SIST EN IEC 63082-1:2027
(Main)Intelligent device management - Part 1: Concepts and terminology (IEC 63082-1:2025)
- Abstract
This part of IEC 63082 defines the concepts and terminology necessary to understand and
communicate effectively about intelligent device management (IDM). This document explains
the relationship between IDM and other existing asset management standards.
Additionally, this document describes principles and defines organizational and functional
structures associated with IDM. This document also introduces the concept of IDM program for
coordination of multiple stakeholders.
- Status
- Not Published
- Public Enquiry End Date
- 30-May-2026
- Technical Committee
- MOV - Measuring equipment for electromagnetic quantities
- Current Stage
- 6060 - National Implementation/Publication (Adopted Project)
- Start Date
- 28-Sep-2026
- Due Date
- 03-Dec-2026
SIST EN IEC 63082-1:2027 is the Slovenian adoption of IEC 63082-1 and the European draft text for Part 1 of the Intelligent device management series. It defines the concepts and terminology for intelligent device management (IDM), explains how IDM fits with other asset management standards, and sets out the management, organizational, and functional ideas used by enterprises, facilities, and suppliers that work with intelligent devices and industrial automation control systems (IACS).
What does SIST EN IEC 63082-1:2027 specify?
SIST EN IEC 63082-1:2027 specifies the language and framework needed to understand and communicate about IDM. It also explains the relationship between IDM and asset management, introduces the IDM program as the coordination mechanism for multiple stakeholders, and organizes the subject from basic concepts through enterprise, facility, supplier, and information-management topics.
The document is arranged into Clauses 1 to 10 and several annexes. Clause 3 defines the key terms and abbreviated terms, while Clauses 4 to 10 move from foundational requirements to risk, enterprise management, coordination, facility life cycle phases, supplier requirements, and information management.
| Annex | What it covers |
|---|---|
| Annex ZA | Normative references to international publications and their corresponding European publications |
| Annex A | UML class and activity diagrams used to explain document structures and work processes |
| Annex C | Relationship between the IDM program and work processes, procedures, and tasks |
| Annex E | Criticality ranking and risk assessment method |
| Annex F | Benefits and justification of IDM |
| Annex G | Other maintenance aspects, including maintenance history and failure consequences |
| Annex H | IDM notifications, delivery mechanisms, and response actions |
What are the key requirements of SIST EN IEC 63082-1:2027?
SIST EN IEC 63082-1:2027 is a concepts-and-terminology standard, but it still lays out the management structure that IDM depends on. The most important points are the enterprise-wide scope, the need for coordinated risk control, the life-cycle view, and the role of information and supplier management in keeping intelligent devices usable over time.
Clause 4 - foundational requirements
Clause 4 says IDM applies across all life cycles and across the activities, technologies, products, and services involved with intelligent devices and IACS. In practice, this means IDM is not a single maintenance task; it depends on management support, clear responsibilities, formal and informal work processes, management of change (MOC), and risk management.
Clause 4 also separates work that needs formal documentation and training from work that can stay informal. That matters because the document ties formality to complexity, risk, number of parties involved, availability needs, and the need for stable results over long periods.
Clause 5 - risk management
Clause 5 treats risk management as a core IDM activity. It links IDM risk control to implementation threats, coordination with other enterprise programs, supplier risk, information quality, and cybersecurity.
In practice, an enterprise using IDM has to look beyond the device itself. It needs to control how device changes, poor information, supplier changes, and network exposure can affect the facility over its full life cycle.
Clause 6 - enterprise-level management
Clause 6 frames IDM as an enterprise program with defined structure, resources, and coordination. It links IDM to asset management and calls for program design, performance improvement, supplier management, and reusable work process templates.
This matters because IDM is meant to work across facilities and over many years. The document expects organizations to build common methods and support systems rather than letting each site invent its own approach.
Clause 7 - coordination across enterprise, facilities, and suppliers
Clause 7 focuses on coordination between the enterprise, facilities, and suppliers. It covers implementing IDM in new and existing facilities, improving the program through assessment and audits, and aligning IDM with other enterprise programs.
In practice, this means IDM has to fit into real projects and operations, not sit apart from them. The enterprise needs agreed interfaces, shared information, and a way to resolve non-compliances and gaps.
