Abstract

This document specifies general and basic requirements for planning railway operation during predictable natural hazards, with a focus on heavy rainfall and strong wind, to reduce their impact on railway operation. This document does not apply to regions where the consequences of the addressed predictable natural hazards for railway operation are low or non-existent. This document includes measures directly related to railway operation to reduce the impact in the event of predictable natural hazards. However, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

Status
Not Published
Current Stage
6000 - International Standard under publication - 60 Publication
Start Date
27-Oct-2026

Buy Documents

Draft

ISO/FDIS 22083 - Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards

Release Date:17-Aug-2026
English language (21 pages)
sale 15% off
sale 15% off
Draft

REDLINE ISO/FDIS 22083 - Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards

Release Date:17-Aug-2026
English language (21 pages)
sale 15% off
sale 15% off
Draft

ISO/FDIS 22083 - Applications ferroviaires — Exigences générales et essentielles pour la planification de l'exploitation ferroviaire en cas de catastrophes naturelles prévisibles

Release Date:28-Sep-2026
French language (24 pages)
sale 15% off
sale 15% off

ISO 22083 is an International Organization for Standardization (ISO) standard for railway applications. It gives general and basic requirements for planning railway operation when predictable natural hazards occur, with a focus on heavy rainfall and strong wind. The document is for operators who need a structured way to monitor conditions, decide operational restrictions, inspect the network, and resume regular service.

What does ISO 22083 specify?

ISO 22083 specifies a general concept and basic requirements for planning railway operation during predictable natural hazards, especially heavy rainfall and strong wind. It is written to reduce the impact of those hazards on railway operation by organizing the operator’s actions before, during, and after an event.

ISO 22083 excludes regions where the consequences of the addressed hazards are low or non-existent, and it does not define how such regions are identified. It also covers only measures directly related to railway operation. Passenger safety measures and protection against railway-operational damage are outside its scope, so residual risk can remain.

The document is organized into these main clauses and annexes:

PartWhat it covers
Clause 4Five cyclic stages for planning railway operation
Clause 5General concepts, basic plans, and procedure development
Clause 6Railway operation for strong wind and heavy rainfall
Annex AExamples of monitoring systems used in some countries
Annex BExamples of the five stages for strong wind
Annex CExamples of the five stages for heavy rainfall

What are the key requirements of ISO 22083?

ISO 22083 requires operators to build a staged process for unpredictable operating conditions that are still forecastable. The core idea is simple: monitor, decide, restrict if needed, inspect, and then resume when it is safe to do so.

The five cyclic stages are the backbone of the document

Clause 4 sets out five cyclic stages: monitoring, decision for operational restriction, implementation of operational restriction, inspection and decision for resumption, and resumption of regular operation. Clause 5 says operators shall implement these stages in order and in a timely manner.

In practice, this means the response is not ad hoc. A railway operator needs a repeatable sequence so staff know who acts, when they act, and what information triggers the next step.

Operators need a basic plan before the event happens

Clause 5.2 says operators shall develop a basic plan for railway operation during predictable natural hazards. The plan can consider traffic frequency, passenger density, infrastructure vulnerability, economic and social impact, past or predicted events, damage history, line speed, and cost effectiveness.

This matters because the same rainfall or wind condition may require different responses on different lines. The plan helps the operator set a consistent policy before conditions worsen.

Procedures must fit the organization and be shared

Clause 5.3 says the operational procedures should reflect the local organization, responsibilities, and communication chain. The document also says the developed procedures should be shared among the concerned operators, because one event can involve several parties.

For practical use, this means the railway must define who monitors, who decides, who communicates restrictions, who inspects, and who authorizes resumption. Training and dissemination are part of making the procedure usable in a real event.

Monitoring must deliver usable information quickly

Clause 5.3.3 requires operators to determine how to obtain hazard information quickly and how to distribute it accurately to those responsible for restriction decisions. Clause 6 then gives specific examples for wind speed, rainfall amount, and condition changes such as slope failure or scouring around bridge piers and abutments.

In practice, the operator needs a reliable information path, not only sensors. The standard allows direct reports from personnel, systems installed by the operator, and flash reports from other organizations.

Decision thresholds must be predefined

Clause 5.3.4 says decision threshold(s) shall be set appropriately, considering the monitoring method, the hazard impact on railway operation, the possibility of damage, and past information on hazards and damage. Automatic systems may support the decision.

This means the operator should not wait for a crisis to decide when to restrict service. The threshold is the rule that converts data into action, such as speed restriction, rerouting, or suspension.

Strong wind and heavy rainfall each need hazard-specific controls

Clause 6.2 says operators shall monitor wind along the wayside on exposed sections, decide operational restrictions using wind-speed information, and inspect and decide on resumption after the event. Clause 6.3 says the same overall logic applies to heavy rainfall, with rainfall amount as a key input and condition monitoring used where necessary.

For wind, the focus is on derailment and overturning risk. For rainfall, the focus includes flooding, slope failure, and bridge-related damage. The operator therefore needs hazard-specific thresholds and procedures, not one generic rule for all weather.

Resumption depends on inspection and remaining danger

Clauses 4.5, 5.3.6, 5.3.7, 6.2.5 to 6.2.6, and 6.3.5 to 6.3.6 require inspection of railway facilities before regular operation returns. The operator must confirm whether damage exists and whether any danger remains.

In practice, service should resume only when the inspection results support it and the operator judges that the remaining damage is acceptable for operation. The document also emphasizes communication of the inspection result and the decision to the personnel involved.

What terms does ISO 22083 define?

ISO 22083 defines key terms so operators use the same language for hazard planning and response.

  • natural hazard - a geological or meteorological phenomenon that can damage infrastructure or cause loss of life over a large area.
  • predictable natural hazard - a natural hazard whose occurrence can be predicted to some extent from prior information.
  • railway operation - the control and management of the railway service, including infrastructure, traffic management, signalling, rolling stock, and transport services by rail.
  • operational restriction - a speed restriction, rerouting, or operation suspension used to improve safety or reduce natural-hazard risk.
  • operational condition - the operational mode based on the permitted running speed of a train on a section of the network.
  • operator - the party responsible for railway operation.
  • threshold - a pre-defined value that determines when an operational restriction is implemented.
  • stage - one step in the cyclic actions taken in response to predictable natural hazards.

Who uses ISO 22083?

ISO 22083 is used by railway operators, infrastructure managers, traffic controllers, and other parties responsible for railway operation. It is also relevant to teams that monitor weather and track conditions, decide restrictions, perform inspections, and authorize resumption.

In practice, the document supports operations, safety management, maintenance planning, and emergency coordination. It is especially useful where rainfall and wind can affect line safety and service continuity.

Which standards are used with ISO 22083?

ISO 22083 has no normative references. The bibliography names ISO 22888:2020, which is the related ISO document for planning railway operation in the event of earthquakes.

What does the ISO 22083 document contain?

ISO 22083 contains a five-stage planning model, hazard-specific application text for strong wind and heavy rainfall, and annexes with implementation examples. Figure 1 shows the cycle from regular operation to restriction and back to regular operation.

Annex A gives examples of monitoring systems used in China, Italy, and Japan. Annex B shows how the five stages are applied to strong wind in those countries, and Annex C does the same for heavy rainfall, including examples based on rainfall amount monitoring and state-change monitoring.

