Enterprise-control system integration - Part 1: Models and terminology

describes the interface content between manufacturing control functions and other enterprise functions. The interfaces considered are the interfaces between Levels 3 and 4 of the hierarchical model defined by this standard. The goal is to reduce the risk, cost, and errors associated with implementing these interfaces.

Integration von Unternehmensführungs- und Leitsystemen - Teil 1: Modelle und Terminologie

Intégration des systèmes entreprise-contrôle - Partie 1: Modèles et terminologie

décrit le contenu de l'interface entre les fonctions de contrôles de fabrication et les autres fonctions de l'entreprise. Les interfaces considérées sont les interfaces entre les Niveaux 3 et 4 du modèle hiérarchique défini par cette norme. Le but est de réduire le risque, le coût et les erreurs associés à la mise en place de ces interfaces.

Integracija sistemov za upravljanje podjetij - 1. del: Modeli in terminologija (IEC 62264-1:2003)

General Information

Status
Withdrawn
Publication Date
08-Jan-2008
Withdrawal Date
30-Nov-2010
Current Stage
9960 - Withdrawal effective - Withdrawal
Start Date
26-Jun-2016
Completion Date
26-Jun-2016

Relations

Buy Standard

Standard
EN 62264-1:2008
English language
156 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-junij-2008
Integracija sistemov za upravljanje podjetij - 1. del: Modeli in terminologija (IEC
62264-1:2003)
Enterprise-control system integration - Part 1: Models and terminology
Integration von Unternehmensführungs und Leitsystemen - Teil 1: Modelle und
Terminologie
Intégration des systemes entreprise-contrôle - Partie 1: Modeles et terminologie
Ta slovenski standard je istoveten z: EN 62264-1:2008
ICS:
25.040.01 Sistemi za avtomatizacijo v Industrial automation
industriji na splošno systems in general
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD
EN 62264-1
NORME EUROPÉENNE
January 2008
EUROPÄISCHE NORM
ICS 25.040; 35.240.50
English version
Enterprise-control system integration -
Part 1: Models and terminology
(IEC 62264-1:2003)
Intégration des systèmes  Integration von Unternehmensführungs-
entreprise-contrôle - und Leitsystemen -
Partie 1: Modèles et terminologie Teil 1: Modelle und Terminologie
(CEI 62264-1:2003) (IEC 62264-1:2003)

This European Standard was approved by CENELEC on 2007-12-01. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the
Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain,
Sweden, Switzerland and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung

Central Secretariat: rue de Stassart 35, B - 1050 Brussels

© 2008 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 62264-1:2008 E
Foreword
The text of the International Standard IEC 62264-1:2003, prepared by SC 65A, System aspects, of
IEC TC 65, Industrial-process measurement, control and automation, and ISO TC 184/SC 5/JWG 15,
Enterprise-control system integration, was submitted to the Unique Acceptance Procedure and was
approved by CENELEC as EN 62264-1 on 2007-12-01 without any modification.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
national standard or by endorsement (dop) 2008-12-01
– latest date by which the national standards conflicting
with the EN have to be withdrawn (dow) 2010-12-01
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 62264-1:2003 was approved by CENELEC as a European
Standard without any modification.
__________
- 3 - EN 62264-1:2008
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.

NOTE  When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year
IEC 61512-1 1997 Batch control - EN 61512-1 1999
Part 1: Models and terminology

ISO 10303-1 1994 Industrial automation systems and ENV ISO 10303-1 1995
integration - Product data representation and
exchange -
Part 1: Overview and fundamental principles

ISO 15531-1 2004 Industrial automation systems and - -
integration - Industrial manufacturing
management data -
Part 1: General
ISO 15704 2000 Industrial automation systems - - -
Requirements for enterprise-reference
architectures and methodologies

