(Main)Electromagnetic pulse welding - Part 5: Quality and inspection requirements
Electromagnetic pulse welding - Part 5: Quality and inspection requirements
This document specifies a method to determine the capability of a manufacturer to use the Electromagnetic pulse welding process for production of products of the specified quality. It specifies quality requirements but does not assign those requirements to any specific product or product group.
In this document, the term "aluminium" refers to aluminium and its alloys.
Schweißen und verwandte Verfahren - Elektromagnetisches Pulsschweißen - Teil 5: Qualitäts- und Prüfanforderungen
Dieses Dokument legt ein Verfahren fest, mit dem die Fähigkeit des Herstellers ermittelt werden kann, das elektromagnetische Pulsschweißen zur Fertigung von Produkten mit festgelegter Qualität einzusetzen. Es legt spezifische Qualitätsanforderungen fest, weist diese Anforderungen aber keiner spezifischen Produktgruppe zu.
Der Begriff "Aluminium" bezieht sich in diesem Dokument auf Aluminium und seine Legierungen.
Soudage par impulsion électromagnétique - Partie 5 : Exigences de qualité et de contrôle
Le présent document spécifie une méthode permettant de déterminer l'aptitude d'un fabricant à utiliser le procédé de soudage par impulsion électromagnétique pour la fabrication de produits ayant la qualité spécifiée. Il spécifie des exigences de qualité, mais n'assigne pas ces exigences à un produit spécifique ou à un groupe spécifique de produits.
Dans présent document, le terme « aluminium » se rapporte à l'aluminium et ses alliages.
Elektromagnetno utripno varjenje - 5. del: Zahteve za kakovost in kontrolo
Ta dokument določa metodo za ugotavljanje zmožnosti proizvajalca za uporabo elektromagnetnega utripnega varjenja pri proizvodnji izdelkov navedene kakovosti. Določa zahteve glede kakovosti, vendar teh zahtev ne omeji na določen izdelek oziroma skupino izdelkov.
V tem dokumentu se izraz »aluminij« navezuje na aluminij in njegove zlitine.
General Information
Standards Content (Sample)
SLOVENSKI STANDARD
01-september-2024
Elektromagnetno utripno varjenje - 5. del: Zahteve za kakovost in kontrolo
Electromagnetic pulse welding - Part 5: Quality and inspection requirements
Schweißen und verwandte Verfahren - Elektromagnetisches Pulsschweißen - Teil 5:
Qualitäts- und Prüfanforderungen
Soudage par impulsion électromagnétique - Partie 5 : Exigences de qualité et de
contrôle
Ta slovenski standard je istoveten z: EN 18007-5:2024
ICS:
25.160.10 Varilni postopki in varjenje Welding processes
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EN 18007-5
EUROPEAN STANDARD
NORME EUROPÉENNE
July 2024
EUROPÄISCHE NORM
ICS 25.160.10
English Version
Electromagnetic pulse welding - Part 5: Quality and
inspection requirements
Soudage par impulsion électromagnétique - Partie 5 : Elektromagnetisches Pulsschweißen - Teil 5: Qualitäts-
Exigences de qualité et de contrôle und Prüfanforderungen
This European Standard was approved by CEN on 7 June 2024.
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this
European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references
concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN
member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by
translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management
Centre has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway,
Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Türkiye and
United Kingdom.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2024 CEN All rights of exploitation in any form and by any means reserved Ref. No. EN 18007-5:2024 E
worldwide for CEN national Members.
Contents Page
European foreword . 3
Introduction . 4
1 Scope . 5
2 Normative references . 5
3 Terms and definitions . 5
4 Quality requirements . 5
4.1 General. 5
4.2 Welding personnel . 5
4.2.1 General. 5
4.2.2 Welding operators . 5
4.3 Inspection and testing personnel . 6
4.3.1 General. 6
4.3.2 Personnel performing non-destructive testing and visual testing . 6
4.3.3 Destructive testing personnel . 6
4.4 Equipment . 6
4.4.1 Suitability of equipment . 6
4.4.2 New equipment . 6
4.4.3 Reproducibility and validation tests for qualified machine welding settings . 6
4.4.4 Equipment maintenance . 7
4.4.5 Electromagnetic pulse welding tool . 7
4.5 Welding Procedure Specification (WPS) . 7
4.6 Pre-weld joint preparation and fit-up . 7
4.6.1 Joint preparation . 7
4.6.2 Pre-weld cleaning . 7
4.7 Welding . 8
4.8 Inspection and testing . 8
4.8.1 General. 8
4.8.2 Inspection and testing before welding . 8
4.8.3 Inspection and testing during welding . 8
4.8.4 Inspection and testing after welding and acceptance criteria . 8
4.8.5 Proof testing . 9
4.8.6 Damaged and non-conforming welds . 9
4.9 Identification and traceability . 9
Annex A (informative) Classification of geometric imperfections . 10
Bibliography . 28
European foreword
This document (EN 18007-5:2024) has been prepared by Technical Committee CEN/TC 121 “Welding
and allied processes”, the secretariat of which is held by AFNOR.
