Abstract

This document specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include:
– mappings to concrete data representations (XML, JSON and similar);
– mappings to application protocols for the message passing;
– security related aspects.
This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document.

Status
Published
Publication Date
08-Oct-2026
Current Stage
6060 - Document made available - Publishing
Start Date
09-Oct-2026
Due Date
27-Apr-2026
Completion Date
27-Apr-2026

Buy Documents

Standard

EN IEC 63402-2-2:2026 - BARVE

English language (104 pages)
Preview
Preview
e-Library read for
×1 day

EN IEC 63402-2-2 is a CLC/IEC standard for energy efficiency and customer energy management systems. It specifies the semantic interoperability, data models and messaging for the interface between a Customer Energy Manager (CEM) and Resource Manager(s) inside a home or building premises. In practice, it tells implementers how to describe flexibility, forecasts, control options and message exchanges in a technology-independent way.

What does EN IEC 63402-2-2 specify?

EN IEC 63402-2-2 specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and Resource Managers within the premises. It gives a technology-independent set of data models and interaction patterns so that energy management applications can exchange meaning, not just bytes.

The document also states what it does not cover: mappings to concrete data representations such as XML or JSON, mappings to application protocols for message passing, and security-related aspects. That matters in practice because the standard defines the information model and the exchange logic, while protocol and security choices are left to other specifications.

AnnexWhat it covers
AUse cases and examples for organizing, scheduling, management and EV charging in premises energy management

The document is organized into clauses on scope, references, terms, architecture and energy management concepts, data models, communication tasks, and an annex of use cases and case studies.

What are the key requirements of EN IEC 63402-2-2?

EN IEC 63402-2-2 divides responsibilities between the CEM and the Resource Manager, then defines the data objects and interaction patterns needed to exchange energy flexibility information. The practical result is a common way to describe what a device can do, what it is doing now, and how it should be controlled.

Architecture and responsibilities

  • Clause 4 defines the premises-side architecture and distinguishes S1 communication from S2 communication. The standard focuses on S2, while noting that data sent via S1 may still affect the design. For implementers, this means the interface must fit into a larger premises and smart grid architecture without trying to replace it.
  • Clause 5 treats the Resource Manager as a gateway function with embedded intelligence that represents a single energy flexibility. It sits between the CEM and the HBES/BACS/SASS or smart device, and it enriches device-specific behavior into energy-management terms. In practice, a device may say what it can switch on or off; the Resource Manager has to turn that into meaningful power, timing and constraint information for the CEM.
  • Clause 6 defines the CEM as the software component responsible for energy management within the premises, and it describes three optimization styles: local optimization, implicit control, and explicit control. This matters because different installations use different business models and grid arrangements, so the same interface must support tariffs, local optimization, and direct instructions.

Energy data and control concepts

  • Clause 7 says the Resource Manager can provide power measurements and power forecasts, but only for supported commodities exchanged with the local grid. It does not turn the S2 interface into a general sensor bus for internal device measurements. For readers, that means the CEM receives only energy-management-relevant data, not every internal status variable of the appliance.
  • Clause 7.3 introduces the abnormal condition concept. When a CEM indicates an abnormal condition, the Resource Manager may expose behavior that sacrifices user comfort, but it must still preserve safe operation and avoid extreme wear. In practice, this is the emergency path for situations where grid stability or other severe conditions outweigh normal comfort targets.
  • Clause 7.6.2 defines Power Envelope Based Control (PEBC) around lower and upper limits, optional limit ranges, and a consequence type that is either VANISH or DEFER. VANISH means the curtailed load or generation is lost, while DEFER means it is postponed. This distinction matters because the CEM must know whether reduced power disappears permanently or only shifts in time.
  • Clause 7.6.3 defines Power Profile Based Control (PPBC) around profile modification, including sequence shifting and sequence selection. The corresponding tasks in Clause 9 let the CEM update profile definitions, schedule instructions and interruption instructions. That makes this mode suitable for devices that operate through planned sequences rather than a single power limit.
  • Clause 7.6.4 defines Operation Mode Based Control (OMBC) as a mode-based approach where the Resource Manager offers operation modes and the CEM selects one, possibly with a factor inside a power range. The clause also explains that mode transitions can be blocked by timers, and that the communicated state machine is only an approximation of the real device state. In practice, the CEM must keep checking status updates instead of assuming every planned transition has actually happened.
  • Clause 7.6.5 and 7.6.6 define Fill Rate Based Control (FRBC) and Demand Driven Based Control (DDBC). FRBC is built around fill level, fill rate, leakage behavior, usage forecasts and fill-level target profiles, while DDBC lets the CEM decide how a demand should be fulfilled. These control types are useful for storage-like or demand-responsive equipment where the important question is not only power, but how the resource is filled, emptied or served.

