FprEN IEC 60297-3-102:2026
(Main)Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-102: Injector/extractor handle
Bauweisen für elektronische Einrichtungen - Maße der 482,6-mm-(19-in-)Bauweise - Teil 3-102: Ein-/Aushebegriff
Structures mécaniques pour équipements électroniques - Dimensions des structures mécaniques de la série 482,6 mm (19 pouces) - Partie 3-102: Poignée d’injecteur/d’extracteur
Mehanske konstrukcije elektronske opreme - Mere mehanskih konstrukcij v seriji 482,6 mm (19 in) - 3-102. del: Ročica za vtikanje/izvlačenje
General Information
- Status
- Not Published
- Publication Date
- 11-Oct-2026
- Technical Committee
- CLC/SR 48D - Mechanical structures for electronic equipment
- Current Stage
- 5020 - Vote circulated - Formal Approval
- Start Date
- 29-May-2026
- Due Date
- 30-Apr-2026
- Completion Date
- 29-May-2026
Relations
- Effective Date
- 15-Apr-2025
Overview
FprEN IEC 60297-3-102:2026 is an international standard developed by CLC and IEC SC 48D, specifying the dimensional requirements and interface characteristics for injector/extractor handles used in the 482.6 mm (19 inch) mechanical structure series for electronic equipment. This document is part of the broader IEC 60297 series, which is recognized worldwide for standardizing the main design features of subracks, plug-in units, and other modular mechanical structures used in telecommunications, computing, industrial, and electronic control systems.
The standard defines additional interface dimensions for both front panel mounted and printed board mounted injector/extractor handles, ensuring compatibility and interoperability within 19-inch subrack systems. By adhering to these guidelines, manufacturers and designers can achieve greater modularity and maintainability in electronic equipment assemblies.
Key Topics
- Injector/Extractor Handle Types: The standard distinguishes between front panel mounted and printed board mounted handles, and provides clear dimensional guidance for each.
- Interface Dimensions: FprEN IEC 60297-3-102:2026 addresses precise interface measurements for handle installation, ensuring compatibility with associated subracks and plug-in units as defined in related standards.
- Subrack Aperture Heights: The standard references standardized subrack heights (e.g., 3U, 6U, 9U) to maintain consistency in vertical clearances for handle operation.
- Component Interoperability: Emphasis is placed on ensuring that injector/extractor handles do not interfere with usable component areas or compromise subrack structural integrity.
- System Modularity: Guidance is provided to enable the flexible integration of different handle types, promoting ease of component replacement and system maintenance.
Applications
FprEN IEC 60297-3-102:2026 is essential for:
- Designers and Manufacturers: Ensuring that injector/extractor handles for plug-in units and printed board modules are compatible with established 19-inch subrack systems.
- System Integrators: Facilitating rapid assembly and replacement of modules in electronic equipment racks, boosting operational efficiency.
- Telecommunications and IT Infrastructure: Supporting reliable connection and extraction mechanisms in high-density server and network systems.
- Industrial Control Equipment: Enabling modular, maintainable hardware configurations in automation and monitoring systems.
- Testing and Certification: Assisting conformity assessment bodies in evaluating products for adherence to globally recognized mechanical structure standards.
By following this standard, organizations enhance product interoperability, simplify maintenance procedures, and reduce the risk of mechanical damage during installation or removal of equipment modules.
Related Standards
FprEN IEC 60297-3-102:2026 closely interacts with several other international standards for mechanical structures of electronic equipment, including:
- IEC 60297-3-101: Specifies subracks and associated plug-in units for 482.6 mm (19 in) structures.
- IEC TR 60297-3-1:2023: Provides technological schemes and applications for the 19-inch system.
- IEC 60917-1: Covers modular order for the development of mechanical structures.
- IEC 60297-3-XXX Series: Encompasses standards for additional mechanical features and components within the 19-inch subrack system.
Implementing these related standards alongside FprEN IEC 60297-3-102:2026 ensures a unified approach to mechanical design, promoting long-term flexibility and consistency across electronic equipment infrastructure.
Keywords: mechanical structures for electronic equipment, 19-inch subrack system, injector/extractor handle, IEC 60297, modular design, plug-in units, electronic rack standards, interoperability, subrack dimensions, CLC, IEC SC 48D.
Frequently Asked Questions
FprEN IEC 60297-3-102:2026 is a draft published by CLC. Its full title is "Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-102: Injector/extractor handle". This standard covers: Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-102: Injector/extractor handle
Mechanical structures for electronic equipment - Dimensions of mechanical structures of the 482,6 mm (19 in) series - Part 3-102: Injector/extractor handle
FprEN IEC 60297-3-102:2026 is classified under the following ICS (International Classification for Standards) categories: 31.240 - Mechanical structures for electronic equipment. The ICS classification helps identify the subject area and facilitates finding related standards.