Clause 8 - facility life cycle phases
Clause 8 places IDM across the full facility life cycle, from scope development through design, construction, commissioning, operations and maintenance, turnarounds, and decommissioning. It gives special attention to early planning, device selection, procurement, configuration data, integration with IACS, testing, training, handover, and archiving.
The practical message is that IDM has to start early. If it is left until construction or startup is already underway, the document warns that the result can be rework, weak support for maintenance, and poor operator handling of alarms and notifications.
Clause 9 - supplier requirements
Clause 9 sets expectations for suppliers of devices, IACS, software, services, and device support tools. It points to life-cycle support, interoperability, cybersecurity, and the ability to support replacements, upgrades, templates, and toolkits.
For buyers and engineering teams, this means supplier selection is not only about the initial product. The supplier also has to fit the facility's long-term support model and its IDM work processes.
Clause 10 - information management
Clause 10 requires a consistent method for documenting device specification, design, implementation, and long-term maintenance information. It covers collection, exchange, reconciliation, storage, retention, access control, and data security.
In practice, the document expects controlled information for maintenance and reliability records, models and calculations, documents and drawings, work processes and procedures, worker-role competency, device configuration, and toolkits. That is what keeps changes traceable and usable over the device life cycle.
What terms does SIST EN IEC 63082-1:2027 define?
SIST EN IEC 63082-1:2027 defines the terms that make IDM discussions precise across engineering, maintenance, operations, and supplier work. The definitions are important because the document uses them to connect device behavior, management actions, and life-cycle planning.
- Intelligent device management (IDM) - formal coordinated business objectives, organizations, work processes, and resources used to realize value from intelligent devices.
- Intelligent device management program (IDM program) - the coordinated policies, strategies, activities, resources, and organization used to achieve IDM objectives.
- Intelligent device management system (IDMS) - a type of host system that helps different departments and facilities exchange and retrieve intelligent-device information, including live access to device information and configuration.
- Intelligent device - a configurable device with digital communication and extra functions such as diagnostics in addition to its basic purpose.
- Industrial automation control system (IACS) - the people, hardware, software, and policies involved in operating the industrial process and influencing its safe, secure, and reliable operation.
- Management of change (MOC) - the process of controlling and documenting changes in a system so the equipment under control keeps operating properly.
- Work process - a set of related or interacting procedures that transforms inputs into outputs.
Who uses SIST EN IEC 63082-1:2027?
SIST EN IEC 63082-1:2027 is used by enterprises, owner operators, facilities, suppliers, EPC contractors, and service providers that manage intelligent devices in industrial environments. It is also relevant to engineers, maintenance teams, operations staff, cybersecurity specialists, information managers, and quality or asset-management personnel.
They use it to agree on IDM vocabulary, set up IDM programs, define roles and work processes, coordinate supplier support, plan device life-cycle activities, and manage information and risk consistently across facilities. The document is especially relevant where intelligent devices interact with IACS, maintenance systems, and remote support tools.
Which standards are used with SIST EN IEC 63082-1:2027?
SIST EN IEC 63082-1:2027 names IEC 63082-2:2024 as its normative reference. That companion part provides the requirements and recommendations that sit behind the concepts and terminology defined in Part 1.
The document also points readers to related standards that support specific topics:
- IEC 62443 series - cybersecurity guidance for technical capabilities, procedures, and security levels.
- IEC 62264-1 - the functional hierarchy context used when describing intelligent devices and their place in automation systems.
- IEC 62382 - loop checking, referenced when the document discusses loops and commissioning activities.
- IEC 61804, IEC 62453, and IEC 62769 - device data, descriptors, and terminology for intelligent device communication and access.
What does the SIST EN IEC 63082-1:2027 document contain?
The document includes UML-based material in Annex A, with class diagrams and activity diagrams used to explain documentation and work-process relationships. Annex C gives the structure of IDM program documents and shows how policy, risk assessment, objectives, programs, work processes, procedures, and tasks fit together.
Annex E provides a criticality-ranking approach, including severity and probability categories and a risk matrix used for hazard assessment and maintenance planning. Annex F discusses IDM benefits and the business case, Annex G looks at maintenance history and failure consequences, and Annex H organizes IDM notifications by source, delivery method, and response type.
Across the main clauses, the document provides process-oriented content for design, commissioning, operations, maintenance, turnaround work, supplier support, and information control. That makes it useful for planning, audits, implementation reviews, and training where intelligent devices have to be managed over long facility life cycles.
