Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipment

This standard gives guidance on writing the technical specification for the procurement of fuel preparation plant for solid, liquid and gaseous fuels associated with steam generating plant and flue gas treatment plant in the electrical power supply industry. This includes: feeders; pulverizers/mills, crushers; classifiers, pipework; pumps; heaters; filters; dampers; valves.

Leitfaden für die Beschaffung von Ausrüstungen für Kraftwerke - Teil 4-4: Nebenanlagen - Brennstoffaufbereitungsanlagen

Die vorliegende Beschaffungsrichtlinie gibt Hilfestellung bei der Erstellung dertechnischen Spezifikation für die Beschaffung von Brennstoffbehandlungsanlagen für feste, flüssige und gasförmige Brennstoffe im Zusammenhang mit Dampferzeugern und Rauchgasreinigungsanlagen in Kraftwerken. Eingeschlossen sind: Zuteiler; Mahlanlagen/Mühlen; Brecher; Sichter; Rohrleitungen; Pumpen; Vorwärmer; Filter; Klappen, Ventile.

Guide pour l'acquisition d'équipements destinés aux centrales de production d'électricité - Partie 4-4: Auxiliaires de chaudière - Systèmes de préparation du combustible

La présente norme donne des indications pour la rédaction des spécifications techniques concernant l'acquisition de systèmes de préparation des combustibles solides, liquides et gazeux associées aux générateurs de vapeur et aux systèmes de traitement des fumées dans les centrales de production d'électricité. Il s'agit de: chargeurs; pulvérisateurs, broyeurs et concasseurs; sélecteurs; canalisations; pompes; réchauffeurs; filtres; registres; vannes.

Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipment

General Information

Status
Published
Publication Date
13-Aug-2002
Withdrawal Date
27-Feb-2003
Current Stage
9060 - Closure of 2 Year Review Enquiry - Review Enquiry
Start Date
04-Jun-2018
Completion Date
04-Jun-2018
Standard
EN 45510-4-4:2003
English language
26 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Guide for procurement of power station equipment - Part 4-4: Boiler auxiliaries - Fuel preparation equipmentLeitfaden für Beschaffung von Ausrüstungen für Kraftwerke -- Teil 4-4: Nebenanlagen - BrennstoffaufbereitungsanlagenGuide pour l'acquisition d'équipements destinés aux centrales de production d'électricité -- Partie 4-4: Auxiliaires de chaudière - Systèmes de préparation du combustibleGuide for procurement of power station equipment -- Part 4-4: Boiler auxiliaries - Fuel preparation equipment27.100Elektrarne na splošnoPower stations in general27.060.30Grelniki vode in prenosniki toploteBoilers and heat exchangersICS:Ta slovenski standard je istoveten z:EN 45510-4-4:2002SIST EN 45510-4-4:2003en01-februar-2003SIST EN 45510-4-4:2003SLOVENSKI
STANDARD
EUROPEAN STANDARDNORME EUROPÉENNEEUROPÄISCHE NORMEN 45510-4-4August 2002ICS 27.040; 27.100English versionGuide for procurement of power station equipment - Part 4-4:Boiler auxiliaries - Fuel preparation equipmentGuide pour l'acquisition d'équipements destinés auxcentrales de production d'électricité - Partie 4-4: Auxiliairesde chaudière - Systèmes de préparation du combustibleLeitfaden für die Beschaffung von Ausrüstungen fürKraftwerke - Teil 4-4: Nebenanlagen -BrennstoffaufbereitungsanlagenThis European Standard was approved by CEN and CENELEC on 3 July 2001.CEN and CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for givingthis European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerningsuch national standards may be obtained on application to the CEN Management Centre or to any CEN or CENELEC member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a CEN or CENELEC member into its own language and notified to the CEN Management Centre has the samestatus as the official versions.CEN members are the national standards bodies of Austria, Belgium, Czech Republic, Denmark, Finland, France, Germany, Greece,Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and United Kingdom.CENELEC members are the national electrotechnical committees of Austria, Belgium, Czech Republic, Denmark, Finland, France,Germany, Greece, Hungary, Iceland, Ireland, Italy, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden,Switzerland and United Kingdom.CEN Management Centre:CENELEC Central Secretariat:rue de Stassart, 36
B-1050 Brusselsrue de Stassart, 35
B-1050 Brussels© 2002 CEN/CENELECAll rights of exploitation in any form and by any means reservedworldwide for CEN national Members and for CENELECMembers.Ref. No. EN 45510-4-4:2002 ESIST EN 45510-4-4:2003

