru posameznega izpada povezave inter-stikala ali stikala v omrežju.

General Information

Status
Withdrawn
Publication Date
18-Mar-2010
Withdrawal Date
28-Feb-2013
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
09-Aug-2015
Completion Date
09-Aug-2015

Relations

Buy Standard

Standard
EN 62439-3:2010
English language
62 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-maj-2010
1DGRPHãþD
SIST EN 62439:2008
Industrijska komunikacijska omrežja za avtomatizacijo z visoko razpoložljivostjo -
3. del: Protokol vzporedne redundance (RPR) in brezprehodna zanka z visoko
razpoložljivostjo (HSR) (IEC 62439-3:2010)
Industrial communication networks - High availability automation networks - Part 3:
Parallel Redundancy Protocol (PRP) and High availability Seamless Redundancy (HSR)
(IEC 62439-3:2010)
Industrielle Kommunikationsnetze: Hochverfügbare Automatisierungsnetze - Teil 3:
Parallelredundanz-Protokoll (PRP) und nahtloser Hochverfügbarkeits-Ring (HSR) (IEC
62439-3:2010)
Réseaux de communication industrielle – Réseaux d’automatisme à haute disponibilité –
Partie 3 : Protocole de redondance parallèle (PRP) et redondance transparente de haute
disponibilité (HSR) (CEI 62439-3:2010)
Ta slovenski standard je istoveten z: EN 62439-3:2010
ICS:
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
35.110 Omreževanje Networking
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 62439-3
NORME EUROPÉENNE
March 2010
EUROPÄISCHE NORM
ICS 25.040; 35.040 Supersedes EN 62439:2008 (partially)

English version
Industrial communication networks -
High availability automation networks -
Part 3: Parallel Redundancy Protocol (PRP) and High availability Seamless
Redundancy (HSR)
(IEC 62439-3:2010)
Réseaux de communication industrielle - Industrielle Kommunikationsnetze:
Réseaux d’automatisme à haute Hochverfügbare Automatisierungsnetze -
disponibilité - Teil 3: Parallelredundanz-Protokoll (PRP)
Partie 3 : Protocole de redondance und nahtloser Hochverfügbarkeits-Ring
parallèle (PRP) et redondance (HSR)
transparente de haute disponibilité (HSR) (IEC 62439-3:2010)
(CEI 62439-3:2010)
This European Standard was approved by CENELEC on 2010-03-01. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Central Secretariat: Avenue Marnix 17, B - 1000 Brussels

© 2010 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 62439-3:2010 E
Foreword
The text of document 65C/583/FDIS, future edition 1 of IEC 62439-3, prepared by SC 65C, Industrial
networks, of IEC TC 65, Industrial-process measurement, control and automation, was submitted to the
IEC-CENELEC parallel vote and was approved by CENELEC as EN 62439-3 on 2010-03-01.
This EN 62439-3 together with EN 62439-1, EN 62439-2, EN 62439-4, EN 62439-5 and EN 62439-6
supersedes EN 62439:2008.
– adding a calculation method for RSTP (rapid spanning tree protocol, IEEE 802.1Q),
– adding two new redundancy protocols: HSR (High-availability Seamless Redundancy) and DRP
(Distributed Redundancy Protocol),
– moving former Clauses 1 to 4 (introduction, definitions, general aspects) and the Annexes (taxonomy,
availability calculation) to EN 62439-1, which serves now as a base for the other documents,
– moving Clause 5 (MRP) to EN 62439-2 with minor editorial changes,
– moving Clause 6 (PRP) was to EN 62439-3 with minor editorial changes,
– moving Clause 7 (CRP) was to EN 62439-4 with minor editorial changes, and
– moving Clause 8 (BRP) was to EN 62439-5 with minor editorial changes,
– adding a method to calculate the maximum recovery time of RSTP in a restricted configuration (ring)
to EN 62439-1 as Clause 8,
– adding specifications of the HSR (High-availability Seamless Redundancy) protocol, which shares the
principles of PRP to EN 62439-3 as Clause 5, and
– introducing the DRP protocol as EN 62439-6.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CEN and CENELEC shall not be held responsible for identifying any or all such patent
rights.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2010-12-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2013-03-01
Annex ZA has been added by CENELEC.
__________
- 3 - EN 62439-3:2010
Endorsement notice
The text of the International Standard IEC 62439-3:2010 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:
IEC 62439 series NOTE  Harmonized in EN 62439 series (not modified).
IEC 62439-2 NOTE  Harmonized as EN 62439-2.
IEC 62439-4 NOTE  Harmonized as EN 62439-4.
IEC 62439-5 NOTE  Harmonized as EN 62439-5.
IEC 62439-6 NOTE  Harmonized as EN 62439-6.
__________
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year

