Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures

The proposed standard provides the principles and procedures of environmental management related to execution of concrete structures.

Titre manque — Partie 5: Titre manque

General Information

Status
Not Published
Current Stage
6000 - International Standard under publication
Start Date
29-Oct-2025
Completion Date
13-Dec-2025
Ref Project
Draft
ISO/PRF 13315-5 - Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures Released:10/1/2025
English language
20 pages
sale 15% off
sale 15% off
Draft
REDLINE ISO/PRF 13315-5 - Environmental management for concrete and concrete structures — Part 5: Execution of concrete structures Released:10/1/2025
English language
20 pages
sale 15% off
sale 15% off

Standards Content (Sample)


International
Standard
First edition
Environmental management for
concrete and concrete structures —
Part 5:
Execution of concrete structures
PROOF/ÉPREUVE
Reference number
© ISO 2025
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
PROOF/ÉPREUVE
ii
Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Symbols . 2
5 Principles and procedure for environmental management related to execution of
concrete structures . 2
5.1 Principles .2
5.2 Procedure .3
5.3 Confirmation of the client brief and design documents and specifications.4
5.4 Setting of the environmental performance requirements .5
5.4.1 Selection of impact categories .5
5.4.2 Setting of indicators .5
5.4.3 Setting of environmental performance requirements for indicators .5
5.5 Formulation of the construction plan .6
5.6 Estimation .6
5.7 Verification . .6
5.8 Execution of construction and related works .7
5.9 Inspection .7
5.10 Documentation .7
Annex A (informative) Example of indicators for the environmental management . 8
Annex B (informative) Examples of the methods of environmental consideration in execution .12
Annex C (informative) Example of environmental management of concreting works - Migration
of energy source for concrete pumps- . .16
Bibliography .20
PROOF/ÉPREUVE
iii
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out through
ISO technical committees. Each member body interested in a subject for which a technical committee
has been established has the right to be represented on that committee. International organizations,
governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely
with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types
of ISO document should be noted. This document was drafted in accordance with the editorial rules of the
ISO/IEC Directives, Part 2 (see www.iso.org/directives).
ISO draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). ISO takes no position concerning the evidence, validity or applicability of any claimed patent
rights in respect thereof. As of the date of publication of this document, ISO had not received notice of (a)
patent(s) which may be required to implement this document. However, implementers are cautioned that
this may not represent the latest information, which may be obtained from the patent database available at
www.iso.org/patents. ISO shall not be held responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www.iso.org/iso/foreword.html.
This document was prepared by Technical Committee ISO/TC 71, Concrete, reinforced concrete and pre-
stressed concrete, Subcommittee SC 8, Environmental management for concrete and concrete structures.
A list of all parts in the ISO 13315 series can be found on the ISO website.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www.iso.org/members.html.
PROOF/ÉPREUVE
iv
Introduction
Execution of a concrete structure refers to activities of constructing a relatively large-scale structure as
single production at a given construction site. It essentially differs from ordinary industrial products, which,
as a result of mass production, have similar functions and performances to each other. When executing a
concrete structure, it is necessary to plan and execute each phase of construction work in consideration
of the scale of execution, condition of the ground, procurement conditions for materials and equipment,
ambient environment and global environment.
Execution of a concrete structure generally includes earthwork and foundation work, formwork,
reinforcement work and concreting work.
Such construction works cause a wide variety of environmental impacts. These include, for instance,
consumption of resources by the input of materials to execution of concrete structures; consumption of fuels
and electric power by the transportation of materials, equipment and heavy machinery and operation of
equipment and heavy machinery; and discharge of global warming substances and air-polluting substances
while generating noise and vibration. Earthwork and foundation work generate solid waste including
excavated soil, rock, dug-out roots, sludge and mud, dust and wastewater. Formwork generates used forms,
and reinforcement work generates metal waste. Concreting work generates washwater for concrete pumps
and buckets and concrete waste.
It is therefore necessary to appropriately manage the environmental impacts generated by execution of
concrete structures.
PROOF/ÉPREUVE
v
International Standard ISO 13315-5:2025(en)
Environmental management for concrete and concrete
structures —
Part 5:
Execution of concrete structures
1 Scope
This document provides the principles and procedures of environmental management for execution
activities of concrete structures, which comprises earthwork/foundation work, formwork, reinforcement
work, concreting work and waste treatment.