The document also includes practical wording on monitoring methods, communication paths, decision thresholds, inspection activities, and the conditions for returning to regular operation. That makes it a planning and procedure document for operational use, not a product specification or test standard.

Buy Documents

Draft

ISO/FDIS 22083 - Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards

Release Date:17-Aug-2026
English language (21 pages)
sale 15% off
sale 15% off
Draft

REDLINE ISO/FDIS 22083 - Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards

Release Date:17-Aug-2026
English language (21 pages)
sale 15% off
sale 15% off
Draft

ISO/FDIS 22083 - Applications ferroviaires — Exigences générales et essentielles pour la planification de l'exploitation ferroviaire en cas de catastrophes naturelles prévisibles

Release Date:28-Sep-2026
French language (24 pages)
sale 15% off
sale 15% off

Get Certified

Connect with accredited certification bodies for this standard

Great Wall Tianjin Quality Assurance Center

Established 1993, first batch to receive national accreditation with IAF recognition.

CNAS China Verified

Hong Kong Quality Assurance Agency (HKQAA)

Hong Kong's leading certification body.

HKAS Hong Kong Verified

Innovative Quality Certifications Pvt. Ltd. (IQCPL)

Known for integrity, providing ethical & impartial Assessment & Certification. CMMI Institute Partner.

NABCB India Verified

Sponsored listings

Frequently Asked Questions

ISO 22083 is a draft published by the International Organization for Standardization (ISO). Its full title is "Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards". This standard covers: This document specifies general and basic requirements for planning railway operation during predictable natural hazards, with a focus on heavy rainfall and strong wind, to reduce their impact on railway operation. This document does not apply to regions where the consequences of the addressed predictable natural hazards for railway operation are low or non-existent. This document includes measures directly related to railway operation to reduce the impact in the event of predictable natural hazards. However, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

This document specifies general and basic requirements for planning railway operation during predictable natural hazards, with a focus on heavy rainfall and strong wind, to reduce their impact on railway operation. This document does not apply to regions where the consequences of the addressed predictable natural hazards for railway operation are low or non-existent. This document includes measures directly related to railway operation to reduce the impact in the event of predictable natural hazards. However, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

ISO 22083 is classified under the following ICS (International Classification for Standards) categories: 03.220.30 - Transport by rail. The ICS classification helps identify the subject area and facilitates finding related standards.

ISO 22083 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 natural hazard, noun
  • 3.2 predictable natural hazard, noun
  • 3.3 state, noun
  • 3.4 railway operation, noun
  • 3.5 operational restriction, noun
  • 3.6 operational condition, noun
  • 3.7 regular condition, noun
  • 3.8 irregular condition, noun
  • 3.9 operator, noun
  • 3.10 threshold, noun
  • 3.11 stage, noun
  • 3.12 monitoring, noun
  • 3.13 decision, noun
  • 3.14 inspection, noun
  • 3.15 implementation
  • 3.16 resumption, noun
  • 4 Stages for planning of railway operation
  • 4.1 General
  • 4.2 Stage 1: Monitoring of predictable natural hazards
  • 4.3 Stage 2: Decision for operational restriction
  • 4.4 Stage 3: Implementation of operational restriction
  • 4.5 Stage 4: Inspection and decision for resumption
  • 4.6 Stage 5: Resumption of regular operation
  • 5 Concepts for planning of railway operation
  • 5.1 General
  • 5.2 Basic plans for planning railway operation during predictable natural hazards
  • 5.3 Development of procedures for railway operation
  • 6 Railway operation in the events of specific predictable natural hazards
  • 6.1 General
  • 6.2 Strong wind
  • 6.3 Heavy rainfall
  • Annex A
  • Annex B
  • Annex C
  • Bibliography

Introduction

Railway operators aim to provide safe and reliable transport service for customers (i.e. passengers and consignors) and railway owners. This aim should be achieved as far as possible even under irregular railway operational conditions, such as predictable natural hazards. This is applies not only to areas which have experienced predictable natural hazards, but also to areas without previous experience of significant events of predictable natural hazards, but for which a risk of experiencing predictable natural hazards exists. Therefore, in order to reduce a customer’s risk in relation to predictable natural hazards, such as a risk to safety and reliability of the railway service, and as a result of the lack of available standards, guidance and other documentation for such measures in railway operation, this document was developed.

FINAL DRAFT International Standard ISO/FDIS 22083:2026(en) Railway applications — General and basic requirements for planning railway operation in the event of predictable natural hazards

1 Scope

This document specifies general and basic requirements for planning railway operation during predictable natural hazards, with a focus on heavy rainfall and strong wind, to reduce their impact on railway operation. This document does not apply to regions where the consequences of the addressed predictable natural hazards for railway operation are low or non-existent.

This document includes measures directly related to railway operation to reduce the impact in the event of predictable natural hazards. However, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

2 Normative references

There are no normative references in this document.

3 Terms and definitions

For the purposes of this document, the following terms and definitions apply. ISO and IEC maintain terminology databases for use in standardization at the following addresses:

  • ISO Online browsing platform: available at https:// www .iso .org/ obp
  • IEC Electropedia: available at https:// www .electropedia .org/

3.1 natural hazard, noun

geological or meteorological naturally occurring phenomenon that can cause damage to physical infrastructure or loss of life in a large area EXAMPLE Earthquakes, volcanic eruptions, landslides, tsunamis, strong winds, sudden gusts, heavy rainfalls, floods, heavy snows, dense fogs and abnormally high temperatures amongst others.

3.2 predictable natural hazard, noun

natural hazard (3.1) whose occurrence can be predicted to some extent based on prior information

3.3 state, noun

condition of a factor at a point in time that can affect the railway facilities or rolling stock and that can impede the safe operation of trains

ISO/FDIS 22083:2026(en)

3.4 railway operation, noun

control and management of the railway service Note 1 to entry: In this document, railway operation includes the responsibility for managing and maintaining railway infrastructure, traffic management and signalling, provision and maintenance of rolling stock, and services for the transport of goods, passengers, or both by rail. In countries where these responsibilities are provided by different parties, the tasks defined in this document should be divided accordingly. [1] [SOURCE: ISO 22888:2020 , 3.1]

3.5 operational restriction, noun

application of a speed restriction, re-routing or operation suspension to trains according to relevant operational procedures in order to improve the safety of the trains or to reduce the risk due to natural hazards

3.6 operational condition, noun

operational mode which depends on the permitted running speed of a train on a particular section of the network Note 1 to entry: There are two types of operational mode: regular condition (3.7) and irregular condition (3.8).

3.7 regular condition, noun

condition in which trains can operate at the maximum permitted line speed [1] [SOURCE: ISO 22888:2020 , 3.5]

3.8 irregular condition, noun

condition in which an operational restriction (3.5) is enforced due to an unusual situation [1] [SOURCE: ISO 22888:2020 , 3.6]

3.9 operator, noun

individual responsible for railway operation (3.4)

3.10 threshold, noun

pre-defined value that determines the implementation of the operational restriction (3.5) Note 1 to entry: A threshold can include observed values as well as predicted values.

3.11 stage, noun

step in a series of cyclic actions taken by the operator (3.9) to ensure safe railway operations (3.4) in response to predictable natural hazards (3.2)

3.12 monitoring, noun

continuous gathering of information related to predictable natural hazards (3.2) Note 1 to entry: Monitoring can be performed for detecting unusual states of factors, such as wind speed, rainfall amount, rainfall intensity, duration of rainfall or events which can be directly associated with the respective extreme weather, such as slope failure, scouring around bridge piers and abutments due to river swelling.

