EN 1028-2:2002+A1:2008
(Main)Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements
This European Standard covers verification of the general and safety requirements of fire-fighting
centrifugal pumps with primer as specified in clauses 7 and 8 of !EN 1028-1:2002+A1:2008.
NOTE The tests can also be applied to pumps with nominal delivery rates greater than 6 000 l/min.
This standard does not apply to verification related to installation.
This standard does not apply to fire-fighting centrifugal pumps with primer that are manufactured
before the date of publication by CEN of this standard.
Feuerlöschpumpen - Feuerlöschkreiselpumpen mit Entlüftungseinrichtung - Teil 2: Feststellung der Übereinstimmung mit den allgemeinen und Sicherheitsanforderungen
Diese Europäische Norm gilt für die Feststellung der Übereinstimmung mit den allgemeinen und Sicherheitsanforderungen von Feuerlöschkreiselpumpen mit Entlüftungseinrichtung entsprechend den Festlegungen in !EN 1028-1:2002+A1:2008", Abschnitt 7 und Abschnitt 8.
ANMERKUNG Die Prüfungen können auch an Pumpen mit Nennförderströmen über 6000 l/min durchgeführt werden.
Die vorliegende Norm gilt nicht für die Überprüfung hinsichtlich des Einbaus.
Diese Norm gilt nicht für Feuerlöschkreiselpumpen mit Entlüftungseinrichtung, die hergestellt wurden, bevor CEN diese Norm veröffentlichte.
Pompes à usage incendie - Pompes centrifuges avec dispositif d'amorçage destinées à la lutte contre les incendies - Partie 2: Vérification des prescriptions générales et de sécurité
La présente Norme européenne définit la vérification des prescriptions générales et de sécurité des
pompes centrifuges à usage incendie, avec dispositif d’amorçage, telles que définies aux articles 7 et 8 de
l'!EN 1028-1:2002+A1:2008.
NOTE Les essais peuvent aussi s'appliquer aux pompes d’un débit de refoulement supérieur à 6 000 l/min.
La présente norme ne s’applique pas à la vérification relative à l’installation.
La présente norme ne s’applique pas aux pompes centrifuges à usage incendie avec dispositif d’amorçage qui ont
été fabriquées avant sa date de publication par le CEN.
Gasilske črpalke - Gasilske centrifugalne črpalke s sesalno napravo - 2. del: Preverjanje splošnih in varnostnih zahtev
General Information
Relations
Standards Content (Sample)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Feuerlöschpumpen - Feuerlöschkreiselpumpen mit Entlüftungseinrichtung - Teil 2: Feststellung der Übereinstimmung mit den allgemeinen und SicherheitsanforderungenPompes à usage incendie - Pompes centrifuges avec dispositif d'amorçage destinées à la lutte contre les incendies - Partie 2: Vérification des prescriptions générales et de sécuritéFire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements13.220.10Gašenje požaraFire-fightingICS:Ta slovenski standard je istoveten z:EN 1028-2:2002+A1:2008SIST EN 1028-2:2003+A1:2008en,fr,de01-september-2008SIST EN 1028-2:2003+A1:2008SLOVENSKI
STANDARD
EUROPEAN STANDARD NORME EUROPÉENNE EUROPÄISCHE NORM
EN 1028-2:2002+A1
April 2008 ICS 13.220.10 Supersedes EN 1028-2:2002 English Version
Fire-fighting pumps - Fire-fighting centrifugal pumps with primer - Part 2: Verification of general and safety requirements
Pompes à usage incendie - Pompes centrifuges avec dispositif d'amorçage destinées à la lutte contre les incendies - Partie 2: Vérification des prescriptions générales et de sécurité
Feuerlöschpumpen - Feuerlöschkreiselpumpen mit Entlüftungseinrichtung - Teil 2: Feststellung der Übereinstimmung mit den allgemeinen und Sicherheitsanforderungen This European Standard was approved by CEN on 5 April 2002 and includes Amendment 1 approved by CEN on 21 February 2008.