Data model and communication

  • Clause 8 collects the shared data model. It defines basic data types, Resource Manager details, power forecast objects, control-type-specific objects, and enumerations such as RoleType, Commodity, InstructionStatus and ControlType. For implementers, this clause is the main mapping guide for software classes, fields and status values.
  • Clause 9 turns those data models into communication tasks. It defines generic tasks such as updating Resource Manager details, activating a control type, communicating a power measurement, updating a power forecast and revoking a forecast, then repeats the same task pattern for each control type. This helps protocol designers preserve the same meaning even if the transport layer is different.
  • Clause 9 also makes the exchange task-based rather than tied to one transport model. Tasks have preconditions, can be executed when those preconditions are met, and may run in parallel. In practice, a protocol can package and split messages as needed, as long as the conceptual order and semantics stay intact.

What terms does EN IEC 63402-2-2 define?

  • Customer Energy Manager (CEM) - the software component responsible for energy management within the premises and for finding suitable allocations for connected resources.
  • Resource Manager - a gateway-like software component that represents one energy flexibility and translates device-specific behavior into energy-management information for the CEM.
  • S2 communication - the interface between the CEM and the Resource Manager.
  • Power Envelope Based Control - a control type where the CEM coordinates a device by setting power limits for that device.
  • Power Profile Based Control - a control type where the CEM coordinates through profile modification, including sequence shifting and sequence selection.
  • Operation Mode Based Control - a control type where the Resource Manager offers operation modes and the CEM chooses among them.
  • Fill Rate Based Control - a control type based on measurements of fill level and fill rate.
  • Demand Driven Based Control - a control type where the CEM decides how a given demand should be fulfilled.

Who uses EN IEC 63402-2-2?

EN IEC 63402-2-2 is used by engineers and software designers building premises energy management systems, especially where a CEM must communicate with device-side Resource Managers. It is relevant to manufacturers and integrators of HBES/BACS, SASS and smart devices such as water heaters, air conditioners, heat pumps, stationary batteries, electric vehicles, photovoltaic systems and combined heat and power equipment.

It is also used by utilities, smart grid operators, aggregators and distribution system operators when they need controlled flexibility, tariffs or explicit instructions to affect consumption or production. Quality managers and buyers use it to check whether a solution can exchange capability descriptions, forecasts, constraints, instructions and status in the same semantic language.

Installers and system integrators can use the annexed use cases to understand configuration, scheduling and management scenarios in premises. That is especially helpful when a project combines local optimization with grid-driven signals or vehicle charging.

Which standards are used with EN IEC 63402-2-2?

  • IEC 63402-1 - provides the base terminology and architecture for the 63402 series, and Clause 3 of this document builds on it for terms such as CEM, Resource Manager, SASS and HBES/BACS.
  • IEC/TR 62746-2 - provides the use cases and requirements from which the annexed examples are derived.
  • ISO 4217 - provides the currency codes used for tariff and price-related data.
  • EN 61850-7-2 - provides the abstract communication service interface concepts referenced in the normative references.
  • ISO 15118-20 - supports the vehicle-to-grid communication context used in the EV charging case studies.

What does the EN IEC 63402-2-2 document contain?

EN IEC 63402-2-2 contains an architectural overview of the premises smart grid system, including the roles of the CEM and Resource Manager and the relationship between S1 and S2 communication. It also contains explanatory text for energy management roles, optimization styles and abnormal conditions.

Clause 8 contains the structured data model, including basic types, power-related objects, forecast objects, control-type objects and enumerations. Clause 9 contains the task descriptions for updating, activating, revoking and processing energy-management information in a protocol-independent way.

The document also includes figures that illustrate the system architecture, power constraint examples and factor-to-power mapping. It contains one formula for selecting a power value within an operation-mode range, and it uses task preconditions to describe when each exchange is valid.

Annex A contains use cases grouped into organizing, scheduling, management and case studies. Those examples are there to help readers understand how the abstract data model and messaging patterns apply to real premises energy-management situations, including EV charging.

Relations

Effective Date
22-Sep-2026
Effective Date
22-Sep-2026
Effective Date
22-Sep-2026

Buy Documents

Standard

EN IEC 63402-2-2:2026 - BARVE

English language (104 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

DNV

DNV is an independent assurance and risk management provider.

