Electrical safety in low voltage distribution systems up to 1 000 V a.c and 1 500 V d.c - Equipment for testing, measuring or monitoring of protective measures - Part 14: Equipment for testing the safety of electrical equipment for machinery

2021-06-30: Link to EMCD was added following the TC decision during the pleanry meeting 8 June 2021

Elektrische Sicherheit in Niederspannungsnetzen bis AC 1 000 V und DC 1 500 V – Geräte zum Prüfen, Messen oder Überwachen von Schutzmaßnahmen – Teil 14: Geräte zum Prüfen der Sicherheit der elektrischen Ausrüstung von Maschinen

Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1 500 V c.c. - Dispositifs de contrôle, de mesure ou de surveillance de mesures de protection - Partie 14: Dispositifs de contrôle de la sécurité des appareils électriques sur machines

Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične napetosti do 1 000 kV in enosmerne napetosti do 1 500 kV - Oprema za preskušanje, merjenje ali nadzorovanje zaščitnih ukrepov - 14. del: Oprema za preskušanje varnosti električne opreme strojev

General Information

Status
Not Published
Public Enquiry End Date
30-Jul-2022
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
07-Jun-2022
Due Date
25-Oct-2022
Completion Date
29-Jul-2022

Relations

Buy Standard

Draft
oSIST prEN IEC 61557-14:2022
English language
16 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
oSIST prEN IEC 61557-14:2022
01-julij-2022

Električna varnost v nizkonapetostnih razdelilnih sistemih za izmenične napetosti

do 1 000 kV in enosmerne napetosti do 1 500 kV - Oprema za preskušanje,
merjenje ali nadzorovanje zaščitnih ukrepov - 14. del: Oprema za preskušanje
varnosti električne opreme strojev

Electrical safety in low voltage distribution systems up to 1 000 V a.c and 1 500 V d.c -

Equipment for testing, measuring or monitoring of protective measures - Part 14:
Equipment for testing the safety of electrical equipment for machinery

Sécurité électrique dans les réseaux de distribution basse tension de 1 000 V c.a. et 1

500 V c.c. - Dispositifs de contrôle, de mesure ou de surveillance de mesures de

protection - Partie 14: Dispositifs de contrôle de la sécurité des appareils électriques sur

machines
Ta slovenski standard je istoveten z: prEN IEC 61557-14:2022
ICS:
17.220.20 Merjenje električnih in Measurement of electrical
magnetnih veličin and magnetic quantities
29.080.01 Električna izolacija na Electrical insulation in
splošno general
29.240.01 Omrežja za prenos in Power transmission and
distribucijo električne energije distribution networks in
na splošno general
oSIST prEN IEC 61557-14:2022 en,fr,de

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN IEC 61557-14:2022
---------------------- Page: 2 ----------------------
oSIST prEN IEC 61557-14:2022
85/830/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61557-14 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2022-06-03 2022-08-26
SUPERSEDES DOCUMENTS:
85/779/CD, 85/801A/CC
IEC TC 85 : MEASURING EQUIPMENT FOR ELECTRICAL AND ELECTROMAGNETIC QUANTITIES
SECRETARIAT: SECRETARY:
China Ms Guiju HAN
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:
TC 44,TC 66
Other TC/SCs are requested to indicate their interest, if
any, in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY

SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING

Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.

This document is still under study and subject to change. It should not be used for reference purposes.

Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of

which they are aware and to provide supporting documentation.
TITLE:

Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC -

Equipment for testing, measuring or monitoring of protective measures - Part 14: Equipment

for testing the safety of electrical equipment of machinery
PROPOSED STABILITY DATE: 2028
NOTE FROM TC/SC OFFICERS:

Copyright © 2022 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this

electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.

You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without

permission in writing from IEC.
---------------------- Page: 3 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 2 85/830/CDV
1 CONTENTS

3 FOREWORD ........................................................................................................................... 3

4 INTRODUCTION ..................................................................................................................... 5

5 1 Scope .............................................................................................................................. 6

6 2 Normative references ...................................................................................................... 6

7 3 Terms and definitions ...................................................................................................... 7

8 4 Requirements .................................................................................................................. 7

9 4.1 General requirements ............................................................................................. 7

10 4.2 Measuring functions ................................................................................................ 7

11 4.2.1 Required measuring functions ......................................................................... 7

12 4.2.2 Measurement of resistance of protective bonding ............................................ 7