Additional works for concrete structures such as electric work and utility work are outside the scope of this
standard.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO 13315-1, Environmental management for concrete and concrete structures — Part 1: General principles
ISO 13315-2, Environmental management for concrete and concrete structures — Part 2: System boundary and
inventory data
ISO 13315-4, Environmental management for concrete and concrete structures — Part 4: Environmental design
of concrete structures
ISO 13315-6, Environmental management for concrete and concrete structures — Part 6: Use of concrete
structures
ISO 13315-8, Environmental management for concrete and concrete structures — Part 8: Environmental labels
and declarations
ISO 14040, Environmental management — Life cycle assessment — Principles and framework
ISO 14044, Environmental management — Life cycle assessment — Requirements and guidelines
ISO 14050, Environmental management — Vocabulary
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 13315-1, ISO 13315-2, ISO 13315-4,
ISO 13315-6, ISO 13315-8, ISO14040, ISO14044 and ISO 14050 and the following apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
PROOF/ÉPREUVE
3.1
target execution activity
execution activity for which environmental consideration is given.
3.2
reference execution activity
conventional standard execution activity, having the same purpose as the target execution activity, to be
used for comparison in the environmental management related to execution activities
4 Symbols
Symbols used in this document are as follows:
Pi()
expected or attained environmental performance of the target execution activity
texe
expressed as a function of indicator i;
e
expected environmental performance of the target execution activity expressed as a
Pi()
texe
function of indicator i;
a
attained environmental performance of the target execution activity expressed as a
Pi()
texe
function of indicator i;
Pi()
environmental performance of the reference execution activity expressed as a function
rexe
of indicator i;
Si()
environmental performance requirement of the execution activity expressed as a
exe
function of indicator i;
Ri()
reduction amount of environmental impact of the target execution activity in compar-
A texe
ison with reference execution activity;
Ri()
reduction rate of environmental impact of the target execution activity in comparison
R texe
with reference execution activity;
e
expected reduction amount of environmental impact of the target execution activity
Ri()
A texe
in comparison with reference execution activity;
a
attained reduction amount of environmental impact of the target execution activity
Ri()
A texe
in comparison with reference execution activity;
e
expected reduction rate of environmental impact of the target execution activity in
Ri()
R texe
comparison with reference execution activity;
a
attained reduction rate of environmental impact of the target execution activity in
Ri()
R texe
comparison with reference execution activity.
5 Principles and procedure for environmental management related to execution of
concrete structures
5.1 Principles
In the execution of a concrete structure, environmental management shall be carried out for the entire
work consisting of earthwork/foundation work, formwork, reinforcement work, concreting work and waste
treatment, or each of these works or combinations thereof.
PROOF/ÉPREUVE
5.2 Procedure
Environmental management of execution activity shall be carried out in accordance with the following
procedure:
a) confirmation of the client brief and design documents and specifications (see 5.3);
b) setting of the environmental performance requirements (see 5.4);
c) formulation of the construction plan (see 5.5);
d) estimation (see 5.6);
e) verification (see 5.7);
f) execution of construction and related works (see 5.8);
g) inspection (see 5.9);
h) documentation (see 5.10).
Figure 1 shows the flow chart of this procedure.
PROOF/ÉPREUVE
Figure 1 — Procedure for environmental management of execution activity
5.3 Confirmation of the client brief and design documents and specifications
The client brief at the design stage and design documents and specifications shall be confirmed. When the
structure is found not to incorporate environmental design based on ISO 13315-4 at the design stage, a client
briefing regarding the environmental aspect of the execution activity shall be carried out in consideration of
PROOF/ÉPREUVE
the social and economic aspects, and the results shall be reflected in the specifications for execution through
an appropriate procedure.
5.4 Setting of the environmental performance requirements
5.4.1 Selection of impact categories
Impact categories shall be selected from among the following items based on the client brief and design
documents and specifications:
— global climate change;
— natural resources use;
— stratospheric ozone level;
— land use/habitat alteration;
— eutrophication;
— acidification;
— air pollution;
— water pollution;
— soil contamination;
— pollution due to radioactive substances;
— impacts due to waste generation;
— noise/vibration.
NOTE ISO 14040 and ISO 14044 serve as references for selecting impact categories.
5.4.2 Setting of indicators
Appropriate indicators shall be set for each category selected.