3.13 decision, noun

action taken based on judgement on changes to be made in operational conditions (3.6) based on monitoring (3.12) of meteorological parameters, state (3.3) changes, or both (such as rainfall amount and wind speed)

ISO/FDIS 22083:2026(en)

3.14 inspection, noun

process of checking the state (3.3) of the railway facilities by visiting the site or by other suitable means to see if the condition of the railway facilities causes any problems with train operations

3.15 implementation

process of changing the operational conditions (3.6) according to the decision (3.13) taken

3.16 resumption, noun

removal of an operational restriction (3.5) and return to regular train service

4 Stages for planning of railway operation

4.1 General

Clause 4 establishes the five cyclic stages for developing the measures necessary for railway operation during the time period of predictable natural hazards (see Figure 1):

  • stage 1: monitoring of predictable natural hazards;
  • stage 2: decision for operational restriction;
  • stage 3: implementation of operational restriction;
  • stage 4: inspection and decision for resumption;
  • stage 5: resumption of regular operation.

The stages given in Figure 1 refer to a series of actions implemented by operators for railway operation before, during and after a predictable natural hazard event. The condition switches at Stage 3 or 5 as shown in Figure 1.

ISO/FDIS 22083:2026(en) Key stage operational condition Figure 1 — Stages and conditions from regular conditions to operational restrictions caused by predictable natural hazards to the resumption of regular operation

4.2 Stage 1: Monitoring of predictable natural hazards

In stage 1, meteorological parameters, state changes, or both, are monitored.

4.3 Stage 2: Decision for operational restriction

In stage 2, a decision is taken on whether operational restrictions need to be implemented to ensure continued safe operation using the predictable natural hazard information obtained at stage 1.

4.4 Stage 3: Implementation of operational restriction

Stage 3 takes place when the operation of a train in regular condition is switched to its operation in irregular condition (speed restriction, rerouting or operational suspension) if such a decision has been taken in stage 2.

ISO/FDIS 22083:2026(en)

4.5 Stage 4: Inspection and decision for resumption

In stage 4, the condition of railway facilities are inspected to provide information on whether railway operation can be resumed under regular condition.

4.6 Stage 5: Resumption of regular operation

In stage 5, railway operation is returned to its regular condition based on the information gathered in stage 4.

5 Concepts for planning of railway operation

5.1 General

Operators should establish plans and management procedures for railway operation which can be applied to predictable natural hazards, such as heavy rainfall or strong wind. Operators shall implement the five cyclic stages in order and in a timely manner to ensure safe and stable train operations.

Operators should make every effort possible to minimize the risk to safety and maximize reliability of the railway service and should return to regular conditions when it is deemed safe to do so. NOTE Safety is not influenced by economic consideration. Reliability is possibly influenced by economic consideration and evaluation of financial loss.

5.2 Basic plans for planning railway operation during predictable natural hazards

Operators shall develop a basic plan which includes consideration of the factors necessary to develop procedures for railway operation during predictable natural hazards, such as heavy rainfall or strong wind. The basic plan may be adapted to the specific situation.

The basic plan can consider, for example, of:

  • traffic frequency;
  • passenger density;
  • infrastructure vulnerability;
  • economic and social impact;
  • history of either past events or predicted events, or both;
  • damage due to either past events or predicted events, or both;
  • line speed;
  • cost effectiveness.

5.3 Development of procedures for railway operation

5.3.1 General

While implementating each stage, operational procedures and general requirements for railway operation in a particular area, the organizational and responsibility chain practices in that area should also be considered.

ISO/FDIS 22083:2026(en) It is common for a predictable natural hazard event to involve not just one, but several operators in rail operations during the emergency situation. The developed procedures should thus be shared among the concerned operators who are responsible for each task.

In the procedures, information about the hazard can be communicated to the operators and passed on through operational restrictions, alarms, or both.

Operators can promote dissemination and training for the developed procedures to efficiently apply them in case of a real predictable natural hazard.

5.3.2 Factors considered for all stages

Provisions for each stage related to railway operation are shown in 5.3.3 to 5.3.7. Factors that are relevant to the management of railway operation can be considered if necessary, including:

  • corporate structure;
  • resourcing and staffing requirements;
  • tools, devices and equipment;
  • operational procedures;
  • emergency contact network among all concerned operators and relevant organizations;
  • communication procedures;
  • information indices (e.g. wind speed, wind direction, rainfall amount);
  • decision threshold(s);
  • objectives and roles of the concerned parties;
  • emergency response intervals for railway lines;
  • terrain and environment around railway lines; and
  • speed levels of railway lines.
5.3.3 Stage 1: Monitoring of predictable natural hazards

For the railway operation procedures, operators shall determine how to quickly obtain information on the natural hazards and should guarantee the means for distributing information accurately to the parties responsible for the decision for operational restriction.

Operators should determine methods and indicators for obtaining information on natural hazards and, where monitoring systems are available, on the railway system's response to events related to the hazard, using appropriate methods and frequencies.

In addition to the information obtained from monitoring activities and transmitted directly from personnel, operators may obtain information on events using a specific system, a flash report issued from other organisations, or a combination of these.

5.3.4 Stage 2: Decision for operational restriction

Operators shall consider how to determine the operational restriction. Operators should consider what information is needed to support their decisions, including the use of the information indices, where available.

Decision threshold(s) shall be set appropriately, considering the natural hazard monitoring method, the impact on railway operation due to predictable natural hazards, the possibility of damage to the railway facilities and the past information on the natural hazards and the damage to the facilities.

ISO/FDIS 22083:2026(en) An automatic system can be employed to support this decision process.

5.3.5 Stage 3: Implementation of operational restriction

Operators shall establish the procedure for switching the operational condition from regular to irregular when operational restrictions are required to maintain safe operation.

5.3.6 Stage 4: Inspection and decision for resumption

Operators shall establish appropriate inspection procedures which take into account the corporate structure and the resources required to restore a regular operating mode after a critical deviation of certain meteorological parameters, abnormal conditions, or both, have been detected along the line. Operators shall confirm whether the railway facility is damaged by events and whether any danger remains.

5.3.7 Stage 5: Resumption of regular operation

Operators shall develop a procedure for deciding that the resumption of regular operation is possible.

6 Railway operation in the events of specific predictable natural hazards

6.1 General

This clause describes the railway operations in the event of two predictable natural hazards, such as strong wind and heavy rainfall. Furthermore, it shows the railway damage expected from these predictable natural hazards and application of the railway operation referred to in Clause 4. The railway damage described herein is an example. Other types of railway damage can arise and the combined effects of these predictable natural hazards can cause additional or more severe damage.

A monitoring system can observe meteorological parameters and state changes that can affect railway operation; examples of the meteorological parameters include wind speed and rainfall amount and the state changes resulting from the natural hazards includes slope failure and scouring around bridge piers and abutments due to river swelling.

Furthermore, the five cyclic stages can be decided using data obtained by the monitoring system including meteorological data from public authorities.

See Annex A for examples of the monitoring systems used in some countries to decide operational restrictions using data.