13 4.2.3 Measurement of fault loop impedance ............................................................. 7

14 4.2.4 Measurement of insulation resistance .............................................................. 8

15 4.2.5 Testing of the effectiveness of protective measures with RCD ......................... 8

16 4.2.6 Voltage tests ................................................................................................... 8

17 4.2.7 Measurement of residual voltage ..................................................................... 9

18 4.2.8 Measurement of leakage current ...................................................................... 9

19 4.3 Construction requirements for testing equipment .................................................... 9

20 4.3.1 Overload capability .......................................................................................... 9

21 4.3.2 Sockets for service purposes ........................................................................... 9

22 4.3.3 Degree of protection ...................................................................................... 10

23 4.3.4 Overvoltage and measurement categories ..................................................... 10

24 4.4 Accessories .......................................................................................................... 10

25 5 Markings and operating instructions .............................................................................. 10

26 5.1 Markings ............................................................................................................... 10

27 5.2 Operating instructions ........................................................................................... 10

28 6 Tests ............................................................................................................................. 11

29 6.1 General ................................................................................................................. 11

30 6.2 Operating uncertainty............................................................................................ 11

31 6.3 Tests of measuring equipment according to measuring functions .......................... 12

32 6.4 Test of construction requirements of test equipment ............................................. 12

33 Bibliography .......................................................................................................................... 16

35 Table 1 – Test voltages........................................................................................................... 8

36 Table 2 – Calculation of operating uncertainty ...................................................................... 12

37 Table 3 – Compliance tests of measuring equipment according to measuring function .......... 14

38 Table 4 – Test of construction requirements of test equipment .............................................. 14

---------------------- Page: 4 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 3 85/830/CDV
42 INTERNATIONAL ELECTROTECHNICAL COMMISSION
43 ____________
45 ELECTRICAL SAFETY IN LOW VOLTAGE DISTRIBUTION SYSTEMS UP TO
46 1 000 V AC AND 1 500 V DC - EQUIPMENT FOR TESTING, MEASURING OR
47 MONITORING OF PROTECTIVE MEASURES
49 Part 14: Equipment for testing the safety of electrical equipment of
50 machinery
53 FOREWORD

54 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising

55 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international

56 co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and

57 in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,

58 Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their

59 preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with

60 may participate in this preparatory work. International, governmental and non-governmental organizations liaising

61 with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for

62 Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.

63 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international

64 consensus of opinion on the relevant subjects since each technical committee has representation from all

65 interested IEC National Committees.

66 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National

67 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC

68 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any

69 misinterpretation by any end user.

70 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications

71 transparently to the maximum extent possible in their national and regional publications. Any divergence between

72 any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.

73 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity

74 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any

75 services carried out by independent certification bodies.

76 6) All users should ensure that they have the latest edition of this publication.

77 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and

78 members of its technical committees and IEC National Committees for any personal injury, property damage or

79 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and

80 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC

81 Publications.

82 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is

83 indispensable for the correct application of this publication.

84 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent

85 rights. IEC shall not be held responsible for identifying any or all such patent rights.

86 International Standard IEC 1557-14 has been prepared by WG8: Measuring and monitoring

87 equipment for testing protective devices in energy distribution systems, of IEC technical

88 committee TC85: Measuring equipment for electrical and electromagnetic quantities.

89 This second edition cancels and replaces the first edition published in 2013. This edition

90 constitutes a technical revision.

91 This edition includes the following significant technical changes with respect to the previous

92 edition:
93 a) Clarifying the introduction;
94 a) Replaced ‘dielectric strength’ by ‘voltage test’;
95 b) Requirement for maximum output current has been added in 4.2.6.1
---------------------- Page: 5 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 4 85/830/CDV

96 c) Tripping time at electrical switching activated by two-hand operation has been added in

97 4.2.6.1

98 d) Additional time limiting capability for the protection against electric shock for test persons

99 and bystanders in 4.2.6.2
100 e) Updated references for safety testing;
101 f) Alignment of the structure with that of the whole IEC 61557 series.
102 The text of this International Standard is based on the following documents:
FDIS Report on voting
XX/XX/FDIS XX/XX/RVD
103

104 Full information on the voting for the approval of this International Standard can be found in the

105 report on voting indicated in the above table.