FprEN IEC 60297-3-102:2026 has the following relationships with other standards: It is inter standard links to EN 60297-3-102:2004. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
FprEN IEC 60297-3-102:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
SLOVENSKI STANDARD
oSIST prEN IEC 60297-3-102:2025
01-julij-2025
Mehanske konstrukcije elektronske opreme - Mere mehanskih konstrukcij v seriji
482,6 mm (19 in) - 3-102. del: Ročica za vtikanje/izvlačenje
Mechanical structures for electronic equipment - Dimensions of mechanical structures of
the 482,6 mm (19 in) series - Part 3-102: Injector/extractor handle
Bauweisen für elektronische Einrichtungen - Maße der 482,6-mm-(19-in-)Bauweise - Teil
3-102: Ein-/Aushebegriff
Structures mécaniques pour équipements électroniques - Dimensions des structures
mécaniques de la série 482,6 mm (19 pouces) - Partie 3-102: Poignée
d’injecteur/d’extracteur
Ta slovenski standard je istoveten z: prEN IEC 60297-3-102:2025
ICS:
31.240 Mehanske konstrukcije za Mechanical structures for
elektronsko opremo electronic equipment
oSIST prEN IEC 60297-3-102:2025 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
oSIST prEN IEC 60297-3-102:2025
oSIST prEN IEC 60297-3-102:2025
48D/785/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 60297-3-102 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2025-06-13 2025-09-05
SUPERSEDES DOCUMENTS:
48D/782/RR
IEC SC 48D : MECHANICAL STRUCTURES FOR ELECTRICAL AND ELECTRONIC EQUIPMENT
SECRETARIAT: SECRETARY:
Germany Mr Arno Bergmann
OF INTEREST TO THE FOLLOWING COMMITTEES: HORIZONTAL FUNCTION(S):
SC 48B
ASPECTS CONCERNED:
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some
Countries” clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is
the final stage for submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).
TITLE:
Mechanical structures for electronic equipment - Dimensions of mechanical structures of the
482,6 mm (19 in) series - Part 3-102: Injector/extractor handle
PROPOSED STABILITY DATE: 2029
NOTE FROM TC/SC OFFICERS:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
oSIST prEN IEC 60297-3-102:2025
IEC CDV 60297-3-102©IEC 2025 2
Link to Committee Draft for Vote (CDV) online document:
https://osd.iec.ch/#/editor/archive/3254a29f-1b23-d2f3-e063-2b13000a210e/en/CCDV/1
How to access
This link leads you to the Online Standards Development (OSD) platform for National Mirror
Committee’s (NMC) comments. The project draft may be found further down this document.
Resource materials
We recommend NCs to review the available materials to better understand the member commenting
on the OSD platform. This includes the:
• OSD NC roles overview: here
• How to add and submit comments to the IEC: here
Contact
Should you require any assistance, please contact the IEC IT Helpdesk at helpdesk@iec.ch.
oSIST prEN IEC 60297-3-102:2025
IEC CDV 60297-3-102©IEC 2025 3
CONTENTS
FOREWORD . 4
INTRODUCTION . 6
1 Scope . 7
2 Normative references . 7
3 Terms and definitions . 7
4 Injector/extractor handles for plug-in units . 7
4.1 General . 7
4.2 Arrangement overview . 8
5 Front panel mounted injector/extractor handle . 9
5.1 Subrack interface dimensions for front panel mounted injector/extractor
handle . 9
5.2 Plug-in unit interface dimensions for front panel mounted injector/extractor
handle . 10
6 Printed board mounted injector/extractor handle . 11
6.1 Subrack interface dimensions for printed board mounted injector/extractor
handle . 11
6.2 Plug-in unit interface dimensions for printed board mounted
injector/extractor handle . 12
Bibliography . 14
Figure 1 – Conventional 19-inch subrack system mechanical structure . 6
Figure 2 – Arrangement overview of plug-in unit front panel mounted handles . 8
Figure 3 – Arrangement overview of printed board mounted injector/extractor handles . 9
Figure 4 – Subrack interface dimensions for front panel mounted injector/extractor
handle . 10
Figure 5 – Plug-in unit interface dimensions for front panel mounted injector/extractor
handle . 11
Figure 6 – Subrack interface dimensions for printed board mounted injector/extractor
handle . 12
Figure 7 – Printed board mounted injector/extractor handle interface dimensions . 13
Table 1 – Aperture height dimensions of the subrack . 10
oSIST prEN IEC 60297-3-102:2025
IEC CDV 60297-3-102©IEC 2025 4
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
Mechanical structures for electronic equipment - Dimensions of
mechanical structures of the 482,6 mm (19 in) series - Part 3-102:
Injector/extractor handle –
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization
comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to
promote international co-operation on all questions concerning standardization in the electrical and
electronic fields. To this end and in addition to other activities, IEC publishes International Standards,
Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides
(hereafter referred to as "IEC Publication(s)"). Their preparation is entrusted to technical committees;
any IEC National Committee interested in the subject dealt with may participate in this preparatory
work. International, governmental and non-governmental organizations liaising with the IEC also
participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two
organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an
international consensus of opinion on the relevant subjects since each technical committee has
representation from all interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC
National Committees in that sense. While all reasonable efforts are made to ensure that the technical
content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are
used or for any misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC
Publications transparently to the maximum extent possible in their national and regional publications.
Any divergence between any IEC Publication and the corresponding national or regional publication
shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide
conformity assessment services and, in some areas, access to IEC marks of conformity. IEC is not
responsible for any services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual
experts and members of its technical committees and IEC National Committees for any personal
injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for
costs (including legal fees) and expenses arising out of the publication, use of, or r
...



