Polymer modified bituminous thick coatings for waterproofing - Definitions and requirements

This European Standard specifies the definitions and requirements of prefabricated polymer modified bituminous thick coatings used for the waterproofing of below ground structures. It applies to both one-component and two-component products. These products can be used with or without inlay. This European Standard does not apply to products that are to be used for roof waterproofing.

Kunststoffmodifizierte Bitumendickbeschichtungen zur Bauwerksabdichtung - Begriffe und Anforderungen

Revêtements bitumineux épais modifiés aux polymères pour imperméabilisation - Définitions et exigences

Bitumenske debeloslojne prevleke, modificirane s polimeri - Definicije in zahteve

General Information

Status
Not Published
Public Enquiry End Date
04-Sep-2014
Technical Committee
Current Stage
98 - Abandoned project (Adopted Project)
Start Date
20-Feb-2015
Due Date
25-Feb-2015
Completion Date
20-Feb-2015

Relations

Buy Standard

Draft
EN 15814:2011/kFprA2:2014
English language
21 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 15814:2011/kFprA2:2014
01-september-2014
Bitumenske debeloslojne prevleke, modificirane s polimeri - Definicije in zahteve
Polymer modified bituminous thick coatings for waterproofing - Definitions and
requirements
Kunststoffmodifizierte Bitumendickbeschichtungen zur Bauwerksabdichtung - Begriffe
und Anforderungen
Revêtements bitumineux épais modifiés aux polymères pour imperméabilisation -
Définitions et exigences
Ta slovenski standard je istoveten z: EN 15814:2011/FprA2
ICS:
91.100.50 Veziva. Tesnilni materiali Binders. Sealing materials
SIST EN 15814:2011/kFprA2:2014 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 15814:2011/kFprA2:2014

---------------------- Page: 2 ----------------------

SIST EN 15814:2011/kFprA2:2014

EUROPEAN STANDARD
FINAL DRAFT
EN 15814:2011+A1:2012
NORME EUROPÉENNE

EUROPÄISCHE NORM
FprA2
June 2014
ICS 91.100.50
English Version
Polymer modified bituminous thick coatings for waterproofing -
Definitions and requirements
Revêtements bitumineux épais modifiés aux polymères Kunststoffmodifizierte Bitumendickbeschichtungen zur
pour imperméabilisation - Définitions et exigences Bauwerksabdichtung - Begriffe und Anforderungen
This draft amendment is submitted to CEN members for unique acceptance procedure. It has been drawn up by the Technical Committee
CEN/TC 361.

This draft amendment A2, if approved, will modify the European Standard EN 15814:2011+A1:2012. If this draft becomes an amendment,
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for inclusion of this
amendment into the relevant national standard without any alteration.

This draft amendment was established by CEN in three official versions (English, French, German). A version in any other language made
by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has
the same status as the official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania,
Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United
Kingdom.

Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are aware and to
provide supporting documentation.

Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without notice and
shall not be referred to as a European Standard.


EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION

EUROPÄISCHES KOMITEE FÜR NORMUNG

CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2014 CEN All rights of exploitation in any form and by any means reserved Ref. No. EN 15814:2011/FprA2:2014 E
worldwide for CEN national Members.

---------------------- Page: 3 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
Contents Page
Foreword .3
1 Modification to Clause 2 .4
2 Modification to Clause 4 .4
3 Modification to Clause 4, Table 1, line 3, column 2 .4
4 Modification to Clause 5 .4
5 Assessment and verification of the constancy of performance – AVCP .4
5.1 General .4
5.2 Type testing .4
5.2.1 General .4
5.2.2 Test reports .5
5.3 Factory production control (FPC) .5
5.3.1 General .5
5.3.2 Requirements .6
5.3.3 Product specific requirements .9
5.3.4 Initial inspection of factory and of FPC .9
5.3.5 Continuous surveillance of FPC . 10
5.3.6 Procedure for modifications . 10
6 Modification to Annex ZA . 10
Annex ZA (informative) Clauses of this European Standard addressing provisions of the
EU Construction Products Regulation (CPR) . 11
ZA.1 Scope and relevant characteristics . 11
ZA.2 Procedures for AVCP of the PMBC . 12
ZA.2.1 Systems of AVCP . 12
ZA.2.2 Declaration of performance (DoP) . 15
ZA.3 CE marking and labelling . 19
7 Addition of a Bibliography . 20