This European Standard shall be given the status of a national standard, either by publication of an
identical text or by endorsement, at the latest by January 2025, and conflicting national standards shall
be withdrawn at the latest by January 2025.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CEN shall not be held responsible for identifying any or all such patent rights.
The EN 18007 series of standards, under the general title Electromagnetic pulse welding, consists of the
following parts:
— Part 1: Welding knowledge, terminology and vocabulary,
— Part 2: Design of welded joints,
— Part 3: Qualification of welding operators and weld setters,
— Part 4: Specification and qualification of welding procedures,
— Part 5: Quality and inspection requirements.
Any feedback and questions on this document should be directed to the users’ national standards body.
A complete listing of these bodies can be found on the CEN website.
According to the CEN-CENELEC Internal Regulations, the national standards organisations of the
following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Croatia,
Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland,
Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Republic of North
Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Türkiye and the United
Kingdom.
Introduction
Electromagnetic pulse welding is an innovative solid-state welding technology that belongs to the group
of pressure welding processes and is based on the use of electromagnetic forces to deform, accelerate
and weld workpieces. No external heat source is used, the connection is only created by a high-velocity
impact.
The increasing use of the electromagnetic pulse welding process has created the need for a standard, to
ensure that the welding operations are carried out in the most effective manner and that appropriate
controls are performed on all aspects of the implementation.
To be effective, welded products should be free from problems in production and in service. To achieve
this goal, it is recommended to provide controls from the design phase through material selection, choice
of parameters, the fabrication itself, and inspection. For example, poor design can create serious and
costly difficulties in the workshop or in service. Incorrect process parameters and/or material selection
can result in welding defects. Welding procedures should be correctly formulated and approved to avoid
weld discontinuities. To ensure the manufacture of a quality product, management should understand
the causes of potential problems and implement appropriate inspection procedures and subsequent
quality measures. Supervision should be implemented to ensure that the specified quality is achieved.
1 Scope
This document specifies a method to determine the capability of a manufacturer to use the
electromagnetic pulse welding process for production of products of the specified quality. It specifies
quality requirements but does not assign those requirements to any specific product or product group.
In this document, the term “aluminium” refers to aluminium and its alloys.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
EN 18007-1, Electromagnetic pulse welding — Part 1: Welding knowledge, terminology and vocabulary
EN 18007-3, Electromagnetic pulse welding — Part 3: Qualification of welding operators and weld setters
EN ISO 9712, Non-destructive testing — Qualification and certification of NDT personnel
EN ISO 20807, Non-destructive testing — Qualification of personnel for limited application of non-
destructive testing
3 Terms and definitions
For the purposes of this document, the terms and definitions given in EN 18007-1 apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https://www.iso.org/obp
— IEC Electropedia: available at https://www.electropedia.org/
4 Quality requirements
4.1 General
These requirements relate only to those aspects of product quality that can be influenced by
electromagnetic pulse welding.
4.2 Welding personnel
4.2.1 General
Manufacturers shall have at their disposal sufficient and competent personnel for the planning,
performing and supervising of the electromagnetic pulse welding production operations in accordance
with specified requirements.
4.2.2 Welding operators
Welding operators shall be qualified in accordance with the specifications detailed in EN 18007-3.
Qualification records shall be kept up to date.
4.3 Inspection and testing personnel
4.3.1 General
The manufacturer shall have sufficient and competent personnel for the planning, performing, and
supervising of inspecting and testing operations during the production of electromagnetic pulse welded
parts, in accordance with specified requirements.
4.3.2 Personnel performing non-destructive testing and visual testing
Non-destructive and visual testing personnel shall be qualified in accordance with EN ISO 9712 or
EN ISO 20807. When the use of an examination method not presently incorporated in these
EN ISO standards is specified, the manufacturer shall be responsible for developing the training program,
written practice, examination, and practical demonstrations equivalent to the requirements of these
EN ISO standard(s). These shall establish the capability of the personnel performing the required
examination.
4.3.3 Destructive testing personnel
Personnel performing destructive testing shall be trained for those test methods.
4.4 Equipment
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.