NA Norway Verified

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

Bureau Veritas

Bureau Veritas is a world leader in laboratory testing, inspection and certification services.

COFRAC France Verified

Sponsored listings

Frequently Asked Questions

EN IEC 63402-2-2:2026 is a standard published by CLC. Its full title is "Energy efficiency - Customer energy management system - Part 2-2: Data model and messaging - Interface between the customer energy manager and resource managers". This standard covers: This document specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include: – mappings to concrete data representations (XML, JSON and similar); – mappings to application protocols for the message passing; – security related aspects. This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document.

This document specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include: – mappings to concrete data representations (XML, JSON and similar); – mappings to application protocols for the message passing; – security related aspects. This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document.

EN IEC 63402-2-2:2026 is classified under the following ICS (International Classification for Standards) categories: 03.100.70 - Management systems; 27.015 - Energy efficiency. Energy conservation in general; 29.020 - Electrical engineering in general. The ICS classification helps identify the subject area and facilitates finding related standards.

EN IEC 63402-2-2:2026 has the following relationships with other standards: It is inter standard links to ISO 4217:2015, EN IEC 63402-1:2025, EN ISO 15118-20:2022. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

EN IEC 63402-2-2:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms, definitions and abbreviated terms
  • 3.1 Terms and definitions
  • 3.1.1 customer energy manager
  • 3.1.2 power envelope based control
  • 3.1.3 power profile based control
  • 3.1.4 operation mode based control
  • 3.1.5 fill rate based control
  • 3.1.6 demand driven based control
  • 3.1.7 resource manager
  • 3.1.8 role
  • 3.1.9 S1 communication
  • 3.1.10 S2 communication
  • 3.1.11 smart grid
  • 3.1.12 smart grid operator
  • 3.1.13 time slot
  • 3.1.14 use case
  • 3.1.15 user
  • 3.1.16 prosumer
  • 3.1.17 single application smart system
  • 3.1.18 home and building electronic system
  • 3.1.19 abnormal condition
  • 3.2 Abbreviated terms
  • 4 Energy management
  • 4.1 Architectural overview
  • 4.2 Description
  • 4.3 Energy management roles
  • 5 Resource manager
  • 10 W. This means that the resource manager shall enrich the information it receives from the
  • 6 Customer energy manager (CEM)
  • 6.1 General
  • 6.2 Local optimization
  • 6.3 Implicit control
  • 6.4 Explicit control
  • 6.5 Summary
  • 7 Energy management concepts
  • 7.1 General
  • 7.2 Design philosophy
  • 7.3 Abnormal condition
  • 7.4 Power measurements
  • 7.5 Power forecasts
  • 7.6 Control types
  • 8 Energy management data models
  • 8.1 Basic data types
  • 8.2 Resource manager
  • 8.3 Power forecast
  • 8.4 Control types
  • 8.5 Enumerations
  • 9 Communication
  • 9.1 General
  • 9.2 Generic tasks
  • 9.3 Power envelope based control tasks
  • 9.4 Power profile based control tasks
  • 9.5 Operation mode based control tasks
  • 9.6 Fill rate based control tasks
  • 9.7 Demand driven based control tasks
  • Annex A
  • Bibliography

Introduction

Over recent decades, energy production and its consumption patterns have changed dramatically. Although central energy production is still dominant, the trend for distributed production is distinctive following an increasing number of renewables. Alternative energy sources are highly fluctuating in their production capabilities, which can result in the grid operators having difficulty to keep a balance between energy production and consumption. The complexity of keeping the grid reliable is further increased by the change in the electric energy consumption and production of the customer itself, e.g., the use of electric vehicles and personal generation facilities.

A Smart Grid allows the grid operator to be flexible and reactive. Such reactivity uses communication between energy consuming and producing entities, from single family houses to large factories.

This document describes aspects of the smart grid that relate specifically to the premises (home or building) part of the smart grid and describes the common interface between equipment in the premises and the smart grid. This document defines the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the Resource Managers within the premises.

Different use cases are explained in Annex A, which help to understand the philosophy of this document.

This document is based on EN 50491-12-2 [1] which also served as a basis for ETSI TS 103 410-1 SAREF4ENER [2].