106 This document has been drafted in accordance with the ISO/IEC Directives, Part 2.

107 This International Standard is to be used in conjunction with IEC 61557-1:2019

108 A list of all parts in the IEC 61557 series, published under the general title ELECTRICAL

109 SAFETY IN LOW VOLTAGE DISTRIBUTION SYSTEMS UP TO 1 000 V AC AND 1 500 V DC –
110 EQUIPMENT FOR TESTING, MEASURING OR MONITORING OF PROTECTIVE MEASURES,
111 can be found on the IEC website

112 The committee has decided that the contents of this document will remain unchanged until the

113 stability date indicated on the IEC website under "http://webstore.iec.ch" in the data related to

114 the specific document. At this date, the document will be
115 • reconfirmed,
116 • withdrawn,
117 • replaced by a revised edition, or
118 • amended.
119
---------------------- Page: 6 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 5 85/830/CDV
120 INTRODUCTION

121 This standard defines particular requirements for test and measurement equipment used to

122 determine the electrical safety of electrical equipment of machinery. IEC 61010, other parts of

123 the IEC 61557 series and IEC 60204 do not cover all safety aspects of equipment used for

124 testing electrical equipment of machinery in accordance with the test sequence of IEC 60204-1.

125 This part of IEC 61557 provides additional measures to reduce the risk of electric shock for the

126 test persons and bystanders during voltage tests in the field. The standard also defines

127 performance requirements for each test and measurement function to ensure reliable and

128 comparable results.
---------------------- Page: 7 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 6 85/830/CDV
129 ELECTRICAL SAFETY IN LOW VOLTAGE DISTRIBUTION SYSTEMS UP TO
130 1 000 V AC AND 1 500 V DC – EQUIPMENT FOR TESTING, MEASURING OR
131 MONITORING OF PROTECTIVE MEASURES -
132
133 Part 14: Equipment for testing the safety of electrical equipment of
134 machinery
135
136
137
138 1 Scope

139 This part of IEC 61557 defines special requirements for test and measurement equipment used

140 to determine the electrical safety of electrical equipment of machinery in accordance with

141 IEC 60204-1.
142 2 Normative references

143 The following documents are referred to in the text in such a way that some or all of their content

144 constitutes requirements of this document. For dated references, only the edition cited applies.

145 For undated references, the latest edition of the referenced document (including any

146 amendments) applies.

147 IEC 60204-1, Safety of machinery – Electrical equipment of machines – Part 1: General

148 requirements
149 IEC 60529, Degrees of protection provided by enclosures (IP Code)

150 IEC 61000-4-8, Electromagnetic compatibility – Part 4-8: Testing and measurement techniques

151 – Power frequency magnetic field immunity test

152 IEC 61010-2-034, Safety requirements for electrical equipment for measurement, control, and

153 laboratory use – Part 2-034: Particular requirements for measurement equipment for

154 insulation resistance and test equipment for electric strength

155 IEC 61557-1:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

156 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 1:

157 General requirements

158 IEC 61557-2:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

159 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 2:

160 Insulation resistance

161 IEC 61557-3:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

162 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 3:

163 Loop impedance

164 IEC 61557-4:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

165 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 4:

166 Resistance of earth connection and equipotential bonding

167 IEC 61557-6:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

168 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 6:

169 Effectiveness of residual current devices (RCD) in TT, TN and IT systems

170 IEC 61557-10:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and

171 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 10:

172 Combined measuring equipment for testing, measuring and monitoring of protective measures

---------------------- Page: 8 ----------------------
oSIST prEN IEC 61557-14:2022
IEC CDV 61557-14  IEC: 2022 7 85/830/CDV

173 IEC 61557-13:2011, Electrical safety in low voltage distribution systems up to 1 000 V AC and

174 1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part 13:

175 Hand-held and hand-manipulated current clamps and sensors for measurement of leakage

176 currents in electrical distribution systems
177 3 Terms and definitions

178 For the purposes of this document, the terms and definitions given in IEC 61557-1, IEC 61557-2,

179 IEC 61557-3, IEC 61557-4, IEC 61557-6, IEC 61557-10 and IEC 61557-13 apply.

180 ISO and IEC maintain terminological databases for use in standardization at the following

181 addresses:
182 • IEC Electropedia: available at http://www.electropedia.org/
183 • ISO Online browsing platform: available at http://www.iso.org/obp
184 4 Requirements
185 4.1 General requirements

186 In addition to the requirements of IEC 61557-1:2019, Clause 4, the following requirements shall

187 apply.
188 4.2 Measuring functions
189 4.
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.