6.2 Strong wind

6.2.1 General

Strong wind can cause significant damage to railway infrastructures and wayside installations, such as electric poles, noise barriers and track beds – also due to falling trees or blown objects, resulting in extensive disruptions of regular railway operation. The damage to railways caused by strong wind includes derailment and overturning of trains as well as damage and collapse of railway infrastructures. Implementation of the five cyclic stages related to strong wind are given for - China Clause B.1; - Italy in Clause B.2; and - Japan in Clause B.3.

Subclauses 6.2.2 to 6.2.6 show the five cyclic stages in order to implement the measures to reduce the impact of strong winds on railway operation.

ISO/FDIS 22083:2026(en)

6.2.2 Monitoring

Operators shall obtain information on wind along the wayside on the railway sections exposed to strong wind to support the decision stage and implement measures.

Operators should establish a method that monitors information on wind speed related to train derailment and overturning, and ensure a means to rapidly and accurately transmit the monitored information to those responsible for deciding operational restrictions.

When implementing the monitoring, operators shall maintain wind speed monitoring capabilities and a method of communicating wind speed information to constantly monitor the wind in the target area. In addition to the information obtained from monitoring activities and transmitted directly from personnel, operators may obtain information on events using a specific system installed by operators, a flash report issued from other organisations, or a combination of these.

6.2.3 Decision

Operators shall predefine how to decide operational restrictions. Decision threshold(s) shall be set based on meteorological information and actual phenomena, such as past data on wind speed values and wind hazard information and, if available, the risk assessment of train derailment and overturning.

Applicable threshold(s) should be set for each operational restriction level. Operators shall decide operational restrictions when the monitored wind speed exceeds the applicable threshold(s). An automatic system can be employed to support this decision process. Such a decision shall be communicated to the operation personnel involved.

6.2.4 Implementation of operational restriction

Operators shall define the procedure to switch the operation from 'regular' to 'irregular' if an operating restriction is deemed necessary, as per the process described in 6.2.3. Operators shall change the operational condition to irregular upon deciding operational restrictions. An automatic system can be employed to implement such operational restrictions. Such operational restrictions shall be communicated to the operation personnel involved.

...

Contents

  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 natural hazard, noun
  • 3.2 predictable natural hazard, noun
  • 3.3 state, noun
  • 3.4 railway operation, noun
  • 3.5 operational restriction, noun
  • 3.6 operational condition, noun
  • 3.7 regular condition, noun
  • 3.8 irregular condition, noun
  • 3.9 operator, noun
  • 3.10 threshold, noun
  • 3.11 stage, noun
  • 3.12 monitoring, noun
  • 3.13 decision, noun
  • 3.14 inspection, noun
  • 3.15 implementation
  • 3.16 resumption, noun
  • 4 Stages for planning of railway operation
  • 4.1 General
  • 4.2 Stage 1: Monitoring of predictable natural hazards
  • 4.3 Stage 2: Decision for operational restriction
  • 4.4 Stage 3: Implementation of operational restriction
  • 4.5 Stage 4: Inspection and decision for resumption
  • 4.6 Stage 5: Resumption of regular operation
  • 5 Concepts for planning of railway operation
  • 5.1 General
  • 5.2 Basic plan
  • 5.2 Basic plans for planning railway operation during predictable natural hazards
  • 5.3 Development of procedures for railway operation
  • 6 Railway operation in the events of specific predictable natural hazards
  • 6.1 General
  • 6.2 Strong wind
  • 6.3 Heavy rainfall
  • Annex A
  • Annex B
  • Annex C
  • Bibliography

Introduction

Railway operators aim to provide safe and reliable transport service for customers (i.e. passengers and consignors) and railway owners. This aim should be achieved as far as possible even under irregular railway operational conditions, such as predictable natural hazards. This is importantapplies not only forto areas which have experienced predictable natural hazards, but also forto areas without previous experience of significant events of predictable natural hazards, but for which a risk of experiencing predictable natural hazards exists. Therefore, in order to reduce a customer’s risk in relation to predictable natural hazards, such as a risk to safety and reliability of the railway service. This document was developed, and as a result of the lack of available standards, guidance and other documentation for such measures in railway operation, this document was developed.

ISO/FDIS 22083:2026(en) Railway applications — ConceptsGeneral and basic requirements for planning of railway operation in the eventsevent of predictable natural hazards

1 Scope

This document specifies general and basic requirements for planning railway operation during predictable natural hazards, with a focus on heavy rainfall and strong wind, to reduce their impact on railway operation. This document does not apply to regions where the consequences of the addressed predictable natural hazards for railway operation are low or non-existent. The definition of such regions is out of the scope of this document.

This document includes measures directly related to railway operation to reduce the impact in the eventsevent of predictable natural hazards. However, this document does not include specific measures which ensure passenger safety or which provide protection against railway-operational damage caused by the predictable natural hazards. Therefore, residual risk can remain.

2 Normative references

There are no normative references in this document.

3 Terms and definitions

For the purposes of this document, the following terms and definitions apply. ISO and IEC maintain terminology databases for use in standardization at the following addresses:

  • ISO Online browsing platform: available at https://www.iso.org/obp
  • IEC Electropedia: available at https://www.electropedia.org/

3.1 natural hazard, noun

geological or meteorological naturally occurring phenomenon that can cause damage to physical infrastructure or loss of life in a large area EXAMPLE earthquakesEarthquakes, volcanic eruptions, landslides, tsunamis, strong winds, sudden gusts, heavy rainfalls, floods, heavy snows, dense fogs and abnormally high temperatures amongst others.

3.2 predictable natural hazard, noun

natural hazard (3.1) whose occurrence can be predicted to some extent based on prior information

3.3 state, noun

condition of a factor at a point in time that can affect the railway facilities or rolling stock and that can impede the safe operation of trains

3.4 railway operation, noun

control and management of the railway service

ISO/FDIS 22083:2026(en) Note 1 to entry: In this document, railway operation includes the responsibility for managing and maintaining railway infrastructure, traffic management and signalling, provision and maintenance of rolling stock, and services for the transport of goods, passengers, or both by rail. In countries where these responsibilities are provided by different parties, the tasks defined in this document should be divided accordingly. [SOURCE: [1],, 3.1]

3.5 operational restriction, noun

application of a speed restriction, reroutingre-routing or operation suspension to trains according to relevant operational procedures in order to improve the safety of the trains or to reduce the risk due to natural hazards

3.6 operational condition, noun

operational mode which depends on the permitted running speed of a train on a particular section of the network Note 1 to entry: There are two types of operational mode: regular condition (3.7) and irregular condition (3.8) .).

3.7 regular condition, noun

condition in which trains can operate at the maximum permitted line speed [SOURCE: [1],, 3.5]

3.8 irregular condition, noun

condition in which an operational restriction (3.5) is enforced due to an unusual situation [SOURCE: [1],, 3.6]

3.9 operator, noun

partyindividual responsible for railway operation (3.4)

3.10 threshold, noun

pre-defined value that determines the implementation of the operational restriction (3.5) Note 1 to entry: A threshold can include observed values as well as predicted values.

3.11 stage, noun

each step in a series of cyclic actions taken by the operator (3.9) to ensure safe railway operations (3.4) in response to predictable natural hazards (3.2)

3.12 monitoring, noun

continuous gathering of information related to predictable natural hazards (3.2) Note 1 to entry: Monitoring can be performed for detecting unusual states of factors, such as wind speed, rainfall amount, rainfall intensity, duration of rainfall or events which can be directly associated with the respective extreme weather, such as slope failure, scouring around bridge piers and abutments due to river swelling.