SIST EN IEC 63402-2-2:2026

1 Scope

This document specifies the fundamental aspects of semantic interoperability for the S2 interface and the related data exchange between a CEM and the resource managers within the premises. It provides a technology independent set of data models and interaction patterns in order to enable applications for energy management within the premises. This document does not include:

  • mappings to concrete data representations (XML, JSON and similar);
  • mappings to application protocols for the message passing;
  • security related aspects.

This group EE publication is primarily intended to be used as an EE standard for the products mentioned in the scope, but is also intended to be used by TCs in the preparation of publications for products which are included in the boundary mentioned in the scope of this document.

2 Normative references

The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

IEC TR 62746-2:2015, Systems interface between customer energy management system and the power management system - Part 2: Use cases and requirements IEC 63402-1, Energy Efficiency - Customer Energy Management Systems -- Part 1: General Requirements and Architecture ISO 4217, Codes for the representation of currencies ISO 15118-20, Road vehicles - Vehicle to grid communication interface - Part 20: Network and application protocol requirements

3 Terms, definitions and abbreviated terms

3.1 Terms and definitions

For the purposes of this document, the terms and definitions given in IEC 63402-1, and the following apply.

ISO and IEC maintain terminology databases for use in standardization at the following addresses:

  • IEC Electropedia: available at https://www.electropedia.org/
  • ISO Online browsing platform: available at https://www.iso.org/obp

3.1.1 customer energy manager

CEM internal automation function for optimizing the energy consumption, production and storage within the premises according to the preferences of the customer using internal flexibilities and typically based on external information received through the energy management gateway and possibly other data sources [SOURCE: IEC 63402-1:2025 [3], 3.1.1]

SIST EN IEC 63402-2-2:2026

3.1.2 power envelope based control

coordination of the CEM based on limitations to the device Note 1 to entry: The CEM can set minimum and maximum values for the power that shall not be exceeded by the device.

3.1.3 power profile based control

control type where coordination from the CEM is based on profile modification, including concepts of sequence shifting, sequence selection

3.1.4 operation mode based control

control type where the resource manager offers the CEM multiple operation modes that the CEM could choose from Note 1 to entry: The behaviour of the device will be modified by selecting operation modes.

3.1.5 fill rate based control

control type based on measurements indicating the fill level and the fill rate

3.1.6 demand driven based control

control type where the CEM can decide how a given demand should be fulfilled

3.1.7 resource manager

RM function that exclusively represents a logical group of devices or a single smart device, and is responsible for sending unambiguous instructions to the logical group of devices or to a single device, typically using a device-specific protocol Note 1 to entry: In the context of this document the resource manager manages the energy flexibility of a logical group of devices or a single smart device.

[SOURCE: IEC 63402-1:2025 [3], 3.1.9]

3.1.8 role

categorization of the behaviour of a participant by its capabilities related to energy management, each participant at least supporting one

3.1.9 S1 communication

interface between CEM and energy management gateway

3.1.10 S2 communication

interface between CEM and resource manager

3.1.11 smart grid

electric power system that utilizes information exchange and control technologies, distributed computing and associated sensors and actuators, for purposes such as:

  • to integrate the behaviour and actions of the network users and other stakeholders,
  • to efficiently deliver sustainable, economic and secure electricity supplies

SIST EN IEC 63402-2-2:2026

3.1.12 smart grid operator

instance requesting energy profiles from the CEM in order to keep the grid stable and reliable

3.1.13 time slot

fixed period of time with a specific duration

3.1.14 use case

case that describes interactions between an actor and another actor or a system to achieve a specific goal, either very abstract or very detailed Note 1 to entry: The use case can be nested.

3.1.15 user

either a person (e.g. installer or resident) or a surrogate service

3.1.16 prosumer

household or device that produces and consumes energy of the same commodity [SOURCE: IEC 60050-617:2009 [4], 617-02-16, modified - Replacement of "network user" with "household or device"; addition of "of the same commodity".]

3.1.17 single application smart system

SASS group of devices having a communication interface for a single application such as heating or lighting, that consume, produce or store energy (or a combination thereof) and that can be controlled by a resource manager for the purpose of energy management [SOURCE: IEC 63402-1:2025 [3], 3.1.13]

3.1.18 home and building electronic system

building automation control system HBES BACS logical group of devices which uses a multi-application communication system where the functions are distributed and linked through a common communication process EXAMPLE Management of lighting, heating, energy, water, fire alarms, blinds, different forms of security, etc. Note 1 to entry: HBES and BACS is used in homes and buildings plus their surroundings. Functions of the system are, for example: switching, open loop controlling, closed loop controlling, monitoring and supervising. Note 2 to entry: In literature, HBES or BACS can be referred also as "home control system or network", "home electronic systems", "building automation systems", etc.