Relations
- Effective Date
- 17-Mar-2026
Get Certified
Connect with accredited certification bodies for this standard

DVS-ZERT GmbH
German welding certification society.
CARES (UK Certification Authority for Reinforcing Steels)
UK certification for reinforcing steels and construction.

EWF/IIW (European/International Welding Federation)
International welding personnel certification.
Sponsored listings
Frequently Asked Questions
SIST EN IEC 63082-1:2027 is a draft published by the Slovenian Institute for Standardization (SIST). Its full title is "Intelligent device management - Part 1: Concepts and terminology (IEC 63082-1:2025)". This standard covers: This part of IEC 63082 defines the concepts and terminology necessary to understand and communicate effectively about intelligent device management (IDM). This document explains the relationship between IDM and other existing asset management standards. Additionally, this document describes principles and defines organizational and functional structures associated with IDM. This document also introduces the concept of IDM program for coordination of multiple stakeholders.
This part of IEC 63082 defines the concepts and terminology necessary to understand and communicate effectively about intelligent device management (IDM). This document explains the relationship between IDM and other existing asset management standards. Additionally, this document describes principles and defines organizational and functional structures associated with IDM. This document also introduces the concept of IDM program for coordination of multiple stakeholders.
SIST EN IEC 63082-1:2027 is classified under the following ICS (International Classification for Standards) categories: 25.040.40 - Industrial process measurement and control. The ICS classification helps identify the subject area and facilitates finding related standards.
SIST EN IEC 63082-1:2027 has the following relationships with other standards: It is inter standard links to SIST EN IEC 63082-2:2024. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
SIST EN IEC 63082-1:2027 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.
Standards Content (Sample)
Contents
- 1 Scope
- 2 Normative references
- 3 Terms, definitions, and abbreviated terms
- 3.1 Terms and definitions
- 3.1.1 activity
- 3.1.2 alarm
- 3.1.3 alarm management
- 3.1.4 alert
- 3.1.5 apparatus
- 3.1.6 asset
- 3.1.7 asset management
- 3.1.8 calibration
- 3.1.9 certification
- 3.1.10 commissioning
- 3.1.11 configuration database
- 3.1.12 corrective action
- 3.1.13 covert fault
- 3.1.14 critical infrastructure
- 3.1.15 criticality
- 3.1.16 decommissioning
- 3.1.17 device
- 3.1.18 device configuration
- 3.1.19 device life cycle
- 3.1.20 device monitoring
- 3.1.21 device template
- 3.1.22 diagnostics
- 3.1.23 enterprise
- 3.1.24 enterprise infrastructure
- 3.1.25 equipment
- 3.1.26 facility
- 3.1.27 facility implementation project
- 3.1.28 failure
- 3.1.29 fault
- 3.1.30 foundational requirement
- 3.1.31 host system
- 3.1.32 incipient fault
- 3.1.33 industrial automation control system
- 3.1.34 inspection
- 3.1.35 installation
- 3.1.36 intelligent device
- 3.1.37 intelligent device management
- 3.1.38 intelligent device management program
- 3.1.39 intelligent device management system
- 3.1.40 life cycle
- 3.1.41 loop
- 3.1.42 maintenance
- 3.1.43 management of change
- 3.1.44 management program
- 3.1.45 monitor, verb
- 3.1.46 normal operation
- 3.1.47 notification
- 3.1.48 off-line diagnostics
- 3.1.49 operator
- 3.1.50 organization
- 3.1.51 overt fault
- 3.1.52 owner operator
- 3.1.53 preventive maintenance
- 3.1.54 proactive maintenance
- 3.1.55 procedure
- 3.1.56 prompt
- 3.1.57 provisioning
- 3.1.58 quality management system
- 3.1.59 requirement
- 3.1.60 resources
- 3.1.61 risk
- 3.1.62 risk analysis
- 3.1.63 risk assessment
- 3.1.64 risk evaluation
- 3.1.65 risk management
- 3.1.66 status
- 3.1.67 status notification
- 3.1.68 supplier
- 3.1.69 task
- 3.1.70 testing
- 3.1.71 tool
- 3.1.72 toolkit
- 3.1.73 typical configuration data set
- 3.1.74 turnaround
- 3.1.75 user
- 3.1.76 work process
INTRODUCTION The purpose of the IEC 63082 series is to define an environment that enables the effective use of intelligent devices. The IEC 63082 series defines common concepts, terminology, and management activities.