ISO/FDIS 22083:2026(en)

3.13 decision, noun

action taken based on judgement on changes to be made in operational conditions (3.6) based on monitoring (3.12) of meteorological parameters, state (3.3) changes, or both (such as rainfall amount and wind speed)

3.14 inspection, noun

process of checking the state (3.3) of the railway facilities by visiting the site or by other suitable means to see if the condition of the railway facilities causes any problems with train operations

3.15 implementation

process of changing the operational conditions (3.6) according to the decision (3.13) taken

3.16 resumption, noun

removal of an operational restriction (3.5) and return to regular train service

4 Stages for planning of railway operation

4.1 General

4This clause establishes the five cyclic stages for developing the measures necessary for railway operation during the time period of predictable natural hazards (see Figure 1 ):

  • stage 1: monitoring of predictable natural hazards;
  • stage 2: decision for operational restriction;
  • stage 3: implementation of operational restriction;
  • stage 4: inspection and decision for resumption;
  • stage 5: resumption of regular operation.

The stages given in Figure 1 refer to a series of actions implemented by operators for railway operation before, during and after a predictable natural hazard event. The condition switches at Stage 3 or 5 as shown in Figure 1 .

ISO/FDIS 22083:2026(en)

ISO/FDIS 22083:2026(en)

Key The small black circles stages The broken line arrows stage operational conditionscondition Figure 1 — Stages and conditions from regular conditions to operational restrictions caused by predictable natural hazards to the resumption of regular operation

4.2 Stage 1: Monitoring of predictable natural hazards

In stage 1, meteorological parameters, state changes, or both, are monitored.

4.3 Stage 2: Decision for operational restriction

In stage 2, a decision is taken on whether operational restrictions need to be implemented to ensure continued safe operation using the predictable natural hazard information obtained at stage 1.

4.4 Stage 3: Implementation of operational restriction

Stage 3 takes place when the operation of a train in regular condition is switched to its operation in irregular condition (speed restriction, rerouting or operational suspension) if such a decision has been taken in stage 2.

ISO/FDIS 22083:2026(en)

4.5 Stage 4: Inspection and decision for resumption

In stage 4, the condition of railway facilities are inspected to provide information on whether railway operation can be resumed under regular condition.

4.6 Stage 5: Resumption of regular operation

In stage 5, railway operation is returned to its regular condition based on the information gathered atin stage 4.

5 Concepts for planning of railway operation

5.1 General

Operators should establish plans and management procedures for railway operation which can be applied to predictable natural hazards, such as heavy rainfall or strong wind. Operators shall implement the five cyclic stages in order and in a timely manner to ensure safe and stable train operations.

Operators should make every effort possible to minimize the risk to safety and maximize reliability of the railway service and should return to regular conditions when it is deemed safe to do so. NOTE Safety is not influenced by economic consideration. Reliability is possibly influenced by economic consideration and evaluation of financial loss.

5.2 Basic plan

5.2 Basic plans for planning railway operation during predictable natural hazards

Operators mayshall develop a basic plan which includes consideration of the factors necessary to develop procedures for railway operation during predictable natural hazards, such as heavy rainfall or strong wind. The basic plan may be adapted to the specific situation.

The basic plan may include considerationcan consider, for example, of:

  • traffic frequency;
  • passenger density;
  • infrastructure vulnerability;
  • economic and social impact;
  • history forof either past/ events or predicted events, or both;
  • damage due to either past/ events or predicted natural hazardsevents, or both;
  • line speed; and
  • cost effectiveness.

ISO/FDIS 22083:2026(en)

5.3 Development of procedures for railway operation

5.3.1 General

While implementation the specific stagesimplementating each stage, operational procedures and general requirements for railway operation in a particular area, the organizational and responsibility chain practices in that area should also be considered.

It is common for a predictable natural hazard event to involve not just one, but several operators in rail operations during the emergency situation. The developed procedures should thus be shared among the concerned operators who are responsible for each task.

In the procedures, information about the hazard can be communicated to the operators and passed on through operational restrictions, alarms, or both.

Operators can promote dissemination and training for the developed procedures to efficiently apply them in case of a real predictable natural hazard.

5.3.2 Factors considered for all stages

Provisions for each stage related to railway operation are shown in 5.3.35.3.3 to 5.3.75.3.7.. Factors that are relevant to the management of railway operation can be considered if necessary, including:

  • corporate structure;
  • resourcing and staffing requirements;
  • tools, devices and equipment;
  • operational procedures;
  • emergency contact network among all concerned operators and relevant organizations;
  • communication procedures;
  • information indices (e.g. wind speed, wind direction, rainfall amount);
  • decision threshold(s);
  • objectives and roles of the concerned parties;
  • emergency response intervals for railway lines;
  • terrain and environment around railway lines; and
  • speed levels of railway lines.
5.3.3 Stage 1: Monitoring of predictable natural hazards

For the railway operation procedures, operators shall determine how to quickly obtain information on the natural hazards and should guarantee the means for distributing information accurately to the parties responsible for the decision for operational restriction.

Operators should determine methods and indicators for obtaining information on natural hazards and, where monitoring systems are available, on the railway system's response to events related to the hazard, using appropriate methods and frequencies.

ISO/FDIS 22083:2026(en) In addition to the information obtained from monitoring activities and transmitted directly from personnel, operators may obtain information on events using a specific system, a flash report issued from other organisations, or a combination of these.

5.3.4 Stage 2: Decision for operational restriction

Operators shall consider how to determine the operational restriction. Operators should consider thewhat information necessaryis needed to support their decisions, including the use of the information indices, where available.

Decision threshold(s) shall be set appropriately, considering the natural hazard monitoring method, the impact on railway operation due to predictable natural hazards, the possibility of damage to the railway facilities and the past information on the natural hazards and the damage to the facilities. An automatic system can be employed to support this decision process.

5.3.5 Stage 3: Implementation of operational restriction

Operators shall establish the procedure for switching the operational condition from regular to irregular when operational restrictions are required to maintain safe operation.

5.3.6 Stage 4: Inspection and decision for resumption

Operators shall establish appropriate inspection procedures which take into account the corporate structure and the resources required to restore a regular operating mode after a critical deviation of certain meteorological parameters, abnormal conditions, or both, have been detected along the line. Operators shall confirm whether or not the railway facility is damaged by events and whether or not any danger remains.

5.3.7 Stage 5: Resumption of regular operation

Operators shall develop a procedure for deciding that the resumption of regular operation is possible.

6 Railway operation in the events of specific predictable natural hazards

6.1 General

This clause describes the railway operations in the event of two predictable natural hazards, such as strong wind and heavy rainfall. Furthermore, it shows the railway damage expected from these predictable natural hazards and application of the railway operation referred to in 4. The railway damage described herein is an example. Other types of railway damage can arise and the combined effects of these predictable natural hazards can cause additional or more severe damage.

A monitoring system can observe meteorological parameters and state changes that can affect railway operation; examples of the meteorological parameters include wind speed and rainfall amount and the state changes resulting from the natural hazards includes slope failure and scouring around bridge piers and abutments due to river swelling.

Furthermore, the five cyclic stages can be decided using data obtained by the monitoring system including meteorological data from public authorities.

See Annex A for examples of the monitoring systems used in some countries to decide operational restrictions using data.