2

---------------------- Page: 4 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
Foreword
This document (EN 15814:2011/FprA2:2014) has been prepared by Technical Committee CEN/TC 361
"Project Committee - Polymer modified bituminous thick coatings for waterproofing - Definitions/requirements
and test methods", the secretariat of which is held by DIN.
This document is currently submitted to the Unique Acceptance Procedure.
This document has been prepared under a mandate given to CEN by the European Commission and the
European Free Trade Association, and supports essential requirements of EU Directive(s).
For relationship with EU Directive(s), see informative Annex ZA, which is an integral part of this document.
Note: Due to fact that the Framework Partnership Agreement between the Commission and CEN & CENELEC
is not signed yet, there are currently no New Approach Consultants in place for 2014. Therefore the provisions
of CEN-CENELEC Guide 15 cannot be met.
This shall not prevent the processing of draft standards nor the offering of harmonized standards to the
Commission. In particular, draft standards can be sent to vote without Consultant assessment.
This note will be removed from the Foreword of the finalized publication.

3

---------------------- Page: 5 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
1 Modification to Clause 2
Replace "ISO 1183-1:2004" with "EN ISO 1183-1".
Delete the reference to "EN ISO 2811-2".
2 Modification to Clause 4
Under Clause 4 "Requirements" add a new headline for sub-clause "4.1 General".
Add a new sub-clause "4.2 Dangerous substances" with the following text:
"National regulations on dangerous substances may require verification and declaration on release, and
sometimes content, when construction products covered by this standard are placed on those markets. In the
absence of European harmonised test methods, verification and declaration on release/content should be
done taking into account national provisions in the place of use.
NOTE An informative database covering European and national provisions on dangerous substances is available at the
Construction web site on EUROPA accessed through: http://ec.europa.eu/enterprise/construction/cpd-ds/."
3 Modification to Clause 4, Table 1, line 3, column 2
Replace "No changes to the material according to EN 15817," by a third requirement "3. No changes to the
material".
4 Modification to Clause 5
Replace the entire Clause 5 with the following.
"
5 Assessment and verification of the constancy of performance – AVCP
5.1 General
The compliance of PMBC with the requirements of this standard and with the declared values (including
classes) shall be demonstrated by:
 determination of the product type;
 factory production control by the manufacturer, including product assessment.
The manufacturer shall always retain the overall control and shall have the necessary means to take
responsibility for the conformity of the product with its declared performance(s).
NOTE The assignment of tasks to the notified bodies and the manufacturer is shown in Table ZA.3.
5.2 Type testing
5.2.1 General
All performances related to characteristics included in this standard shall be determined when the
manufacturer intends to declare the respective performances unless the standard gives provisions for
declaring them without performing tests (e.g. use of previously existing data, CWFT and conventionally
accepted performance).
Assessment previously performed in accordance with the provisions of this standard, may be taken into
account provided that they were made to the same or a more rigorous test method, under the same AVCP
4

---------------------- Page: 6 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
system on the same product or products of similar design, construction and functionality, such that the results
are applicable to the product in question.
NOTE Same AVCP system means testing by an independent third party [only for products covered by
system 1+, 1 and 3], under the responsibility of a notified product certification body.
For the purposes of assessment, the manufacturer's products may be grouped into families, where it is
considered that the results for one or more characteristics from any one product within the family are
representative for those same characteristics for all products within that same family.
Products may be grouped in different families for different characteristics.
Reference to the assessment method standards should be made to allow the selection of a suitable
representative sample.
In addition, the determination of the product type shall be performed for all characteristics included in the
standard for which the manufacturer declares the performance:
 at the beginning of the production of a new or modified PMBC (unless a member of the same product
range), or
 at the beginning of a new or modified method of production (where this may affect the stated
properties); or
they shall be repeated for the appropriate characteristic(s), whenever a change occurs in the PMBC design, in
the raw material or in the supplier of the components, or in the method of production (subject to the definition
of a family), which would affect significantly one or more of the characteristics.
Where components are used whose characteristics have already been determined, by the component
manufacturer, on the basis of assessment methods of other product standards, these characteristics need not
be re-assessed. The specifications of these components shall be documented.
Products bearing regulatory marking in accordance with appropriate harmonized European specifications may
be presumed to have the performances declared in the DoP, although this does not replace the responsibility
on the PMBC manufacturer to ensure that the PMBC as a whole is correctly manufactured and its component
products have the declared performance values.
5.2.2 Test reports
The results of the determination of the product type shall be documented in test reports. All test reports shall
be retained by the manufacturer for at least 10 years after the last date of production of the PMBC to which
they relate.
5.3 Factory production control (FPC)
5.3.1 General
The manufacturer shall establish, document and maintain an FPC system to ensure that the products placed
on the market comply with the declared performance of the characteristics.
The FPC system shall consist of procedures, regular inspections and tests and/or assessments and the use of
the results to control raw and other incoming materials or components, equipment, the production process and
the product. All the elements, requirements and provisions adopted by the manufacturer shall be documented
in a systematic manner in the form of written policies and procedures.
This factory production control system documentation shall ensure a common understanding of the evaluation
of the constancy of performance and enable the achievement of the required product performances and the
effective operation of the production control system to be checked. Factory production control therefore brings
5

