Railway applications - Functional Interface Specification - Pantograph System

This Technical Report is covering the description of the pantograph system and the functional interface between the pantograph system itself and the TCMS, including the context of multiple units. The pantograph system contains the pantograph and the pantograph control. The internal interface between pantograph and pantograph control is not in the scope of this document.

Bahnanwendungen - Funktionale Schnittstellenbeschreibung - Stromabnehmersystem

Applications ferroviaires - Spécification de l'interface fonctionnelle - Système des pantographes

Železniške naprave - Specifikacija funkcijskega vmesnika - Pantografski sistem

To tehnično poročilo zajema opis pantografskega sistema in funkcijskega vmesnika med pantografskim sistemom in TCMS, vključno v kontekstu več enot. Pantografski sistem sestavlja pantograf in krmiljenje pantografa. Notranji vmesnik med pantografom in krmiljenjem pantografa ne spada na področje uporabe tega dokumenta.

General Information

Status
Published
Publication Date
19-Jun-2014
Current Stage
6060 - Document made available - Publishing
Start Date
20-Jun-2014
Completion Date
20-Jun-2014

Buy Standard

Technical report
TP CLC/TR 50624:2018 - BARVE
English language
50 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST-TP CLC/TR 50624:2018
01-oktober-2018
Železniške naprave - Specifikacija funkcijskega vmesnika - Pantografski sistem
Railway applications - Functional Interface Specification - Pantograph System
Ta slovenski standard je istoveten z: CLC/TR 50624:2014
ICS:
35.200 Vmesniška in povezovalna Interface and interconnection
oprema equipment
45.020 Železniška tehnika na Railway engineering in
splošno general
SIST-TP CLC/TR 50624:2018 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST-TP CLC/TR 50624:2018

---------------------- Page: 2 ----------------------

SIST-TP CLC/TR 50624:2018

TECHNICAL REPORT CLC/TR 50624

RAPPORT TECHNIQUE

TECHNISCHER BERICHT
June 2014
ICS 35.240.60
English Version
Railway applications - Functional Interface Specification -
Pantograph System
Applications ferroviaires - Spécification d'interface To be completed
fonctionnelle - Système de pantographe


This Technical Report was approved by CENELEC on 2014-06-02.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.



European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2014 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
 Ref. No. CLC/TR 50624:2014 E

---------------------- Page: 3 ----------------------

SIST-TP CLC/TR 50624:2018
CLC/TR 50624:2014 - 2 -




Contents
Foreword . 4
1 Scope . 5
2 Normative references . 5
3 Terms, definitions and abbreviations . 5
4 Pantograph reference architecture . 6
5 Functional description . 7
Annex A (informative) UML common definitions .24
A.1 Common definitions .24
A.2 UML description .25
A.2.1 UML component diagram .25
A.2.2 UML deployment diagram .26
A.2.3 UML class diagram .27

Figures
Figure 1 - pantograph system and TCMS interface .6
Figure 2 - interaction between Pantograph system and TCMS .7
Figure 3 - TCMS control interface related to the pantograph system .8
Figure 4 - Common Diagnostics TCMS interface .9
Figure 5 - Pantograph control reference architecture overview . 11
Figure 6 - Pantograph system data types . 12
Figure 7 - Pantograph control and parametrisation interfaces . 15
Figure 8 - State chart for the control of a single pantograph . 18
Figure 9 - Pantograph diagnostics interface . 19
Figure 10 - Pantograph sy
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.