ISO/FDIS 22083:2026(en)

6.2 Strong wind

6.2.1 General

Strong wind can cause significant damage to railway infrastructures and wayside installations, such as electric poles, noise barriers and track beds – also due to falling trees or blown objects, resulting in extensive disruptions of regular railway operation. The damage to railways caused by strong wind includes derailment and overturning of trains as well as damage and collapse of railway infrastructures. Implementation of the five cyclic stages related to strong wind are given infor - China B.1, see B.1;; - Italy in B.2, see B.2;; and - Japan in B.3, see B.3..

Subclauses 6.2.2 to 6.2.6Subclause from 6.2.2 to 6.2.6 shows show the five cyclic stages in order to implement the measures to reduce the impact of strong winds on railway operation.

6.2.2 Monitoring

Operators shall obtain information on wind along the wayside on the railway sections exposed to strong wind to support the decision stage and implement measures.

Operators should establish a method that monitors information on wind speed related to train derailment and overturning, and ensure a means to rapidly and accurately transmit the monitored information to those responsible for deciding operational restrictions.

When implementing the monitoring, operators shall maintain wind speed monitoring capabilities and a method of communicating wind speed information to constantly monitor the wind in the target area. In addition to the information obtained from monitoring activities and transmitted directly from personnel, operators may obtain information on events using a specific system installed by operators, a flash report issued from other organisations, or a combination of these.

6.2.3 Decision

Operators shall predefine how to decide operational restrictions. Decision threshold(s) shall be set based on meteorological information and actual phenomena, such as past data on wind speed values and wind hazard information and, if available, the risk assessment of train derailment and overturning.

Applicable threshold(s) should be set for each operational restriction level. Operators shall decide operational restrictions when the monitored wind speed exceeds the applicable threshold(s). An automatic system can be employed to support this decision process. Such a decision shall be communicated to the operation personnel involved.

6.2.4 Implementation of operational restriction

Operators shall define the procedure to switch the operation from 'regular' to 'irregular' if an operating restriction is deemed necessary, as per the process described in 6.2.3.

ISO/FDIS 22083:2026(en) Operators shall change the operational condition to irregular upon deciding operational restrictions. An automatic system can be employed to implement such operational restrictions. Such operational restrictions shall be communicated to the operation personnel involved.

...

Contents

  • Introduction
  • 1 Domaine d'application
  • 2 Références normatives
  • 3 Termes et définitions
  • 3.1 risque naturel
  • 3.2 risque naturel prévisible
  • 3.3 état
  • 3.4 exploitation ferroviaire
  • 3.5 restriction d'exploitation
  • 3.6 condition d'exploitation
  • 3.7 condition normale
  • 3.8 condition restrictive
  • 3.9 exploitant
  • 3.10 seuil
  • 3.11 étape
  • 3.12 surveillance
  • 3.13 décision
  • 3.14 inspection
  • 3.15 mise en œuvre
  • 3.16 reprise
  • 4 Étapes pour la planification de l'exploitation ferroviaire
  • 4.1 Généralités
  • 4.2 Étape 1: Surveillance des risques naturels prévisibles
  • 4.3 Étape 2: Décision de restriction d'exploitation
  • 4.4 Étape 3: Mise en œuvre de la restriction d'exploitation
  • 4.5 Étape 4: Inspection et décision concernant la reprise
  • 4.6 Étape 5: Reprise de l'exploitation normale
  • 5 Concepts liés à la planification de l'exploitation ferroviaire
  • 5.1 Généralités
  • 5.2 Plans de base pour la planification de l'exploitation ferroviaire en cas de risques
  • 5.3 Développement des procédures d'exploitation ferroviaire
  • 6 Exploitation ferroviaire lors d'événements liés à des risques naturels prévisibles
  • 6.1 Généralités
  • 6.2 Vents forts
  • 6.3 Fortes pluies
  • Annexe A
  • Annexe B
  • Annexe C
  • Bibliographie

Introduction

Les exploitants ferroviaires visent à fournir un service de transport sûr et fiable pour leurs clients (voyageurs et expéditeurs) et pour les propriétaires de chemins de fer. Il convient que cet objectif soit atteint dans la mesure du possible, même en situation perturbée de l'exploitation ferroviaire, notamment en lien avec des risques naturels prévisibles. Cela s'applique non seulement aux régions qui ont déjà connu des risques naturels prévisibles, mais aussi aux autres régions sans expérience préalable d'événements importants liés à des risques naturels prévisibles mais qui sont exposées au risque de rencontrer de tels événements. Le présent document a donc été élaboré afin de réduire l'exposition du client aux risques naturels prévisibles, notamment le risque pour la sécurité et la fiabilité du service ferroviaire, et afin de pallier l'absence de normes, de recommandations et d'autres documents de référence applicables à ces mesures dans le cadre de l'exploitation ferroviaire.

PROJET FINAL Norme internationale ISO/FDIS 22083:2026(fr) Applications ferroviaires — Exigences générales et essentielles pour la planification de l'exploitation ferroviaire en cas de catastrophes naturelles prévisibles

1 Domaine d'application

Le présent document définit les exigences générales et fondamentales pour la planification de l'exploitation ferroviaire en cas de risques naturels prévisibles, en se concentrant sur les fortes pluies et les vents forts, afin d'en réduire l'incidence sur l'exploitation ferroviaire.

Le présent document ne s'applique pas aux régions où les conséquences des risques naturels prévisibles abordés pour l'exploitation ferroviaire sont faibles ou inexistantes. Le présent document comprend des mesures directement liées à l'exploitation ferroviaire permettant de réduire l'incidence d'un événement lié à des risques naturels prévisibles. Cependant, le présent document n'inclut pas de mesures spécifiques assurant la sécurité des passagers ou protégeant contre les dommages de l'exploitation ferroviaire causés par les risques naturels prévisibles. Par conséquent, un risque résiduel peut subsister.

2 Références normatives

Le présent document ne contient aucune référence normative.

3 Termes et définitions

Pour les besoins du présent document, les termes et définitions suivants s'appliquent. L'ISO et l'IEC tiennent à jour des bases de données terminologiques destinées à être utilisées en normalisation, consultables aux adresses suivantes:

  • ISO Online browsing platform: disponible à l'adresse https:// www .iso .org/ obp
  • IEC Electropedia: disponible à l'adresse https:// www .electropedia .org/

3.1 risque naturel

phénomène naturel géologique ou météorologique pouvant causer des dommages aux infrastructures physiques ou des décès sur une grande surface EXEMPLE Tremblements de terre, éruptions volcaniques, glissements de terrain, tsunamis, vents forts, rafales soudaines, fortes pluies, inondations, fortes neiges, brouillards denses et températures anormalement élevées, entre autres.

3.2 risque naturel prévisible

risque naturel (3.1) dont l'occurrence peut être prédite dans une certaine mesure sur la base d'informations antérieures

3.3 état

condition d'un facteur à un moment donné qui peut compromettre les installations ferroviaires ou le matériel roulant et qui peut entraver l'exploitation sécurisée des trains

ISO/FDIS 22083:2026(fr)

3.4 exploitation ferroviaire

contrôle et gestion du service ferroviaire Note 1 à l'article: Dans le présent document, l'exploitation ferroviaire comprend la responsabilité de la gestion et de l'entretien de l'infrastructure ferroviaire, de la gestion du trafic et de la signalisation, de la fourniture et de l'entretien du matériel roulant et des services de transport ferroviaire de marchandises, de voyageurs, ou les deux. Dans les pays où ces responsabilités sont assumées par différentes parties, il convient de répartir les tâches définies dans le présent document en conséquence.