Intelligent device management (IDM) represents activities for managing intelligent devices through the facility life cycle and does not imply a particular asset management tool or set of those tools. Hardware and software tools are necessary to support work processes and procedures, but specification of the tools is not a part of the IEC 63082 series. IDM is one of many enterprise programs. IDM activities optimize the value from intelligent devices and supports integration of data from the production level with business systems. IDM is consistent with smart manufacturing initiatives.
Several stakeholders are responsible for delivering successful intelligent device management, including engineering, procurement, and construction (EPC) contractors, owner operators, system integrators, suppliers, and consultants.
The IEC 63082 series is not intended to replace or contradict other standards, for example IEC 61511 (all parts) for safety instrumented systems and IEC 62443 (all parts) for cybersecurity.
While the work processes and implementation practices specified in the IEC 63082 series might be used for non-automation equipment with some diagnostic capability, the IEC 63082 series does not cover these equipment types.
The IEC 63082 series consists of the following parts:
- IEC 63082-1: Concepts and terminology;
- IEC 63082-2: Requirements and recommendations.
This document defines intelligent device management concepts and terminology necessary for in-depth understanding and effective communication. It gives the basic concepts of how intelligent devices can be managed and an overview of how this device management works throughout the facility life cycle. This document provides basic knowledge to understand the concepts of intelligent device management necessary to implement an IDM program. IEC 63082-2:2024 provides provisions (requirements and recommendations) in the body of the document. Additional information on why a requirement is given are provided in its Annex A. The information provided in this document is intended to be useful as background material for better understanding of the provisions in IEC 63082-2. As both IEC 63082-1 and IEC 63082-2 are based on the same lifecycle model effort has been made to align the clauses/headings between the two documents, thus making it easier for the reader to correlate content.
oSIST prEN IEC 63082-1:2026
1 Scope
This part of IEC 63082 defines the concepts and terminology necessary to understand and communicate effectively about intelligent device management (IDM). This document explains the relationship between IDM and other existing asset management standards. Additionally, this document describes principles and defines organizational and functional structures associated with IDM. This document also introduces the concept of IDM program for coordination of multiple stakeholders.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.
IEC 63082-2:2024, Intelligent device management - Part 2: Requirements and recommendations
3 Terms, definitions, and abbreviated terms
For the purposes of this document, the following terms, definitions, and abbreviated terms apply. ISO and IEC maintain terminology databases for use in standardization at the following addresses:
- IEC Electropedia: available at https://www.electropedia.org/
- ISO Online browsing platform: available at https://www.iso.org/obp
3.1 Terms and definitions
3.1.1 activity
set of actions that consume time and resources (3.1.60) and whose performance is necessary to achieve, or contribute to, the realization of one or more objectives Note 1 to entry: It includes work processes (3.1.76), procedures (3.1.55), and tasks (3.1.69). [SOURCE: ISO/IEC TR 24766:2009, 3.1, modified – "outcomes" replaced with "objectives"]
3.1.2 alarm
notification (3.1.47) to the operator (3.1.49) of an equipment (3.1.25) malfunction, process deviation, or abnormal condition requiring a unique, timely, and documented (predetermined) response from the operator [SOURCE: IEC 62682:2022, 3.1.7, modified – "audible and/or visible means of indicating" was replaced with "notification", "unique," was added, "and documented (predetermined)" was added, and "from the operator" was added]
3.1.3 alarm management
collection of processes and practices for determining, documenting, designing, operating, monitoring, and maintaining alarm (3.1.2) systems [SOURCE: IEC 62682:2022, 3.1.17]
oSIST prEN IEC 63082-1:2026
3.1.4 alert
notification (3.1.47) to responsible persons of an abnormal condition that can require actions with a time tolerance much longer than for alarms (3.1.2) Note 1 to entry: "Responsible persons" can include operators (3.1.49), maintenance (3.1.42) personnel, and engineering personnel.
3.1.5 apparatus
device (3.1.17) or assembly of devices which can be used as an independent unit for specific functions EXAMPLE Apparatus includes intelligent measuring and control devices, inspection (3.1.34) and testing (3.1.70) devices, and host systems (3.1.31).
