Corrigendum 1 - Low-voltage electrical installations - Part 8-1: Functional aspects - Energy efficiency

General Information

Status
Published
Publication Date
19-May-2019
Current Stage
PPUB - Publication issued
Start Date
17-Jul-2019
Completion Date
20-May-2019
Ref Project

Relations

Buy Standard

Standard
IEC 60364-8-1:2019/COR1:2019 - Corrigendum 1 - Low-voltage electrical installations - Part 8-1: Functional aspects - Energy efficiency Released:5/20/2019
English language
5 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


 IEC 2019
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
IEC 60364-8-1
Edition 2.0  2019-02
LOW-VOLTAGE ELECTRICAL INSTALLATIONS –

Part 8-1: Functional aspects – Energy efficiency

CO RRI G E NDUM 1
2 Normative references
Replace the reference to IEC 61557-12:2007 with the following new reference:
IEC 61557-12, Electrical safety in low voltage distribution systems up to 1 000 V AC and
1 500 V DC – Equipment for testing, measuring or monitoring of protective measures – Part
12: Power metering and monitoring devices (PMD)

4.1.3 Design principles
Replace the first dashed list item with the following new item:
– load energy profile (active and reactive energy);

8.3.1.2 Requirements on accuracy and measuring range
Table 1
In the first row, second column, replace "IEC 62052-22" with "IEC 62053-22". In the second
and third rows, third column, replace "PMD-1", "PMD-2" and "PMD-3" with "PMD-I", "PMD-II"
and "PMD-III" respectively, as shown:
Measurement Applicable IEC Device name Usual device name Complementary
application product standards according to explanations
standards
Billing or IEC 62053-21 Electricity Revenue meter, Energy metering for billing
(Contractual) or IEC 62053-22 metering electricity meter, utility applications (e.g. utility
equipment meter invoicing a landlord or a
mall owner, sub-billing to
tenants)
a
Energy usage Power metering Power meter, energy Energy cost and usage
IEC 61557-12
analysis and monitoring meter analysis (for cost allocation
device or sub-billing within a
company or for energy
(PMD-I or
efficiency purposes)
PMD-II or
PMD-III)
b
Power monitoring Power metering Power meter, energy Demand side power quality
IEC 61557-12
and monitoring meter analysis and energy cost
device (PMD-II and usage analysis
or PMD-III)
IEC 60364-8-1:2019-02/COR1:2019-05(en)

– 2 – IEC 60364-8-1:2019/COR1:2019
 IEC 2019
Energy estimation Indicator or Energy estimator Devices for giving
sensor information needed to
correctly operate the
energy management
system, for example
running time of equipment,
number of operation, basic
measurement
a
Devices used for power quality monitoring, when they provide active energy measurement function, can be
used for energy usage analysis.
b
Devices used for power quality monitoring in accordance with IEC 62586-1 can be used for power monitoring
especially where comparable measurements are needed.
NOTE Other information such as occupancy, number of operations, manufacturing figures, is provided by
different instruments and are covered by other standards.

8.3.1.3 Measurement
Replace, in the 3 dashed list items, in the third paragraph, "PMD-1", "PMD-2" and "PMD-3"
with "PMD-I", "PMD-II" and "PMD-III" respectively.
Figure 3
Replace Figure 3, including the Key, with the following new Figure 3 and Key:

Key
Symbol Function
PMD power metering and monitoring device
PMD-I PMD including at least: E
a
PMD-II PMD including at least: P, Q, S, E , E , f, I, U and/or V, PF,
a r
PMD-III PMD including at least: P, Q, S, E , E , E , f, I, I , U and/or V, PF, THD and/or THD
a r ap N U V
and/or THD-R and/or THD-R , THD and/or THD-R
U V I I
P total active power
E total active energy
a
Q total reactive power
S total apparent power
 IEC 2019
E total reactive energy
r
E total apparent energy
ap
f fr
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.