The reduction amount of environmental impact or the reduction rate of environmental impact of the target
execution activity in comparison with the reference execution activity can be used as an indicator. The
environmental performance of the reference execution activity shall be appropriately estimated.
NOTE 1 ISO 21929-1, ISO/TS 21929-2, ISO 21931-1 and Annex A serve as a reference for setting indicators.
NOTE 2 To assess whether a product is environmentally labelled, Boolean indicator is a useful option to be set.
5.4.3 Setting of environmental performance requirements for indicators
An environmental performance requirement shall be set for each indicator in each impact category.
The environmental performance requirements shall be quantitatively set in the form of upper limits, lower
limits, or ranges of the indicators.
NOTE 1 The reduction amount of environmental impact of the target execution activity, Ri() , refers to the
Atexe
difference between the environmental performance of the reference execution activity and the expected or attained
environmental performance of the target execution activity. It is defined as Formula (1).
PROOF/ÉPREUVE
Ri()=−Pi() Pi() (1)
A texe rexe texe
The reduction rate of environmental impact of the target execution activity, Ri() , refers to the ratio of
R texe
the reduction of the environmental impact, Ri(), to the environmental performance of the reference
Atexe
execution activity. It is defined as Formula (2).
Pi()−Pi()
rexe texe
Ri()= (2)
R texe
Pi()
rexe
NOTE 2 ISO 14040 and ISO 14044 serve as references for setting of environmental performance requirements.
5.5 Formulation of the construction plan
The entire work subject to environmental management or respective works or combinations thereof shall
be selected from among items a) to e) below:
a) earthwork and foundation work;
b) formwork;
c) reinforcement work;
d) concreting work;
e) waste treatment.
A construction plan shall be formulated by determining the methods of reducing environmental impacts
to be applied to the work selected above to satisfy the environmental performance requirements set in 5.4.
Such methods include the following:
— selection of products and resources with low environmental impacts, for example to select environmental
labelled products;
— selection of energy sources with low environmental impacts;
— selection of machinery/equipment with low environmental impacts;
— selection of execution methods or procedures with low environmental impacts;
— appropriate control/disposal of substances discharged from the site;
— appropriate control/disposal of substances treated within the site.
NOTE 1 Annex B serves as a reference for methods of reducing environmental impacts.
NOTE 2 ISO 13315-8 serves as references for selecting products with environmental labelling and declaration.
5.6 Estimation
Each of the expected environmental performances of the execution activity based on construction plan
formulated in 5.5 shall be estimated.
5.7 Verification
Verification shall be made as to whether each of the expected environmental performances, estimated in
5.6, meets the environmental performance requirements set in 5.4. If any of the expected environmental
performances fail to meet the environmental performance requirements, then the construction plan shall be
modified by returning to 5.5. If the requirements are not satisfied by this modification, the environmental
performance requirements shall be reviewed by returning to 5.4. If the construction plan fails to meet the
reviewed environmental performance requirements, a client briefing shall be held on the environmental
PROOF/ÉPREUVE
aspects of the construction by returning to 5.3, and, if necessary, the specifications for the execution shall be
modified based on agreement among the parties concerned.
5.8 Execution of construction and related works
Construction works shall be executed based on the construction plan and necessary data shall be acquired.
Based on the acquired data, each of the attained environmental performances shall be confirmed.
5.9 Inspection
Inspection shall be conducted as to whether the attained environmental performances meet the
environmental performance requirements. If performances fail to meet the requirements, the causes shall
be analysed to serve as a reference for execution activities in future projects.
5.10 Documentation
All information related to environmental management of the execution of the concrete structure shall
be recorded regardless of the results of verification and inspection, and the record shall be stored by the
designer, contractor and owner of the concrete structure for the required period.
Information related to environmental management of execution of the concrete structure should preferably
be used to help the execution planning of similar concrete structures.
PROOF/ÉPREUVE
Annex A
(informative)
Example of indicators for the environmental management
Tables A.1 to A.12 show examples of indicators for respective impact categories.
Table A.1 — Example of indicators on global climate change
Greenhouse g
...