IEC 60050-191 1990 International Electrotechnical Vocabulary - -
(IEV) - Chapter 191: Dependability and quality
of service
IEC 62439-1 2010 Industrial communication networks - High EN 62439-1 2010
availability automation networks -
Part 1: General concepts and calculation
methods
ISO/IEC 8802-3 2000 Information technology - Telecommunications - -
and information exchange between systems -
Local and metropolitan area networks -
Specific requirements -
Part 3: Carrier sense multiple access with
collision detection (CSMA/CD) access method
and physical layer specifications

IEEE 802.1D 2004 IEEE Standard for Local and Metropoitan - -
Area Networks - Media Access Control (MAC)
Bridges
IEEE 802.1Q - IEEE Standard for Local and Metropolitan - -
Area Networks - Virtual Bridged Local Area
Networks
IEC 62439-3 ®
Edition 1.0 2010-02
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – High availability automation networks –
Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless
Redundancy (HSR)
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
PRICE CODE
XA
ICS 25.040, 35.040 ISBN 2-8318-1081-3
– 2 – 62439-3 © IEC:2010(E)
CONTENTS
FOREWORD.5
INTRODUCTION.7
1 Scope.8
2 Normative references .8
3 Terms, definitions, abbreviations, acronyms, and conventions.8
3.1 Terms and definitions .8
3.2 Abbreviations and acronyms.9
3.3 Conventions .9
4 Parallel Redundancy Protocol (PRP) .9
4.1 PRP principle of operation.9
4.1.1 PRP network topology .9
4.1.2 PRP LANs with linear or bus topology .10
4.1.3 PRP LANs with ring topology.11
4.1.4 DANP node structure.11
4.1.5 PRP attachment of singly attached nodes.12
4.1.6 Compatibility between singly and doubly attached nodes.12
4.1.7 Network management.12
4.1.8 Implication on configuration .13
4.1.9 Transition to non-redundant networks.13
4.1.10 Duplicate handling.14
4.1.11 Configuration check.18
4.1.12 Network supervision .18
4.1.13 Redundancy management interface.19
4.2 PRP protocol specifications.19
4.2.1 Installation, configuration and repair guidelines .19
4.2.2 MAC addresses .20
4.2.3 Multicast MAC addresses .20
4.2.4 IP addresses .20
4.2.5 Nodes.20
4.2.6 Duplicate accept mode .21
4.2.7 Duplicate discard mode .21
4.3 PRP service specification .27
4.3.1 Arguments .27
4.3.2 NodesTable .28
4.3.3 PRP write .29
4.3.4 PRP read.30
5 High-availability Seamless Redundancy (HSR) .31
5.1 HSR objectives.31
5.2 HSR principle of operation.31
5.2.1 Basic operation with a ring topology .31
5.2.2 DANH node structure.33
5.2.3 Topology .34
5.2.4 RedBox structure.40
5.3 HSR node specifications .42
5.3.1 Host sequence number.42
5.3.2 DANH receiving from its link layer interface .42

62439-3 © IEC:2010(E) – 3 –
5.3.3 DANH receiving from an HSR port .42
5.3.4 DANH forwarding rules .43
5.3.5 CoS .44
5.3.6 Clock synchronization.44
5.3.7 Deterministic medium access .44
5.4 HSR RedBox specifications .44
5.4.1 RedBox properties.44
5.4.2 RedBox receiving from interlink .45
5.4.3 RedBox forwarding on the ring.46
5.4.4 RedBox receiving from
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.