As a comprehensive European environmental policy is still under preparation, this Guide does not address theenvironmental implications of the equipment.2 Normative referencesThis Guide for procurement incorporates by dated or undated reference, provisions from other publications.These normative references are cited in the appropriate places in the text, and the publications are listedhereafter. For dated references, subsequent amendments to or revisions of any of these publications apply tothis Guide only when incorporated in it by amendment or revision. For undated references, the latest editionof the publication referred to applies (including amendments).EN ISO 9001, Quality management systems - Requirements (ISO 9001:2000).IEC 60050-191, International electrotechnical vocabulary - Chapter 191: Dependability and quality of service.SIST EN 45510-4-4:2003

Further definitions of useful organisational terms can be found in EN ISO 9000 (see Bibliography).3.2 Technical terms3.2.1fuel preparation plantequipment comprising, for coal: coal feeders, mills, pipework, etc.; for oil: oil pumps, oil heaters,pipework, etc.; for gas: pressure reducing systems, pipework, etc., which together form a system to prepareand convey fuel to the burners at the conditions required for efficient combustion3.2.2coal feederdevice for supplying mills with a continuous flow of coal, capable of modulating flow rate according to theboiler demandSIST EN 45510-4-4:2003

Attention is drawn to European, national and/or local legislation which can place restrictions in this area.SIST EN 45510-4-4:2003

Guidance on the procurement of control and instrumentation systems for power stations, including advice oninterfaces can be found in EN 45510-8-1 (see Bibliography).4.6 Electrical supplies and other servicesThe specification should define the electrical supplies available for the operation of the equipment, theirvoltages and frequencies, with their range of variation, phases available and, where appropriate, theacceptable values of maximum load (kW) and short circuit level at each voltage level and the harmoniccontent. Requirements for terminals and terminal boxes should be stated; these should be to a recognisedEuropean or international standard.The specification should define the type and capacity of other services for the operation of the equipmentsuch as compressed air or auxiliary steam.4.7 Other interfacesThe specification should define the interfaces with existing ancillary or new ancillary equipment to besupplied under separate contracts which interact directly with the equipment, for example, civil works,cranage, or temporary systems.4.8 Project programmeThe specification should describe the overall programme and timescale in which the project is to be carriedout. This may include the principal dates associated with tendering, placement of orders, access to site, startand completion of installation, commissioning, take-over and final acceptance.4.9 Equipment identification systemsThe specification may specify the equipment identification system for use during the operating life of theplant. If applicable to the project, a recognised European or international system should be used.5 Extent of supplyThe specification should define the extent of supply of all the equipment.This could include for example:-main equipment such as coal feeders, mills, shut-off dampers, pipework, oil pumps, oil heaters, oilfilters, valves and, if appropriate, intermediate fuel storage equipment;-auxiliary equipment such as controls, instruments, power supplies, cooling and lubricating systems;-accessories for handling, maintenance or sampling systems;-spare parts such as mill grinding elements, pump seals, wear resisting liners;-site activities such as storage, transport and installation;-commissioning and performance tests;-documentation of equipment or system details, operation and maintenance manuals.If the purchaser wishes to have a contract for control and instrumentation separate from the equipmentsupply contract, the specification may require the supplier to provide information on all the necessaryinterfaces (e.g. all instrumentation tapping points and instruments, including their signal outputs, etc.,provided within the extent of supply).In addition provision may need to be made in the contract to ensure theavailability of information necessary to allow a satisfactory control system to be obtained. For example, thismay include a requirement for cooperation between the purchaser and supplier. Alternatively thespecification may define the technical information on equipment characteristics to be provided by thesupplier and the programme for its delivery.SIST EN 45510-4-4:2003

Performance tests are sometimes conducted off site and may be carried out at conditions different from theoperating point. The results may require scaling according to agreed rules. Where appropriate, correction curves shouldbe provided by the supplier to interpret tests which are not carried out at the defined operating condition.9.3 Equipment marginsThe specification should identify required equipment margins. These equipment margins may be appliedto compensate for uncertainty i
...