ISO/DISPRF 13315-5:2025(en)
ISO/TC 71/SC 8
Secretariat: JISC
Date: 2025-04-2409-30
Environmental management for concrete and concrete structures
— —
Part 5:
Execution of concrete structures
PROOF
ISO/PRF 13315-5:2025(en)
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication
may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying,
or posting on the internet or an intranet, without prior written permission. Permission can be requested from either ISO
at the address below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: + 41 22 749 01 11
Fax: +41 22 749 09 47
EmailE-mail: copyright@iso.org
Website: www.iso.org
Published in Switzerland
© ISO/DIS 13315-5 2025 – All rights reserved
ii
ISO/DISPRF 13315-5:2025(en)
Contents
Foreword . iv
Introduction . v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Symbols . 2
5 Principles and procedure for environmental management related to execution of
concrete structures . 2
5.1 Principles . 2
5.2 Procedure . 3
5.3 Confirmation of the client brief and design documents and specifications . 5
5.4 Setting of the environmental performance requirements . 6
5.5 Formulation of the construction plan . 7
5.6 Estimation . 8
5.7 Verification . 8
5.8 Execution of construction and related works . 8
5.9 Inspection . 8
5.10 Documentation . 8
Annex A (informative) Example of indicators for the environmental management . 9
Annex B (informative) Examples of the methods of environmental consideration in execution . 13
Annex C (informative) Example of environmental management of concreting works - Migration
of energy source for concrete pumps- . 16
Bibliography . 20

iii
ISO/PRF 13315-5:2025(en)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out through
ISO technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are described
in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the different types of
ISO document should be noted. This document was drafted in accordance with the editorial rules of the
ISO/IEC Directives, Part 2 (see www.iso.org/directives).
ISO draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). ISO takes no position concerning the evidence, validity or applicability of any claimed patent rights
in respect thereof. As of the date of publication of this document, ISO had not received notice of (a) patent(s)
which may be required to implement this document. However, implementers are cautioned that this may not
represent the latest information, which may be obtained from the patent database available at
www.iso.org/patents. ISO shall not be held responsible for identifying any or all such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and expressions
related to conformity assessment, as well as information about ISO's adherence to the World Trade
Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www.iso.org/iso/foreword.html.
This document was prepared by Technical Committee ISO/TC 71, Concrete, reinforced concrete and pre-
stressed concrete, Subcommittee SC 8, Environmental management for concrete and concrete structures.
A list of all parts in the ISO 13315 series can be found on the ISO website.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www.iso.org/members.html.
© ISO/DIS 13315-5 2025 – All rights reserved
iv
ISO/DISPRF 13315-5:2025(en)
Introduction
Execution of a concrete structure refers to activities of constructing a relatively large-scale structure as single
production at a given construction site. It essentially differs from ordinary industrial products, which, as a
result of mass production, have similar functions and performances to each other. When executing a concrete
structure, it is necessary to plan and execute each phase of construction work in consideration of the scale of
execution, condition of the ground, procurement conditions for materials and equipment, ambient
environment and global environment.
Execution of a concrete structure generally includes earthwork and foundation work, formwork,
reinforcement work and concreting work.
Such construction works cause a wide variety of environmental impacts. These include, for instance,
consumption of resources by the input of materials to execution of concrete structures; consumption of fuels
and electric power by the transportation of materials, equipment and heavy machinery and operation of
equipment and heavy machinery; and discharge of global warming substances and air-polluting substances
while generating noise and vibration. Earthwork and foundation work generate solid waste including
excavated soil, rock, dug-out roots, sludge and mud, dust and wastewater. Formwork generates used forms,
and reinforcement work generates metal waste. Concreting work generates washwater for concrete pumps
and buckets and concrete waste.
It is therefore necessary to appropriately manage the environmental impacts generated by execution of
concrete structures.
v
DRAFT International Standard ISO/DIS 13315-5:2025(en)

Environmental management for concrete and concrete structures
— —
Part 5:
Execution of concrete structures
1 Scope
This document provides the principles and procedures of environmental management for execution activities
of concrete structures, which comprises earthwork/foundation work, formwork, reinforcement work,
concreting work and waste treatment.