[SOURCE: IEC 60050-151:2001, 151-11-22, modified – Note was deleted, and EXAMPLE was added]
3.1.6 asset
physical entity or digital entity that has value to an individual, an organization or a government [SOURCE: ISO/IEC 20924:2018, 3.1.4]
3.1.7 asset management
coordinated activities of an organization (3.1.50) to ensure the intended capability of assets (3.1.6) is available Note 1 to entry: The capability of an asset is dynamic and asset management will respond to satisfy changing objectives.
[SOURCE: ISO 55000:2014, 3.3.1, modified – "to realize value from assets" was replaced with "to ensure the intended capability of assets is available", Notes to entry were deleted, a new Note 1 to entry was added]
3.1.8 calibration
procedure (3.1.55) of checking and when necessary adjusting (by comparison with a reference standard) the accuracy of a measuring instrument [SOURCE: ISO 15378:2017, 3.3.2, modified – "process" was replaced with "procedure" and "or" was replaced with "and when necessary"]
3.1.9 certification
procedure (3.1.55) by which a third party gives documented assurance that a product, process, or service conforms to specified requirements (3.1.59) [SOURCE: IEC 61400-22:2010,3.4, modified – "written" was replaced with "documented" and "also known as conformity assessment" was deleted]
3.1.10 commissioning
procedure (3.1.55) prior, or related, to the handing over of a product ready for putting into service, including final acceptance testing (3.1.70), the handing over of all documentation relevant to the use of the product and, if necessary, instructing personnel [SOURCE: IEC 82079-1:2012, 3.3, modified – "procedures" was replaced with "procedure"]
oSIST prEN IEC 63082-1:2026
3.1.11 configuration database
structured collection of parameter settings for intelligent devices (3.1.36)
3.1.12 corrective action
action to eliminate the cause of a non-fulfilment of a requirement (3.1.59) and to prevent recurrence [SOURCE: ISO 55000:2014, 3.4.1, modified – "nonconformity" was replaced with "nonfulfilment of a requirement", Note 1 to entry was deleted]
3.1.13 covert fault
fault (3.1.29) in relation to hardware and software, undetected by the diagnostics (3.1.22), proof tests, operator (3.1.49) intervention (for example physical inspection (3.1.34) and manual tests), or through normal operation (3.1.46) Note 1 to entry: These are sometimes called latent faults or unknown faults. [SOURCE: IEC 61508-4:2010, 3.8.9 covert, modified – "fault" and "and software" were added, "diagnostic test" was replaced with "diagnostics", EXAMPLE was deleted, Note 1 to entry was added]
3.1.14 critical infrastructure
sectors whose assets (3.1.6), technologies, services, systems, and networks, whether physical or virtual, are considered vital to a nation in that their incapacitation or destruction would have a debilitating effect on security, national economic security, national public health or safety
3.1.15 criticality
degree of risk (3.1.61) represented by specified set of levels
3.1.16 decommissioning
act of taking an engineered system or component out of service, render it inoperative, dismantle and decontaminate it [SOURCE: ISO 27914:2017, 3.13, modified – "decommission" was replaced with "decommissioning", change "take" was replaced with "act of taking"]
3.1.17 device
independent physical entity capable of performing one or more specified functions in a particular context and delimited by its interfaces [SOURCE: IEC 61499-1:2012, 3.29, modified – Note 1 to entry was deleted]
3.1.18 device configuration
procedure (3.1.55) that loads parameters into an intelligent device (3.1.36) to define its function
3.1.19 device life cycle
period of time over which a device (3.1.17) with a specific model code is developed, brought to market and eventually removed from the market
oSIST prEN IEC 63082-1:2026
3.1.20 device monitoring
monitor (3.1.45) that tracks behaviour of a device (3.1.17), providing notifications (3.1.47) of events for the device and for all calls associated with the device [SOURCE: ISO/IEC TR 18053:2000, 3.141, modified – term "Device-Type Monitor" was replaced with "device monitoring", "A" was removed]
3.1.21 device template
set of predefined parameters which characterize a specific device (3.1.17) release for a particular type of application Note 1 to entry: Device templates are normally prepared by the device supplier (3.1.68).
3.1.22 diagnostics
automated function which detects faults (3.1.29), malfunctions, deviations, and/or variations of hardware or software Note 1 to entry: Diagnostics can be initiated manually for off-line diagnostics (3.1.48). Note 2 to entry: "Diagnostic" is used for an adjective and as a generic word.