---------------------- Page: 7 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
together operational techniques and all measures allowing maintenance and control of the compliance of the
product with the declared performances of the essential characteristics.
5.3.2 Requirements
5.3.2.1 General
The manufacturer is responsible for organizing the effective implementation of the FPC system. Tasks and
responsibilities in the production control organization shall be documented and this documentation shall be
kept up-to-date.
The responsibility, authority and the relationship between personnel that manages, performs or verifies work
affecting product constancy, shall be defined. This applies in particular to personnel that need to initiate
actions preventing product non-constancies from occurring, actions in case of non-constancies and to identify
and register product constancy problems.
Personnel performing work affecting the constancy of performance of the product shall be competent on the
basis of appropriate education, training, skills and experience for which records shall be maintained.
In each factory the manufacturer may delegate the action to a person having the necessary authority to:
 identify procedures to demonstrate conformity of the product at appropriate stages;
 identify and record any instance of non-conformity;
 identify procedures to correct instances of non-conformity.
The manufacturer shall draw up and keep up-to-date documents defining the factory production control. The
manufacturer's documentation and procedures should be appropriate to the product and manufacturing
process. The FPC system should achieve an appropriate level of confidence in the conformity of the product.
This involves:
a) the preparation of documented procedures and instructions relating to factory production control
operations, in accordance with the requirements of the technical specification to which reference is made;
b) the effective implementation of these procedures and instructions;
c) the recording of these operations and their results;
d) the use of these results to correct any deviations, repair the effects of such deviations, treat any resulting
instances of non-conformity and, if necessary, revise the FPC to rectify the cause of non-conformity.
Where subcontracting takes place, the manufacturer shall retain the overall control of the product and ensure
that he receives all the information that is necessary to fulfill his responsibilities according to this European
Standard.
If the manufacturer has part of the product designed, manufactured, assembled, packed, processed and/or
labelled by subcontracting, the FPC of the subcontractor may be taken into account, where appropriate for the
product in question.
The manufacturer who subcontracts all of his activities may in no circumstances pass these responsibilities on
to a subcontractor.
NOTE - Manufacturers having an FPC system, which complies with EN ISO 9001 standard and which
addresses the provisions of the present European standard are considered as satisfying the FPC
requirements of the Regulation (EU) No 305/2011.
6

---------------------- Page: 8 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
5.3.2.2 Equipment
5.3.2.2.1 Testing
All weighing, measuring and testing equipment shall be calibrated and regularly inspected according to
documented procedures, frequencies and criteria.
5.3.2.2.2 Manufacturing
All equipment used in the manufacturing process shall be regularly inspected and maintained to ensure use,
wear or failure does not cause inconsistency in the manufacturing process. Inspections and maintenance shall
be carried out and recorded in accordance with the manufacturer’s written procedures and the records
retained for the period defined in the manufacturer's FPC procedures.
5.3.2.3 Raw materials and components
The specifications of all incoming raw materials and components shall be documented, as shall the inspection
scheme for ensuring their compliance. In case supplied kit components are used, the attestation of conformity
level of the component shall be that given in the appropriate harmonised technical specification for that
component.
5.3.2.4 Controls during manufacturing process
The manufacturer shall plan and carry out production under controlled conditions.
5.3.2.5 Product testing and evaluation
The manufacturer shall establish procedures to ensure that the stated values of the characteristics he
declares are maintained. The characteristics, and the means of control, are given in Table 2.
7

