EN 14035-15:2003/AC:2005
(Corrigendum)Fireworks - Part 15: Fountains - Specification and test methods
Fireworks - Part 15: Fountains - Specification and test methods
TC - Update of list in foreword, normative ref., 4.3.3, Clause 6, 8.3.2.4, etc.
Feuerwerkskörper - Teil 15: Fontänen - Anforderungen und Prüfverfahren
Artifices de divertissement - Partie 15: Fontaines - Spécifications et méthodes d'essai
Ognjemet - 15. del: Fontane - Specifikacija in preskusne metode
General Information
Relations
Standards Content (Sample)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Fireworks - Part 15: Fountains - Specification and test methodsOgnjemet - 15. del: Fontane - Specifikacija in preskusne metodeArtifices de divertissement - Partie 15: Fontaines - Spécifications et méthodes d'essaiFeuerwerkskörper - Teil 15: Fontänen - Anforderungen und PrüfverfahrenTa slovenski standard je istoveten z:EN 14035-15:2003/AC:2005SIST EN 14035-15:2003/AC:2005en71.100.30ICS:SLOVENSKI
STANDARDSIST EN 14035-15:2003/AC:200501-oktober-2005
EUROPEAN STANDARDNORME EUROPÉENNEEUROPÄISCHE NORMEN 14035-15:2003/ACJanuary 2005Janvier 2005Januar 2005ICS 71.100.30English versionVersion FrançaiseDeutsche FassungFireworks - Part 15: Fountains - Specification and test methodsArtifices de divertissement - Partie 15:Fontaines - Spécifications et méthodesd'essaiFeuerwerkskörper - Teil 15: Fontänen -Anforderungen und PrüfverfahrenThis corrigendum becomes effective on 26 January 2005 for incorporation in the three officiallanguage versions of the EN.Ce corrigendum prendra effet le 26 janvier 2005 pour incorporation dans les trois versionslinguistiques officielles de la EN.Die Berichtigung tritt am 26.Januar 2005 zur Einarbeitung in die drei offiziellen Sprachfassungen derEN in Kraft.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMITÉ EUROPÉEN DE NORMALISATIONEUROPÄISCHES KOMITEE FÜR NORMUNGManagement Centre: rue de Stassart, 36
B-1050 Brussels© 2005 CENAll rights of exploitation in any form and by any means reserved worldwide for CEN national Members.Tous droits d'exploitation sous quelque forme et de quelque manière que ce soit réservés dans le monde entier auxmembres nationaux du CEN.Alle Rechte der Verwertung, gleich in welcher Form und in welchem Verfahren, sind weltweit den nationalen Mitgliedernvon CEN vorbehalten.Ref. No.:EN 14035-15:2003/AC:2005 D/E/F
Foreword
‘prEN 14035-5, Fireworks – Part 5: Batteries or combinations – Specification and test methods’ has to be changed into ‘prEN 14035-5, Fireworks – Part 5: Batteries and combinations – Specification and test methods’. ‘prEN 14035-31, Fireworks – Part 31: Shells-in-mortars – Specification and test methods’ has to be changed into ‘prEN 14035-31, Fireworks – Part 31: Shell-in-mortars – Specification and test methods’.
Delete:
prEN 14035-14, Fireworks – Part 14: Flying squibs – Specification and test methods prEN 14035-16, Fireworks – Part 16: Friction ignited flash bangers – Specification and test methods prEN 14035-26, Fireworks – Part 26: Percussion caps – Specification and test methods prEN 14035-32, Fireworks – Part 32: Snaps – Specification and test methods
Add: prEN 14035-38, Fireworks – Part 38: Shot tubes – Specification and test methods
2 Normative references
Change: 'ISO 2439' into 'EN-ISO 2439'
4.3.3 Initial fuse protected by primary pack
Change: Title: 'Initial fuse protected by primary pack' into 'Initial fuse protected by primary pack or selection pack'
First sentence: 'The fountain shall be contained in a primary pack conforming to clause 6' into 'The fountain shall be contained in a primary pack or selection pack conforming to clause 6'
6 Primary pack
Change: Title: 'Primary pack' into 'Primary pack or selection pack'
First sentence 'If a primary pack is required to protect the initial fuse(s) of the fountain(s) (see 4.3.3), the primary pack shall completely enclose the fountain(s).' into 'If a primary pack or selection pack is required to protect the initial fuse(s) of the fountain(s) (see 4.3.3), the pack shall completely enclose the fountain(s).'
8.4.4 Procedure
Change: ‘Apply the ignition source (8.4.3.4) and at the same instant start the timing device (8.4.3.1). Observe the intermediate time at the moment the initial fuse ignites. If the initial fuse fails to ignite within 5 s do not proceed with further testing of that fountain. Otherwise, stop the timing device when the fountain starts to produce its first principal effect. Record whether the initial fuse ignited within 5 s and whether the ignition of the initial fuse was visible.’ into ‘Apply the ignition source (8.4.3.4) and at the same instant start the timing device (8.4.3.1). Stop the intermediate time at the moment the fountain ignites. If the fountain fails to ignite within 5 s do not proceed with further testing of that fountain. Otherwise, stop the timing device when the fountain starts
8.5.3.3
Delete: After the fountain has ceased to function start the timing device (8.5.2.1) immediately and record whether any flames caused by the functioning of the fountain are extinguished within 60,0 s after the fountain has ceased to function.
8.8 Labelling (type test and batch test)
Change: 'Check conformity to 7.6.2 and 7.7.1, for example by comparing the type sizes on the actual label with a transparent copy made from Figure 2' into 'Check conformity to 7.6.2 and 7.7.1, for example by comparing the type sizes on the actual label with a transparent copy
...
Questions, Comments and Discussion