3.1.23 enterprise
group of organizations (3.1.50) sharing a set of goals and objectives to offer products or services or both [SOURCE: ISO 14258:1998, 2.1.1, modified – "a" was deleted]
3.1.24 enterprise infrastructure
basic physical and organizational structures needed for operations of an enterprise (3.1.23)
3.1.25 equipment
single apparatus (3.1.5) or set of devices (3.1.17) or apparatuses, or the set of main devices of an installation (3.1.35), or all devices necessary to perform a specific task (3.1.69) EXAMPLE Intelligent measuring and control devices, inspection (3.1.34) and testing (3.1.70) devices, and host systems (3.1.31).
[SOURCE: IEC 60050-151:2001, 151-11-25, modified – Note was deleted, EXAMPLE was added]
3.1.26 facility
physical entity that is built, constructed, installed or established to perform some particular function or to serve or facilitate some particular end EXAMPLE A plant, factory, mill, and site.
[SOURCE: IEC TR 62066:2002, 3.6, modified – parentheses were removed, EXAMPLE was added]
3.1.27 facility implementation project
set of activities to put into practice before the facility (3.1.26) starts or continues its intended service
oSIST prEN IEC 63082-1:2026
3.1.28 failure
loss of the ability to perform as required Note 1 to entry: A failure of an item is an event that results in a fault (3.1.29) of that item. Note 2 to entry: Qualifiers, such as catastrophic, critical, major, minor, marginal and insignificant, can be used to categorize failures according to the severity of consequences, the choice and definitions of severity criteria depending upon the field of application.
Note 3 to entry: Failure could lead to loss of a single function of an item (e.g. secondary function such as diagnostics (3.1.22)) not impacting the primary function of the item.
Note 4 to entry: For this definition "failure" refers to failure of "a device" (3.1.17). [SOURCE: IEC 60050-192:2015, 192-03-01, modified – <of an item> was deleted, Note 3 to entry was modified, Note 4 to entry was added]
3.1.29 fault
inability to perform as required, due to an internal state Note 1 to entry: A fault of an item results from a failure (3.1.28), either of the item itself, or from a deficiency in an earlier stage of the life cycle (3.1.40), such as specification, design, manufacture or maintenance (3.1.42). Note 2 to entry: Qualifiers, such as specification, design, manufacture, maintenance, or misuse, can be used to indicate the cause of the fault.
Note 3 to entry: For this definition "fault" refers to fault of "a device" (3.1.17). [SOURCE: IEC 60050-192:2015, 192-04-01, modified – "of an item" was deleted, Note 2 to entry was modified, Note 3 and Note 4 to entry was deleted, and new Note 3 to entry was added]
3.1.30 foundational requirement
requirement (3.1.59) that serves as a basis for derivation of detailed requirements EXAMPLE Management of risk (3.1.61), management of functionality and performance, management of change (3.1.43).
Note 1 to entry: Foundational requirements might not be directly actionable, but their derived requirements can be a basis for action.
3.1.31 host system
functions or tools (3.1.71) that digitally communicate with intelligent devices (3.1.36) Note 1 to entry: Functions include automated fault (3.1.29) handling, management of notifications (3.1.47), and configuration management of intelligent devices.
Note 2 to entry: Functions and tools can be provided on one or more host systems.