Additional works for concrete structures such as electric work and utility work are outside the scope of this
standard.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
ISO 13315--1, Environmental management for concrete and concrete structures — Part 1: General principles
ISO 13315--2, Environmental management for concrete and concrete structures — Part 2: System boundary and
inventory data
ISO 13315--4, Environmental management for concrete and concrete structures — Part 4: Environmental design
of concrete structures
ISO 13315--6, Environmental management for concrete and concrete structures — Part 6: Use of concrete
structures
ISO 13315--8, Environmental management for concrete and concrete structures — Part 8: Environmental labels
and declarations
ISO 14040, Environmental management — Life cycle assessment — Principles and framework
ISO 14044, Environmental management — Life cycle assessment — Requirements and guidelines
ISO 14050, Environmental management — Vocabulary
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 13315-1, ISO 13315-2, ISO 13315-
4, ISO 13315-6, ISO 13315-8, ISO14040, ISO14044 and ISO 14050 and the following apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
ISO/PRF 13315-5:2025(en)
— — ISO Online browsing platform: available at https://www.iso.org/obp
— — IEC Electropedia: available at https://www.electropedia.org/
3.1 3.1
target execution activity
execution activity for which environmental consideration is given.
3.2 3.2
reference execution activity
conventional standard execution activity, having the same purpose as the target execution activity, to be used
for comparison in the environmental management related to execution activities
4 Symbols
Symbols used in this document are as follows:
𝑃 (𝑖) expected or attained environmental performance of the target execution activity
texe
expressed as a function of indicator i;
e
𝑃 (𝑖) expected environmental performance of the target execution activity expressed as a
texe
function of indicator i;
a
𝑃 (𝑖) attained environmental performance of the target execution activity expressed as a
texe
function of indicator i;
𝑃 (𝑖) environmental performance of the reference execution activity expressed as a
rexe
function of indicator i;
𝑆 (𝑖) environmental performance requirement of the execution activity expressed as a
exe
function of indicator i;
𝑅 (𝑖) reduction amount of environmental impact of the target execution activity in
A texe
comparison with reference execution activity;
𝑅 (𝑖) reduction rate of environmental impact of the target execution activity in
R texe
comparison with reference execution activity;
e
𝑅 (𝑖) expected reduction amount of environmental impact of the target execution activity
A texe
in comparison with reference execution activity;
a
𝑅 (𝑖) attained reduction amount of environmental impact of the target execution activity
A texe
in comparison with reference execution activity;
e
𝑅 (𝑖) expected reduction rate of environmental impact of the target execution activity in
R texe
comparison with reference execution activity;
a
𝑅 (𝑖) attained reduction rate of environmental impact of the target execution activity in
R texe
comparison with reference execution activity.
5 Principles and procedure for environmental management related to execution of
concrete structures
5.1 Principles
In the execution of a concrete structure, environmental management shall be carried out for the entire work
consisting of earthwork/foundation work, formwork, reinforcement work, concreting work and waste
treatment, or each of these works or combinations thereof.
© ISO/DIS 13315-5 2025 – All rights reserved
ISO/DISPRF 13315-5:2025(en)
5.2 Procedure
Environmental management of execution activity shall be carried out in accordance with the following
procedure:
a) a) confirmation of the client brief and design documents and specifications (see 5.35.3););
b) b) setting of the environmental performance requirements (see 5.45.4););
c) c) formulation of the construction plan (see 5.55.5););
d) d) estimation (see 5.65.6););
e) e) verification (see 5.75.7););
f) f) execution of construction and related works (see 5.85.8););
g) g) inspection (see 5.95.9););
h) h) documentation (see 5.105.10).).
Figure 1Figure 1 shows the flow chart of this procedure.
ISO/PRF 13315-5:2025(en)
© ISO/DIS 13315-5 2025 – All rights reserved
ISO/DISPRF 13315-5:2025(en)
Figure 1 — Procedure for environmental management of execution activity
5.3 Confirmation of the client brief and design documents and specifications
The client brief at the design stage and design documents and specifications shall be confirmed. When the
structure is found not to incorporate environmental design based on ISO 13315-4 at the design stage, a client
briefing regarding the environmental aspect of the execution activity shall be carried out in consideration of
ISO/PRF 13315-5:2025(en)
the social and economic aspects, and the results shall be reflected in the specifications for execution through
an appropriate procedure.
5.4 Setting of the environmental performance requirements
5.4.1 Selection of impact categories
Impact categories shall be selected from among the following items based on the client brief and design
documents and specifications:
— — global climate change;
— — natural resources use;
— — stratospheric ozone level;
— — land use/habitat alteration;
— — eutrophication;
— — acidification;
— — air pollution;
— — water pollution;
— — soil contamination;
— — pollution due to radioactive substances;
— — impacts due to waste generation;
— — noise/vibration.