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN Management Centre or to any CEN member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION EUROPÄISCHES KOMITEE FÜR NORMUNG
Management Centre: rue de Stassart, 36
B-1050 Brussels © 2008 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 1028-2:2002+A1:2008: ESIST EN 1028-2:2003+A1:2008
...........................................................................................................................................................page Foreword..............................................................................................................................................................3 0 Introduction......................................................................................................................................................4 1 Scope.......................................................................................................................................................4 2 Normative references............................................................................................................................4 3 Terms and definitions............................................................................................................................5 4 Verifications............................................................................................................................................5 4.1 General....................................................................................................................................................5 4.2 Type verification.....................................................................................................................................5 4.3 Individual verification............................................................................................................................5 4.4 Methods of verification..........................................................................................................................6 4.4.1 Calculation check...................................................................................................................................6 4.4.2 Design check..........................................................................................................................................6 4.4.3 Compliance verification (manufacturing check).................................................................................6 4.5 Measuring instruments..........................................................................................................................7 5 Verification of the safety requirements and/or protective measures...............................................8 6 Verification of the general and performance requirements.............................................................11 7 Test report............................................................................................................................................14 Annex A (normative)
Suction line for tests.15 Annex B (normative)
Pressure measurements.18 Annex C (normative)
Measurements of delivery rates.19 Annex D (normative)
Dry suction test.20 Annex E (normative)
Performance test.22 Annex F (normative)
Working test.24 Annex G (normative)
Pressure test.25 Annex H (normative)
Efficiency test.26 Annex I (normative)
Primer test.28 Annex J (normative)
Cold test.29 Annex K (informative)
Guidance for acceptance tests on delivery.30 Annex ZA
(informative)
!!!!Relationship between this European Standard and the Essential Requirements of EU Directive 98/37/EC.31 Annex ZB (informative)
!!!!Relationship between this European Standard and the Essential Requirements of EU Directive 2006/42/EC.32 Bibliography.33
4.4.3.3 Verification by measurement (see also annexes C, D, E, H, I and J.4) Determine by measurement, with suitable measuring instruments, that the requirements of the measurable parameters of the standard have been met (e.g. geometric dimensions, delivery rate, pressure, temperatures) (see also 4.5). Methods of measurement should be selected to make use of existing or standardised methods. 4.4.3.4 Static test (see also annex G) Test out of the range of functional tests. Conduct the static pressure test and establish that the pump complies with the requirements of the standard. 4.4.3.5 Dynamic test (see also annex G) Test out of the range of functional tests. Conduct the dynamic test and establish that the pump complies with the requirements of the standard. Check that all safety devices are installed correctly and that their operation is as intended. 4.4.3.6 Functional tests (see also annexes D, E, F, G, I, J) Determine by functional tests that the pump operates to the requirements of the standard including all safety devices, except those related to pressure overload protection. 4.4.3.7 Test of pressure overload protection devices (see also annexes E, G) Determine that any pressure overload protection device operates to the requirements of the standard. 4.4.3.8 Verification of the information for the user Verify that all necessary information for safe commissioning, use, maintenance/inspection, decommissioning etc. as stated in the standard are present and adequate. 4.4.3.9 Verification of the information for the installer Verify that all necessary information on installation are present and adequate. 4.5 Measuring instruments Measuring instruments for the measurements specified in annexes B, C, D, E, F, G, H, I and J shall have an accuracy conforming to Table 1. SIST EN 1028-2:2003+A1:2008
Table 1 — Accuracy of measuring instruments Measuring instrument for Accuracy Delivery rate ± 1,5 % of QN
Speed ± 0,5 % of nN
Pressure ± 1,0 % of pN
Torque ± 1,0 % at nN
Vacuum ± 0,04 bar Temperature ± 1,0 °C
5 Verification of the safety requirements and/or protective measures Safety requirements and/or protective measures of !EN 1028-1:2002+A1" shall be verified in accordance with the method(s) specified in Table 2. Every indicated verification method shall be carried out. The test arrangements in annexes A to J, except annex I, shall be applied. SIST EN 1028-2:2003+A1:2008
1st paragraph –TYP –TYP and INDTYP–– ––TYPTYP 2nd paragraph–TYP –TYP and IND––– –––TYP 3rd paragraph –TYP –TYP––– ––TYPTYP 4th paragraph –TYP –TYP and IND––– ––TYPTYP 5th paragraph TYP –TYP and IND––– –––TYP 6th paragraph – TYPTYP––– –––TYP 5.2.1.1.2
1st paragraph –TYP –TYP and IND––– ––TYPTYP 2nd paragraph–TYP –TYP and IND––– ––TYPTYP 3rd paragr
...








Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...