[SOURCE: IEC 63402-1:2025 [3], 3.1.6]

3.1.19 abnormal condition

situation in which a Resource Manager is sacrificing user comfort when requested by the CEM

SIST EN IEC 63402-2-2:2026

3.2 Abbreviated terms

AC Alternating current API Application Programmable Interface BACS Building Automation Control Systems CEM Customer Energy Management CHP Combined Heat and Power DC Direct current DDBC Demand Driven Based Control DSO Distribution System Operator EM Energy Management EMG Energy Management Gateway EV Electric Vehicle FRBC Fill Rate Based Control HBES Home and Building Electronic Systems HMI Human-Machine Interface I/F Interface M/O Mandatory / Optional M Mandatory O Optional OMBC Operation Mode Based Control PEBC Power Envelope Based Control PPBC Power Profile Based Control PV Photovoltaics RM Resource Manager RTP Real Time Pricing SASS Single Application Smart System SG Smart Grid TBEM Tariff Based Energy Management TOU Time Of Use 95PPR 95 Percent Probability Range 68PPR 68 Percent Probability Range

4 Energy management

4.1 Architectural overview

In IEC 63402-1 [5], the system architecture of the Smart Grid premises side is described in Figure 1. It includes the common interface between the equipment in the home or building, referred to as the Customer Energy Manager (CEM), and the Smart Grid (SG), referred to as the Energy Management Gateway (EMG). The data exchange between the EMG and the CEM is referred to as the S1 data exchange whereas the data exchange between the CEM and the Resource Manager on the premises side is referred to as the S2 data exchange.

SIST EN IEC 63402-2-2:2026

Figure 1 – Architectural overview of Premises smart grid system Although the communication specified in this document mainly refers to S2 Communication, data that will be transmitted via S1 shall be considered as well. However, this document does not specify S1 Communication.

4.2 Description

A HBES/BACS/SASS or (Smart) device is usually purchased to fulfil a goal of the end user of the device or devices. For example, the goal of the end user of an electric boiler is to have hot tap water, and the goal of the end user of a heat pump is to have a comfortable room temperature. Meeting these goals is what is defined as user comfort. Although these goals shape the behaviour of a Smart Device, they do not completely define it. There might be multiple ways in which the goal of the end user can be achieved. For example, when there is still enough hot water in the electric boiler, the heating of the water could be postponed. In other words, there is some flexibility in achieving the goal of the end user. This is illustrated by Figure 2.

A battery or electric vehicle has a particular target state of charge at a particular moment in time. There are multiple ways to achieve this target, each with their own associated power profile. While all power profiles achieve the target state, these profiles can have a big impact on the power grid. Influencing how a device achieves its targets is what is defined as Energy Management. However, not all HBES/BACS/SASS or (Smart) devices have an explicit goal. For example, the sole purpose of a stationary battery can be to perform Energy Management; there is no other goal from the end user.

SIST EN IEC 63402-2-2:2026

Figure 2 – Example of how different power profiles can achieve the same target state Energy Management always involves one or multiple types of energy which are exchanged with the grid, such as electricity (exchanged with a power grid), natural gas (exchanged with a gas grid) or heat (exchanged with a heat grid). These types of energy can be interconnected in the behaviour of the device.

For example, a (micro) CHP typically consumes natural gas, but at the same time produces electricity. For Energy Management purposes, it is necessary to know the behaviour of HBES or BACS or SASS or (Smart) devices with respect to these types of energy. These different energy types that are exchanged with a grid are referred to as commodities.

4.3 Energy management roles

4.3.1 General

In the S2 ecosystem, there are multiple entities fulfilling roles. This subclause gives an overview of these roles and gives concrete examples. Each role assumes a specific functionality and behaviour for a specific Commodity and is attributed to the entity by the entity itself. Entities referred to with roles are defined as EM (Energy Management) Participants. EM participants can fulfil one or multiple of these roles:

  • energy management;
  • energy producer;
  • energy consumer;
  • energy storage.

SIST EN IEC 63402-2-2:2026

4.3.2 Energy producer role
4.3.2.1 Description

An energy producer is an EM participant that produces energy. It can operate under specific capabilities and constraints such as additional costs or the maximum amount of energy. As other EM participants, especially the CEM, need to know these capabilities and constraints, each energy producer shall provide a control type that contains those capabilities and constraints.

