Communication networks and systems for power utility automation - Part 4: System and project management

Kommunikationsnetze und -systeme für die Automatisierung in der elektrischen Energieversorgung - Teil 4: System- und Projektverwaltung

Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 4: Gestion du système et gestion de projet

Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije - 4. del: Sistemsko in projektno upravljanje - Dopolnilo A1

General Information

Status
Published
Publication Date
17-Dec-2020
Current Stage
6060 - Document made available - Publishing
Start Date
18-Dec-2020
Completion Date
18-Dec-2020

Relations

Buy Standard

Amendment
EN 61850-4:2011/A1:2021 - BARVE
English language
21 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 61850-4:2011/A1:2021
01-februar-2021
Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije -
4. del: Sistemsko in projektno upravljanje - Dopolnilo A1
Communication networks and systems for power utility automation - Part 4: System and
project management
Kommunikationsnetze und -systeme in Stationen - Teil 4: System- und Projektverwaltung
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques
- Partie 4: Gestion du système et gestion de projet
Ta slovenski standard je istoveten z: EN 61850-4:2011/A1:2020
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
SIST EN 61850-4:2011/A1:2021 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST EN 61850-4:2011/A1:2021

---------------------- Page: 2 ----------------------
SIST EN 61850-4:2011/A1:2021


EUROPEAN STANDARD EN 61850-4:2011/A1

NORME EUROPÉENNE

EUROPÄISCHE NORM
December 2020
ICS 33.200

English Version
Communication networks and systems for power utility
automation - Part 4: System and project management
(IEC 61850-4:2011/A1:2020)
Réseaux et systèmes de communication pour Kommunikationsnetze und -systeme für die
l'automatisation des systèmes électriques - Partie 4: Automatisierung in der elektrischen Energieversorgung -
Gestion du système et gestion de projet Teil 4: System- und Projektverwaltung
(IEC 61850-4:2011/A1:2020) (IEC 61850-4:2011/A1:2020)
This amendment A1 modifies the European Standard EN 61850-4:2011; it was approved by CENELEC on 2020-12-08. CENELEC
members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this amendment the
status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This amendment exists in three official versions (English, French, German). A version in any other language made by translation under the
responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as
the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the
Netherlands, Norway, Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.


European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2020 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
 Ref. No. EN 61850-4:2011/A1:2020 E

---------------------- Page: 3 ----------------------
SIST EN 61850-4:2011/A1:2021
EN 61850-4:2011/A1:2020 (E)
European foreword
The text of document 57/2256/FDIS, future IEC 61850-4/A1, prepared by IEC/TC 57 "Power systems
management and associated information exchange" was submitted to the IEC-CENELEC parallel vote
and approved by CENELEC as EN 61850-4:2011/A1:2020.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2021-09-08
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2023-12-08
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
Endorsement notice
The text of the International Standard IEC 61850-4:2011/A1:2020 was approved by CENELEC as a
European Standard without any modification.
2

---------------------- Page: 4 ----------------------
SIST EN 61850-4:2011/A1:2021
EN 61850-4:2011/A1:2020 (E)
Annex ZA
(normative)

Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1  Where an International Publication has been modified by common modifications, indicated by (mo
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.