3.1.32 incipient fault
imperfection in the state or condition of a device (3.1.17) so that a degraded performance or critical failure (3.1.28) might eventually be the expected result if corrective action(s) (3.1.12) is (are) not taken [SOURCE: ISO 14224:2016, 3.40, modified – term "incipient failure" was replaced with "incipient fault", "an item" was replaced with "a device", "or critical failure might (or might not)" was replaced with "performance or critical failure might", and "actions are" was replaced with "action(s) is (are)"]
oSIST prEN IEC 63082-1:2026
3.1.33 industrial automation control system
IACS collection of personnel, hardware, software and policies involved in the operation of the industrial process and that can affect or influence its safe, secure and reliable operation [SOURCE: ISA-62443-3-3:2013 [3.1.29]]
3.1.34 inspection
action comprising careful scrutiny of a device (3.1.17) and its immediate environment in order to arrive at a reliable conclusion as to the condition of a device [SOURCE: IEC 60050-426:2008, 426-14-02, modified – "an item" was replaced with "a device" and "carried out either without dismantling, or with the addition of partial dismantling as required, supplemented by means such as measurement," was replaced with "and its immediate environment"]
3.1.35 installation
one apparatus (3.1.5) or a set of devices (3.1.17) and/or apparatuses associated in a given location to fulfil specified purposes, including all means for their satisfactory operation [SOURCE: IEC 60050-151:2001, 151-11-26]
3.1.36 intelligent device
configurable device (3.1.17) having digital communication with supplemental functions such as diagnostics (3.1.22) in addition to its basic purpose EXAMPLE 1 Process connected devices, which are in level 1 of the IEC 62264 functional hierarchy, such as smart instruments, valves and actuators, analysers, custody transfer meters, electrical breakers, and transformers. EXAMPLE 2 Control devices, which are in level 2 of the IEC 62264 functional hierarchy, such as PLCs, data acquisition subsystems, and dedicated HMI devices.
EXAMPLE 3 Other devices such as RTUs, managed industrial network routers, converters and gateways.
3.1.37 intelligent device management
IDM formal coordinated business objectives, organizations (3.1.50), work processes (3.1.76), and resources (3.1.60) to realize value from intelligent devices (3.1.36) Note 1 to entry: IDM program (3.1.38) is used to achieve setup (provisioning (3.1.57), engineering, configuration and calibration (3.1.8)), optimization, diagnostics (3.1.22), maintenance (3.1.42) and disposal of intelligent devices over the facility life cycle (3.1.40) based on asset management (3.1.7). Note 2 to entry: IDM can be applied to multiple facilities of an enterprise (3.1.23) or a facility (3.1.26) of an enterprise.
[SOURCE: definition of "asset management" by ISO 55000:2014, 3.3.1, modified – "assets" was replaced with "intelligent devices" and Notes to entry were added]
3.1.38 intelligent device management program
IDM program set of coordinated policies, strategies, activities, resources (3.1.60), and organization (3.1.50) to achieve IDM (3.1.37) objectives Note 1 to entry: IDM program is a type of enterprise (3.1.23) program.
oSIST prEN IEC 63082-1:2026
3.1.39 intelligent device management system
IDMS type of host system (3.1.31) that facilitates a seamless exchange and retrieval of information about intelligent devices (3.1.36) between multiple functional departments and across an organization's (3.1.50) facilities, while also allowing live access to device (3.1.17) information and configuration Note 1 to entry: An IDMS is not based on a specific technology nor a predetermined/rigid architecture.
3.1.40 life cycle
finite set of generic phases and steps which a system will go through over its entire life history EXAMPLE A typical system life cycle consists of: concept and definition; design and development; construction, installation (3.1.35) and commissioning (3.1.10); operation and maintenance (3.1.42); mid-life upgrading, or life extension; and decommissioning (3.1.16) and disposal.
[SOURCE: IEC 60050-192:2015, 192-01-09, modified – "may" was replaced with "will" and EXAMPLE added]
3.1.41 loop
all the hardware and software necessary to work together for the measurement, communication, and/or control of a process variable Note 1 to entry: The loop consists of all associated components and functions including sensor, logic, control, actuator, and HMI.
Note 2 to entry: Loop checking is described in IEC 62382.
3.1.42 maintenance
activity (3.1.1) including supervisory actions, intended to retain an item in, or restore it to, a state in which it can perform a required function [SOURCE: IEC 60050-192:2015, 192-06-01, modified – "combination of all technical and management actions" was replaced with "activity including supervisory actions,", "as required" with "a required function", and Note 1 was removed]
3.1.43 management of change
MOC process of controlling and documenting any change in a system to maintain the proper operation of the equipment (3.1.25) under control [SOURCE: IEC 62443-2-1:2010, 3.1.8, modified – "change management" was replaced with "management of change"]
3.1.44 management program
activity (3.1.1) that oversees a group of related projects and/or work processes (3.1.76) in a way that provides benefits and control not available by running each activity individually and independently
oSIST prEN IEC 63082-1:2026
3.1.45 monitor, verb
acquire a quantity value continuously or sequentially in order to check whether it is within normal operating limits and, where appropriate, to signal if it passes its tolerance boundaries [SOURCE: IEC 60050:2015 351-43-03]
...