---------------------- Page: 9 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
Table 2 — Factory Production Control
Production control
Characteristic Test method Tolerances
frequency
Flexibility at low temperature EN 15813 Weekly or per batch According to
EN 15813
Dimensional stability at high EN 15818 Weekly or per batch According to
temperature EN 15818
For the A-component
— Solids content EN ISO 3251 Weekly or per batch
± 4 % absolute
— Ash content (only for EN ISO 3451-1 with Weekly or per batch
± 2 % absolute
products with ash content testing at a temperature
≥ 5 mass %) of (475 ± 25) °C
For the B-component (only for
two component PMBC)
3
— Bulk density (for powder EN ISO 3923-1 or Weekly or per batch
± 0,1 g/cm
component) EN 459-2:2010, 5.4
3
— Density (for liquid EN ISO 2811-1 Weekly or per batch
± 0,1 g/cm
component)
For the cured PMBC
3
— Density EN ISO 1183-1, method Weekly or per batch
± 0,1 g/cm
A
Identification for inlays:
— Type To be stated. Depending
on the type of inlay, a
— Mass per unit area -----
suitable test has to be At incoming products
— Strength and elongation at
applied at incoming
break
products.

For the purpose of the Factory Production Control alternative tests to those given in Table 2 may be used,
provided that a correlation of the results between both tests, for the product in question, is established. The
use of alternative tests shall be recorded and maintained.
5.3.2.6 Non-complying products
The manufacturer shall have written procedures which specify how non-complying products shall be dealt
with. Any such events shall be recorded as they occur and these records shall be kept for the period defined
in the manufacturer’s written procedures.
Where the product fails to satisfy the acceptance criteria, the provisions for non-complying products shall
apply, the necessary corrective action(s) shall immediately be taken and the products or batches not
complying shall be isolated and properly identified.
Once the fault has been corrected, the test or verification in question shall be repeated.
The results of controls and tests shall be properly recorded. The product description, date of manufacture, test
method adopted, test results and acceptance criteria shall be entered in the records under the signature of the
person responsible for the control/test.
With regard to any control result not meeting the requirements of this European Standard, the corrective
measures taken to rectify the situation (e.g. a further test carried out, modification of manufacturing process,
throwing away or putting right of product) shall be indicated in the records.
8

---------------------- Page: 10 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)

5.3.2.7 Corrective action
The manufacturer shall have documented procedures that instigate action to eliminate the cause of non-
conformities in order to prevent recurrence.
5.3.2.8 Handling, storage and packaging
The manufacturer shall have procedures providing methods of product handling and shall provide suitable
storage areas preventing damage or deterioration.
5.3.3 Product specific requirements
The FPC system shall address this European Standard and ensure that the products placed on the market
comply with the declaration of performance.
The FPC system shall include a product specific FPC, which identifies procedures to demonstrate compliance
of the product at appropriate stages, i.e.:
a) the controls and tests to be carried out prior to and/or during manufacture according to a frequency laid
down in the FPC test plan,
and/or
b) the verifications and tests to be carried out on finished products according to a frequency laid down in the
FPC test plan.
If the manufacturer uses only finished products, the operations under b) shall lead to an equivalent level of
compliance of the product as if FPC had been carried out during the production.
If the manufacturer carries out parts of the production himself, the operations under b) may be reduced and
partly replaced by operations under a). Generally, the more parts of the production that are carried out by the
manufacturer, the more operations under b) may be replaced by operations under a).
In any case the operation shall lead to an equivalent level of compliance of the product as if FPC had been
carried out during the production.
NOTE Depending on the specific case, it can be necessary to carry out the operations referred to under a) and b),
only the operations under a) or only those under b).
The operations under a) refer to the intermediate states of the product as on manufacturing machines and
their adjustment, and measuring equipment etc. These controls and tests and their frequency shall be chosen
based on product type and composition, the manufacturing process and its complexity, the sensitivity of
product features to variations in manufacturing parameters, etc.
The manufacturer shall establish and maintain records that provide evidence that the production has been
sampled and tested. These records shall show clearly whether the production has satisfied the defined
acceptance criteria and shall be available for at least ten years.
5.3.4 Initial inspection of factory and of FPC
Initial inspection of factory and of FPC shall be carried out when the production process has been finalized
and in operation. The factory and FPC documentation shall be assessed to verify that the requirements of
5.3.2 and 5.3.3 are fulfilled.
During the inspection it shall be verified:
a) that all resources necessary for the achievement of the product characteristics required by this European
Standard are in place and correctly implemented, and
9