ISO/IEC 19501 2005 Information technology - Open Distributed - -
Processing - Unified Modeling Language
(UML)
NORME CEI
INTERNATIONALE IEC
62264-1
INTERNATIONAL
Première édition
STANDARD
First edition
2003-03
Intégration des systèmes entreprise-contrôle –
Partie 1:
Modèles et terminologie
Enterprise-control system integration –
Part 1:
Models and terminology
 IEC 2003 Droits de reproduction réservés  Copyright - all rights reserved
Aucune partie de cette publication ne peut être reproduite ni No part of this publication may be reproduced or utilized in any
utilisée sous quelque forme que ce soit et par aucun procédé, form or by any means, electronic or mechanical, including
y compris la photocopie et les photocopying and microfilm, without permission in writing from
électronique ou mécanique,
microfilms, sans l'accord écrit de l'éditeur. the publisher.
International Electrotechnical Commission, 3, rue de Varembé, PO Box 131, CH-1211 Geneva 20, Switzerland
Telephone: +41 22 919 02 11 Telefax: +41 22 919 03 00 E-mail: inmail@iec.ch  Web: www.iec.ch
CODE PRIX
XG
PRICE CODE
Pour prix, voir catalogue en vigueur
For price, see current catalogue

62264-1  IEC:2003 – 3 –
CONTENTS
FOREWORD.9
INTRODUCTION.13
1 Scope.17
2 Normative references.17
3 Terms and definitions.19
4 Enterprise-control system integration overview .25
4.1 Introduction.25
4.2 Criteria for inclusion in manufacturing operations and control domain.27
5 Hierarchy models.29
5.1 Hierarchy model introduction.29
5.2 Scheduling and control hierarchy.29
5.3 Equipment hierarchy.39
5.4 Decision hierarchy.43
6 Functional data flow model .45
6.1 Functional data flow model contents.45
6.2 Functional data flow model notation .45
6.3 Functional enterprise-control model.47
6.4 Functions.49
6.5 Information flows.63
7 Object model.73
7.1 Model explanation .73
7.2 Categories of information.75
7.3 Object model structure .89
7.4 Object model extensibility.91
7.5 Resources and views .91
7.6 Production capability information.111
7.7 Product definition information .119
7.8 Production information.125
7.9 Model cross-reference.143
8 Completeness, compliance and conformance.151
8.1 Completeness.151
8.2 Compliance.151
8.3 Conformance.151

Annex A (informative) IEC 62264 relationship with some other standardization work in
the manufacturing related area .153
Annex B (informative) Business drivers and key performance indicators .165
Annex C (informative) Discussion on models .181
Annex D (informative) Selected elements of the Purdue Reference Model .189
Annex E (informative) PRM correlation to MESA International
model and IEC 62264 models .285
Annex F (informative) Systems, resources, capability, capacity and time .291

Bibliography.305

62264-1  IEC:2003 – 5 –
Figure 1 – Outline of models in the standard.27
Figure 2 – Enterprise-control system interface .29
Figure 3 – Functional hierarchy.31
Figure 4 – Equipment hierarchy .39
Figure 5 – Functional enterprise/control model.49
Figure 6 – Areas of information exchange.75
Figure 7 – Production capability information.77
Figure 8 – Process segment capabilities .79
Figure 9 – Production information definition .81
Figure 10 – Example of process segments.85
Figure 11 – Possible information overlaps.85
Figure 12 – Production information .87
Figure 13 – Segment relationships.89
Figure 14 – Personnel model .93
Figure 15 – Equipment model .97
Figure 16 – Material model .103
Figure 17 – Process segment model .109
Figure 18 – Production capability model .113
Figure 19 – Process segment capability model .117
Figure 20 – Current and future capacities .119
Figure 21 – Product definition model.121
Figure 22 – Production schedule model .127
Figure 23 – Production performance model.137
Figure 24 – Object model inter-relations .145
Figure B.1 – Multiple business and production processes .167
Figure C.1 – Scope for Purdue Reference Model (PRM) for manufacturing .187
Figure D.1 – Assumed hierarchical computer control structure for a large
manufacturing complex .191
Figure D.2 – Assumed hierarchical computer control system structure for an industrial
plant .193
Figure D.3 – Assumed hierarchical computer control structure for an industrial
company
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.