In general, all energy producers are categorized by their flexibility of energy production. Controlled producers are able to adapt their production whereas uncontrolled producers do not have that capability.

4.3.2.2 Controlled producers

Controlled producers can adjust the amount of energy they are producing according to their capabilities and constraints (e.g. max power). They shall be able to communicate the flexibility of energy production behaviour to the CEM, which in turn will send instructions to trigger changes.

4.3.2.3 Uncontrolled producers

Uncontrolled producers are those energy generating EM participants that do not offer a way to influence their mode of operation and thus cannot offer flexibility of power to the CEM. Photovoltaics can be an example of an uncontrolled producer, if for example the inverter does not offer any curtailment functionality. In case such curtailment options are available, the device should expose the controlled producer role. This example shows that, ultimately, it is not the type of device but its feature set that determines which role (controlled or uncontrolled producer) applies.

Additionally, uncontrolled producers will typically be less predictable than controlled producers, because they offer much less control over when they are able to operate in a specific range of their operational parameters. In those cases, it is especially important for the CEM that uncontrolled producers can provide a power forecast of expected power levels and their probabilistic variations.

4.3.3 Energy consumer role
4.3.3.1 Description

All EM participants that consume energy and utilize the provided energy to conduct some form of work are grouped as energy consumers. The fed energy is thus transformed to work, heat, etc. and can generally not be regained from the EM participant. This role includes standard home EM participants that participate actively in the EM network. Examples include water heaters, air conditioner or electric vehicles.

Every energy consumer can support the CEM by providing measurements, forecasts or control options, or both.

4.3.3.2 Water heater

A water heater is an EM participant that utilizes power to heat water. Flow heaters are heating water while it flows through and thus need to react on demand and are out of scope here. Water heaters with storage capability form the relevant use case from a demand side management perspective as they can operate in flexible boundaries to keep the stored water at a given level and temperature.

SIST EN IEC 63402-2-2:2026

Water heaters are usually categorized by their maximum capacity in litres and the energy they need to heat water and to keep it at a given temperature. During operation time, the operational mode of the water heater is influenced by the water capacity and the minimum temperature required for the stored water.

Depending on the use of water heaters, the needed energy for heating water as well as the possibility to store hot water, water heaters are well suited to support efficient energy management.

4.3.3.3 Air condition

Air conditions are EM participants that utilize energy to cool down the air in a building. In contrast to water heaters, they typically do not have any storage capabilities themselves, but the room can be used as a buffer if a certain bandwidth in temperature is allowed. In this way, an air condition is also able to shift the power load in time in order to fulfil energy management requirements.

4.3.4 Energy storage role
4.3.4.1 Description

Furthermore, EM participants that can store energy play an important role in managing energetic environments as they are able to take energy in when it is abundant (or cheap) and release energy when it is scarce (or expensive). It shall be noted that this capability comes with consequences, e.g. storing energy requires more energy than what can be released at a later point. Every energy storage shall be able to declare its storage capacity including any consequences.

4.3.4.2 Stationary battery

Batteries are the standard EM participants when it comes to storing electricity. They are available with various capacities and can greatly contribute to balancing loads for premises, on grid level or in other environments.

While a battery is mainly defined by its capacity, charging time, required current and efficiency (ratio of consumed energy to released energy), which also play an important role in utilizing this EM participant optimally.

4.3.4.3 Electric vehicle

In addition to fixed batteries installed at a fixed location, mobile batteries (usually stored in electric vehicles) shall be considered as well.

Mobile batteries share all properties and operational parameters of stationary batteries, however, they have the added property of mobility, which means a mobile battery can appear in or disappear from a system at any point in time. They are thus less reliable than stationary batteries.

Furthermore, to use mobile batteries to optimize the utilization of energy in a system, the mobility requirements shall be considered, i.e. an electric vehicle shall be charged at a given (scheduled) time and should sometimes not be drained below a certain level, which would render the vehicle immobile.

SIST EN IEC 63402-2-2:2026

5 Resource manager

The resource manager has a gateway function with embedded intelligence. It is a software component that represents a single energy flexibility. This document does not define where the resource manager runs physically. This could for example be on the smart device itself, on a separate device or in the environment of the manufacturer (e.g., cloud services). The resource manager connects on one side with the CEM using S2, and on the other side with a HBES or BACS or SASS or (smart) device. How the resource manager communicates with the HBES or BACS or SASS or (smart) device is out of scope for this document. For example, when a resource manager is implemented on the smart device itself, a local API can be used. It could also communicate through another device or a domain specific protocol.

...