---------------------- Page: 11 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
b) that the FPC-procedures in accordance with the FPC documentation are followed in practice, and
c) that the product complies with the Initial Type Testing/Type Testing samples, for which compliance with
this European Standard has been verified.
All locations where final assembly or at least final testing of the relevant product is performed, shall be
assessed to verify that the above conditions a) to c) are in place and implemented. If the FPC system covers
more than one product, production line or production process, and it is verified that the general requirements
are fulfilled when assessing one product, production line or production process, then the assessment of the
general requirements does not need to be repeated when assessing the FPC for another product, production
line or production process.
All assessments and their results shall be documented in the initial inspection report.
5.3.5 Continuous surveillance of FPC
Surveillance of the FPC shall be undertaken once per year. The surveillance of the FPC shall include a review
of the FPC test plan(s) and production processes(s) for each product to determine if any changes have been
made since the last assessment or surveillance. The significance of any changes shall be assessed.
Checks shall be made to ensure that the test plans are still correctly implemented and that the production
equipment is still correctly maintained and calibrated.
The records of tests and measurement made during the production process and to finished products shall be
reviewed to ensure that the values obtained still correspond with those values for the samples submitted to
the determination of the product type and that the correct actions have been taken for non-compliant products.
5.3.6 Procedure for modifications
If modifications are made to the product, production process or FPC system that could affect any of the
product characteristics required by this standard, then all the characteristics for which the manufacturer
declares performance, which may be affected by the modification, shall be subject to the determination of the
product type, as described in 5.2.1. Where relevant, a re-assessment of the factory and of the FPC system
shall be performed for those aspects, which may be affected by the modification.
All assessments and their results shall be documented in a report."
6 Modification to Annex ZA
Replace the entire Annex ZA with the following.
"
10

---------------------- Page: 12 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
Annex ZA
(informative)

Clauses of this European Standard addressing provisions of the
EU Construction Products Regulation (CPR)
ZA.1 Scope and relevant characteristics
This European Standard has been prepared under Mandate M/102 amended by M/126, M/130 and M/137
Flexible sheets for waterproofing given to CEN by the European Commission and the European Free Trade
Association.
If this European Standard is cited in the Official Journal of the European Union (OJEU), the clauses of this
standard, shown in this annex, are considered to meet the provisions of the relevant mandate, under the
Regulation (EU) No. 305/2011.
This annex deals with the CE-marking of the PMBC intended for the uses indicated in Table ZA.1 and shows
the relevant clauses applicable.
This annex has the same scope as in Clause 1 of this standard related to the aspects covered by the mandate
and is defined by Table ZA.1.
Table ZA.1 — Relevant clauses for PMBC and the intended use
Product: Polymer modified bituminous thick coatings (PMBC)
Intended use: For waterproofing in below ground structures
Subclauses in this and other
European Standard(s) Regulatory
Essential characteristics Notes
related to essential classes
characteristics
*) Technical Classes:
Watertightness  Clause 4, Table 1 (8) —
W1 to W2B
Technical Classes:
*)

Crack-bridging ability Clause 4, Table 1 (1) —
CB0 to CB2
*)

Water resistance Clause 4, Table 1 (3) — Threshold value

Flexibility at low temperature Clause 4, Table 1 (4) — Threshold value
Dimensional stability at high
Clause 4, Table 1 (5) — Threshold value
temperatures
Classes in
Reaction to fire Clause 4, Table 1 (7) accordance with —
EN 13501-1
*) Technical Classes:
Resistance to compression Clause 4, Table 1 (9) —
C0 to C2B
See relevant note in
Dangerous substances — —
ZA.1
Pass if tested and
Durability of watertightness is covered by essential
— classified
and reaction to fire characteristics marked with *)
accordingly
11

---------------------- Page: 13 ----------------------

SIST EN 15814:2011/kFprA2:2014
EN 15814:2011/FprA2:2014 (E)
The declaration of the product performance related to certain essential characteristics is not required in those
Member States
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.