[1] [SOURCE: 3.1]

3.5 restriction d'exploitation

application d'une limitation de vitesse, d'une déviation ou d'une suspension d'exploitation du trafic ferroviaire selon des procédures d'exploitation pertinentes afin d'améliorer la sécurité des trains ou de réduire l'exposition à des risques naturels

3.6 condition d'exploitation

mode d'exploitation qui dépend de la vitesse de circulation admise d'un train sur une section définie du réseau Note 1 à l'article: Il existe deux types de modes d'exploitation: condition normale (3.7) et condition restrictive (3.8).

3.7 condition normale

état dans lequel les trains peuvent circuler à la vitesse maximale admise sur la ligne [1] [SOURCE: 3.5]

3.8 condition restrictive

condition dans laquelle une restriction d'exploitation (3.5) est appliquée en raison d'une situation inhabituelle [1] [SOURCE: 3.6]

3.9 exploitant

personne responsable de l'exploitation ferroviaire (3.4)

3.10 seuil

valeur prédéfinie qui détermine la mise en œuvre de la restriction d'exploitation (3.5) Note 1 à l'article: Un seuil peut inclure des valeurs observées ainsi que des valeurs prédites.

3.11 étape

étape dans une série d'actions cycliques entreprises par l'exploitant (3.9) pour assurer la sécurité de l'exploitation ferroviaire (3.4) en réponse à des risques naturels prévisibles (3.2)

3.12 surveillance

collecte continue d'informations liées aux risques naturels prévisibles (3.2) Note 1 à l'article: La surveillance peut être effectuée pour détecter des états de facteurs inhabituels, tels que la vitesse du vent, la quantité, l'intensité et la durée des pluies ou des événements qui peuvent être directement associés aux conditions météorologiques extrêmes respectives, tels que les glissements de terrain, l'érosion autour des piles et des culées de ponts en raison des crues.

ISO/FDIS 22083:2026(fr)

3.13 décision

mesure prise à partir d'un jugement sur les modifications à apporter aux conditions d'exploitation (3.6) en fonction de la surveillance (3.12) des paramètres météorologiques, des changements d'état (3.3), ou les deux (quantité de pluie et vitesse du vent, par exemple)

3.14 inspection

processus consistant à vérifier l'état (3.3) des installations ferroviaires au moyen de visites du site ou par d'autres moyens appropriés pour voir si l'état des installations ferroviaires cause des problèmes pour l'exploitation des trains

3.15 mise en œuvre

processus consistant à modifier les conditions d'exploitation (3.6) conformément à la décision (3.13) prise

3.16 reprise

suppression d'une restriction d'exploitation (3.5) et retour au trafic ferroviaire normal

4 Étapes pour la planification de l'exploitation ferroviaire

4.1 Généralités

L'Article 4 établit cinq étapes cycliques pour l'élaboration des mesures nécessaires à l'exploitation ferroviaire pendant la période de risques naturels prévisibles (voir la Figure 1):

  • étape 1: surveillance des risques naturels prévisibles;
  • étape 2: décision de restriction d'exploitation;
  • étape 3: mise en œuvre de la restriction d'exploitation;
  • étape 4: inspection et décision concernant la reprise;
  • étape 5: reprise de l'exploitation normale.

Les étapes représentées à la Figure 1 se réfèrent à une série d'actions mises en œuvre par les exploitants pour l'exploitation ferroviaire avant, pendant et après un risque naturel prévisible. La condition commute à l'étape 3 ou 5, comme cela est représenté à la Figure 1.

ISO/FDIS 22083:2026(fr) Légende étape condition d'exploitation Figure 1 — Étapes et conditions allant des conditions normales aux restrictions d'exploitation causées par des risques naturels prévisibles jusqu'à la reprise de l'exploitation normale

4.2 Étape 1: Surveillance des risques naturels prévisibles

L'étape 1 consiste à surveiller les paramètres météorologiques, les changements d'état, ou les deux.

4.3 Étape 2: Décision de restriction d'exploitation

L'étape 2 consiste à décider s'il est nécessaire de mettre en œuvre des restrictions d'exploitation pour assurer le maintien d'une exploitation sûre, en s'appuyant sur les informations relatives au risque naturel prévisible obtenues à l'étape 1.

4.4 Étape 3: Mise en œuvre de la restriction d'exploitation

L'étape 3 intervient lorsque l'exploitation d'un train en condition normale passe à une condition restrictive (limitation de vitesse, déviation ou suspension d'exploitation) si une telle décision a été prise au cours de l'étape 2.

ISO/FDIS 22083:2026(fr)

4.5 Étape 4: Inspection et décision concernant la reprise

L'étape 4 consiste à inspecter l'état des installations ferroviaires pour fournir des informations quant à la possibilité de reprendre l'exploitation ferroviaire en condition normale.

4.6 Étape 5: Reprise de l'exploitation normale

Au cours de l'étape 5, l'exploitation ferroviaire revient en condition normale compte tenu des informations recueillies lors de l'étape 4.

5 Concepts liés à la planification de l'exploitation ferroviaire

5.1 Généralités

Il convient que les exploitants établissent des plans et des procédures de gestion pour l'exploitation ferroviaire qui peuvent être appliqués aux risques naturels prévisibles, tels que de fortes pluies ou des vents forts.

Les exploitants doivent mettre en œuvre les cinq étapes cycliques dans l'ordre et en temps opportun pour assurer une exploitation ferroviaire sécurisée et stable.

Il convient que les exploitants engagent tous les efforts nécessaires pour réduire autant que possible les risques pour la sécurité et pour améliorer autant que possible la fiabilité du service ferroviaire; il convient également qu'ils reprennent l'exploitation normale après avoir jugé qu'ils pouvaient le faire en toute sécurité. NOTE La sécurité n'est pas influencée par des considérations économiques. La fiabilité est éventuellement influencée par des considérations économiques et par l'évaluation des pertes financières.

5.2 Plans de base pour la planification de l'exploitation ferroviaire en cas de risques

naturels prévisibles Les exploitants doivent élaborer un plan de base qui tienne compte des facteurs nécessaires à l'élaboration des procédures d'exploitation ferroviaire en cas de risques naturels prévisibles tels que les fortes pluies ou les vents forts. Le plan de base peut être adapté en fonction de la situation spécifique. Le plan de base peut, par exemple, prendre en compte les aspects suivants:

  • fréquence du trafic;
  • densité de passagers;
  • vulnérabilité de l'infrastructure;
  • impact économique et social;
  • historique des événements passés ou des événements prévus, ou des deux;
  • dommages résultant d'événements passés ou d'événements prévus, ou des deux;
  • vitesse de la ligne;
  • rapport coût-efficacité.

5.3 Développement des procédures d'exploitation ferroviaire

5.3.1 Généralités

Lors de la mise en œuvre de chaque étape, des procédures d'exploitation et des exigences générales pour l'exploitation ferroviaire dans une région particulière, il convient également de tenir compte des pratiques organisationnelles et de la chaîne de responsabilité dans cette région.

