Safety of primary and secondary lithium cells and batteries during transport

IEC 62281:2012(E) specifies test methods and requirements for primary and secondary (rechargeable) lithium cells and batteries to ensure their safety during transport other than for recycling or disposal. Requirements specified in this standard do not apply in those cases where special provisions given in the relevant regulations, listed in 7.3, provide exemptions. This second edition cancels and replaces the first edition, published in 2004, and constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - distinction between small and large cell or battery by gross mass rather than by lithium content or Watt-hour rating ('nominal' energy); - combination of the no mass loss (NM) and no leakage (NL) criteria into one criteria (NL); - extension of an acceptable mass loss of 0,2 % from 5 g to 75 g mass of a cell or battery; - reduction of large batteries to be tested under tests T 1 to T 5 and T 8 from 4 to 2 samples; - reduction of test samples required for small battery assemblies (5.2.2); - reduction of the vibration amplitude to 2 g for large batteries in T-3 vibration test method; - replacement of the impact test by the crush test for prismatic, pouch, button, and coin cells as well as cylindrical cells with no more than 20 mm in diameter. Keywords: safety during transportation, primary and secondary (rechargeable) lithium cells and batteries

Sicherheit von Primär- und Sekundär-Lithiumbatterien beim Transport

Sécurité des piles et des accumulateurs au lithium pendant le transport

L'IEC 62281:2012 spécifie les méthodes d'essai et les exigences pour les éléments et les batteries de piles et d'accumulateurs au lithium afin de s'assurer de leur sécurité pendant les opérations de transport autres que celles relatives à leur recyclage ou leur mise au rebut. Les exigences spécifiées dans cette norme ne s'appliquent pas aux cas pour lesquels des dispositions spéciales prévues dans les réglementations appropriées, énumérées en 7.3, accordent des exemptions. Cette deuxième édition annule et remplace la première édition parue en 2004, et constitue une révision technique. Cette édition inclut les modifications techniques majeures suivantes par rapport à l'édition précédente: - distinction entre petit et grand élément ou petite et grande batterie faite par la masse brute plutôt que par le contenu de lithium ou la valeur assignée en wattheure (énergie "nominale"); - regroupement des critères "pas de perte de masse" (NM) et "pas de fuite" (NF) en un seul critère (NL); - extension d'une perte de masse acceptable de 0,2 % d'une masse de 5 g à 75 g d'un élément ou d'une batterie; - réduction du nombre d'échantillons passant de 4 à 2 pour les grandes batteries à soumettre aux essais T-1 à T-5 et T-8; - réduction du nombre d'échantillons d'essai requis pour les assemblages de petites batteries (5.2.2); - réduction de l'amplitude de vibration à 2 g pour les grandes batteries dans la méthode d'essai de vibration T-3; - remplacement de l'essai d'impact par l'essai d'écrasement pour les éléments parallélépipédiques, éléments en sachet et éléments bouton ainsi que pour les éléments cylindriques de diamètre inférieur à 20 mm. Mots clés: la sécurité pendant les opérations de transport, piles et d'accumulateurs au lithium penchant

Varnost primarnih in sekundarnih litijevih členov in baterij med transportom

Ta mednarodni standard določa preskusne metode ter zahteve za primarne in sekundarne (polnilne) litijeve člene in baterije za zagotovitev njihove varnosti med transportom, ne vključuje pa recikliranja oziroma odlaganja. Zahteve, opredeljene v tem standardu, ne veljajo za primere, v katerih posebne določbe, podane v ustreznih predpisih, navedenih v točki 7.3, določajo izjeme.

General Information

Status
Withdrawn
Publication Date
07-Mar-2013
Withdrawal Date
08-Jan-2016
Technical Committee
Drafting Committee
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
10-Jan-2020
Completion Date
10-Jan-2020

Relations

Buy Standard

Standard
EN 62281:2013
English language
28 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 62281:2013
01-junij-2013
1DGRPHãþD
SIST EN 62281:2004
9DUQRVWSULPDUQLKLQVHNXQGDUQLKOLWLMHYLKþOHQRYLQEDWHULMPHGWUDQVSRUWRP
Safety of primary and secondary lithium cells and batteries during transport
Sicherheit von Primär- und Sekundär-Lithiumbatterien beim Transport
Sécurité des piles et des accumulateurs au lithium pendant le transport
Ta slovenski standard je istoveten z: EN 62281:2013
ICS:
29.220.10 3ULPDUQLþOHQLLQEDWHULMH Primary cells and batteries
SIST EN 62281:2013 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST EN 62281:2013

---------------------- Page: 2 ----------------------

SIST EN 62281:2013

EUROPEAN STANDARD
EN 62281

NORME EUROPÉENNE
March 2013
EUROPÄISCHE NORM

ICS 29.220.10 Supersedes EN 62281:2004


English version


Safety of primary and secondary lithium cells and batteries
during transport
(IEC 62281:2012)


Sécurité des piles et des accumulateurs Sicherheit von Primär- und Sekundär-
au lithium pendant le transport Lithiumbatterien beim Transport
(CEI 62281:2012) (IEC 62281:2012)





This European Standard was approved by CENELEC on 2013-01-09. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,
Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,
Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Management Centre: Avenue Marnix 17, B - 1000 Brussels


© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 62281:2013 E

---------------------- Page: 3 ----------------------

SIST EN 62281:2013
EN 62281:2013 - 2 -

Foreword
The text of document 35/1303/FDIS, future edition 2 of IEC 62281, prepared by IEC TC 35 "Primary cells
and batteries" and SC 21A, "Secondary cells and batteries containing alkaline or other non-acid
electrolytes", of IEC TC 21, "Secondary cells and batteries" was submitted to the IEC-CENELEC parallel
vote and approved by CENELEC as EN 62281:2013.
The following dates are fixed:
• latest date by which the document has (dop) 2013-10-09
to be implemented at national level by
publication of an identical national
standard or by endorsement
• latest date by which the national (dow) 2016-01-09
standards conflicting with the

document have to be withdrawn

This document supersedes EN 62281:2004.
EN 62281:2013 includes the following significant technical changes with respect to EN 62281:2004:
a) distinction between small and large cell or battery by gross mass rather than by lithium content or Watt-
hour rating (“nominal” energy);
b) combination of the no mass loss (NM) and no leakage (NL) criteria into one criteria (NL);
c) extension of an acceptable mass loss of 0,2 % from 5 g to 75 g mass of a cell or battery;
d) reduction of large batteries to be tested under tests T-1 to T-5 and T-8 from 4 to 2 samples;
e) reduction of test samples required for small battery assemblies (5.2.2);
f) reduction of the vibration amplitude to 2 g for large batteries in T-3 vibration test method;
g) replacement of the impact test by the crush test for prismatic, pouch, button, and coin cells as well as
cylindrical cells with no more than 20 mm in diameter.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such patent
rights.
Endorsement notice
The text of the International Standard IEC 62281:2012 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:
IEC 60086-4 NOTE  Harmonized as EN 60086-4.
I
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.