ISO/FDIS 22083:2026(fr) Il est courant pour un certain nombre d'exploitants dans l'exploitation ferroviaire d'être impliqués dans un risque naturel prévisible lors d'une situation d'urgence. Il convient alors de partager les procédures élaborées entre les exploitants concernés par leurs tâches respectives. Dans les procédures, les informations sur le risque peuvent être communiquées aux exploitants et transmises au moyen de restrictions d'exploitation, d'alarmes, ou des deux. Les exploitants peuvent promouvoir la diffusion et la formation des procédures développées afin de les appliquer efficacement en cas de risque naturel prévisible réel.

5.3.2 Facteurs à prendre en compte pour les étapes

Les dispositions relatives à chaque étape de l'exploitation ferroviaire sont indiquées de 5.3.3 à 5.3.7. Les facteurs pertinents pour la gestion de l'exploitation ferroviaire peuvent être pris en compte au besoin, notamment:

  • structure de l'entreprise;
  • besoins en ressources et en personnel;
  • outils, dispositifs et équipements;
  • procédures d'exploitation;
  • réseau de contact en cas d'urgence entre tous les exploitants concernés et les organisations pertinentes;
  • procédures de communication;
  • indices d'information (par exemple, vitesse du vent, direction du vent, quantité de pluie);
  • seuils de décision;
  • objectifs et rôles des parties concernées;
  • intervalles de réponse d'urgence pour les lignes ferroviaires;
  • terrain et environnement autour des lignes ferroviaires; et
  • niveaux de vitesse des lignes ferroviaires.
5.3.3 Étape 1: Surveillance des risques naturels prévisibles

Pour les procédures d'exploitation ferroviaire, les exploitants doivent déterminer comment obtenir rapidement des informations sur les risques naturels, et il convient qu'ils garantissent les moyens de diffuser avec précision les informations aux parties responsables de la décision concernant les restrictions d'exploitation.

Il convient que les exploitants déterminent les méthodes et les indicateurs pour obtenir des informations sur les risques naturels et, lorsque des systèmes de surveillance sont disponibles, sur la réponse du système ferroviaire aux événements liés au risque, en utilisant des méthodes et des fréquences appropriées. En plus des informations obtenues grâce aux activités de surveillance et transmises directement par le personnel, les exploitants peuvent obtenir des informations sur les événements en utilisant un système spécifique, un rapport flash émis par d'autres organisations, ou une combinaison de ces éléments.

5.3.4 Étape 2: Décision de restriction d'exploitation

Les exploitants doivent déterminer comment décider de la mise en place d'une restriction d'exploitation. Il convient que les exploitants tiennent compte de l'information nécessaire pour appuyer leurs décisions, y compris l'utilisation des indices d'information lorsqu'ils sont disponibles.

ISO/FDIS 22083:2026(fr) Le ou les seuils de décision doivent être fixés de manière appropriée, en tenant compte de la méthode de surveillance des risques naturels, de l'incidence des risques naturels prévisibles sur l'exploitation ferroviaire, de la possibilité de dommages aux installations ferroviaires et des informations passées sur les risques naturels et les dommages aux installations.

Un système automatique peut être utilisé pour soutenir ce processus décisionnel.

5.3.5 Étape 3: Mise en œuvre de la restriction d'exploitation

Les exploitants doivent établir la procédure pour changer la condition d'exploitation de normale à restrictive lorsque des restrictions d'exploitation sont nécessaires pour maintenir une exploitation sécurisée.

5.3.6 Étape 4: Inspection et décision concernant la reprise

Les exploitants doivent établir des procédures d'inspection appropriées qui tiennent compte de la structure de l'entreprise et des ressources nécessaires pour rétablir un mode d'exploitation normal après la détection d'une déviation importante de certains paramètres météorologiques, d'une condition anormale sur la ligne, ou des deux.

Les exploitants doivent vérifier si l'infrastructure ferroviaire a été endommagée par des événements et s'il subsiste un danger.

5.3.7 Étape 5: Reprise de l'exploitation normale

Les exploitants doivent élaborer une procédure pour décider s'il est possible de reprendre l'exploitation normale.

6 Exploitation ferroviaire lors d'événements liés à des risques naturels prévisibles

spécifiques

6.1 Généralités

Le présent article décrit l'exploitation ferroviaire en cas de survenue de deux risques naturels prévisibles, tels que des vents forts et de fortes pluies. Il montre en outre les dommages ferroviaires attendus en raison de ces risques naturels prévisibles et l'application de l'exploitation ferroviaire mentionnée à l'Article 4. Les dommages ferroviaires décrits ci-après sont un exemple. D'autres types de dommages ferroviaires peuvent survenir, et les effets combinés de ces risques naturels prévisibles peuvent provoquer des dommages supplémentaires ou plus graves.

Un système de surveillance peut observer des paramètres météorologiques et des changements d'état qui peuvent compromettre l'exploitation ferroviaire; les paramètres météorologiques comprennent, par exemple, la vitesse du vent et la quantité de pluie, et les changements d'état résultant des risques naturels incluent les glissements de terrain et l'érosion autour des piles et des culées de ponts en raison des crues. De plus, les cinq étapes cycliques peuvent être déterminées à l'aide des données obtenues par le système de surveillance, y compris les données météorologiques provenant des autorités publiques. Voir l'Annexe A pour des exemples des systèmes de surveillance utilisés dans certains pays pour décider des restrictions d'exploitation en utilisant des données.

6.2 Vents forts

6.2.1 Généralités

Des vents forts peuvent causer des dommages significatifs aux infrastructures ferroviaires et aux installations en bord de voie, telles que les poteaux électriques, les barrières antibruit et les lits de voie – également en raison de la chute d'arbres ou de l'envol d'objets, entraînant d'importantes perturbations de l'exploitation ferroviaire normale. Les dommages causés aux chemins de fer par des vents forts comprennent

ISO/FDIS 22083:2026(fr) le déraillement et le renversement des trains ainsi que les dommages et l'effondrement des infrastructures ferroviaires.

La mise en œuvre des cinq étapes cycliques liées aux vents forts est décrite pour - la Chine à l'Article B.1; - l'Italie à l'Article B.2; et - le Japon à l'Article B.3.

Les cinq étapes cycliques nécessaires à la mise en œuvre des mesures visant à réduire l'incidence des vents forts sur l'exploitation ferroviaire sont décrites de 6.2.2 à 6.2.6.

6.2.2 Surveillance

Les exploitants doivent obtenir des informations sur le vent en bord de voie sur les sections ferroviaires exposées à des vents forts pour soutenir l'étape de décision et mettre en œuvre des mesures. Il convient que les exploitants établissent une méthode de surveillance des informations sur la vitesse du vent liée au déraillement et au renversement des trains, et qu'ils garantissent un moyen de transmettre rapidement et avec précision les informations de surveillance aux preneurs de décisions sur les restrictions d'exploitation.

Lors de la mise en œuvre de la surveillance, les exploitants doivent maintenir des capacités de surveillance de la vitesse du vent et une méthode de communication des informations sur la vitesse du vent pour surveiller en permanence le vent dans la zone cible.

En plus des informations obtenues grâce aux activités de surveillance et transmises directement par le personnel, les exploitants peuvent obtenir des informations sur les événements en utilisant un système spécifique qu'ils ont eux-mêmes installé, un rapport flash émis par d'autres organisations, ou une combinaison de ces éléments.

...