NOTE ISO 14040 and ISO 14044 serve as references for selecting impact categories.
5.4.2 Setting of indicators
Appropriate indicators shall be set for each category selected.
The reduction amount of environmental impact or the reduction rate of environmental impact of the target
execution activity in comparison with the reference execution activity can be used as an indicator. The
environmental performance of the reference execution activity shall be appropriately estimated.
NOTE 1 ISO 21929-1, ISO/TS 21929-2, ISO 21931-1 and Annex AAnnex A serve as a reference for setting indicators.
NOTE 2 To assess whether a product is environmentally labelled, Boolean indicator is a useful option to be set.
5.4.3 Setting of environmental performance requirements for indicators
An environmental performance requirement shall be set for each indicator in each impact category.
The environmental performance requirements shall be quantitatively set in the form of upper limits, lower
limits, or ranges of the indicators.
NOTE 1 The reduction amount of environmental impact of the target execution activity, ,𝑅 (𝑖), refers to the
𝐴 texe
difference between the environmental performance of the reference execution activity and the expected or attained
© ISO/DIS 13315-5 2025 – All rights reserved
ISO/DISPRF 13315-5:2025(en)
environmental performance of the target execution activity. It is defined as Error! Reference source not
found.Formula (1).
(1)
𝑅 (𝑖) = 𝑃 (𝑖) − 𝑃 (𝑖) (1)
rexe texe
A texe
The reduction rate of environmental impact of the target execution activity, ,𝑅 (𝑖), refers to the ratio of the
𝑅 texe
reduction of the environmental impact, ,𝑅 (𝑖), to the environmental performance of the reference
𝐴 texe
execution activity. It is defined as Error! Reference source not found.Formula (2).
(2)
𝑃 (𝑖)−𝑃 (𝑖)
rexe texe
𝑅 (𝑖) = (2)
R texe
𝑃 (𝑖)
rexe
NOTE 2 ISO 14040 and ISO 14044 serve as references for setting of environmental performance requirements.
5.5 Formulation of the construction plan
The entire work subject to environmental management or respective works or combinations thereof shall be
selected from among items a) to e) below:
a) a) earthwork and foundation work;
b) b) formwork;
c) c) reinforcement work;
d) d) concreting work;
e) e) waste treatment.
A construction plan shall be formulated by determining the methods of reducing environmental impacts to be
applied to the work selected above to satisfy the environmental performance requirements set in 5.45.4. Such
methods include the following:
— — selection of products and resources with low environmental impacts, for example to select
environmental labelled products;
— — selection of energy sources with low environmental impacts;
— — selection of machinery/equipment with low environmental impacts;
— — selection of execution methods or procedures with low environmental impacts;
— — appropriate control/disposal of substances discharged from the site;
— — appropriate control/disposal of substances treated within the site.
NOTE 1 Annex BAnnex B serves as a reference for methods of reducing environmental impacts.
NOTE 2 ISO 13315--8 serves as references for selecting products with environmental labelling and declaration.
ISO/PRF 13315-5:2025(en)
5.6 Estimation
Each of the expected environmental performances of the execution activity based on construction plan
formulated in 5.55.5 shall be estimated.
5.7 Verification
Verification shall be made as to whether each of the expected environmental performances, estimated in
5.65.6,, meets the environmental performance requirements set in 5.45.4. If any of the expected
environmental performances fail to meet the environmental performance requirements, then the construction
plan shall be modified by returning to 5.55.5. If the requirements are not satisfied by this modification, the
environmental performance requirements shall be reviewed by returning to 5.45.4. If the construction plan
fails to meet the reviewed environmental performance requirements, a client briefing shall be held on the
environmental aspects of the construction by returning to 5.35.3,, and, if necessary, the specifications for the
execution shall be modified based on agreement among the parties concerned.
5.8 Execution of construction and related works
Construction works shall be executed based on the construction plan and necessary data shall be acquired.
Based on the acquired data, each of the attained environmental performances shall be confirmed.
5.9 Inspection
Inspection shall be conducted as to whether the attained environmental performances meet the
environmental performance requirements. If performances fail to meet the requirements, the causes shall be
analysed to serve as a reference for execution activities in future projects.
5.10 Documentation
All information related to environmental management of the execution of the concrete structure shall be
recorded regardless of the results of verification and inspection, and the record shall be stored by the designer,
contractor and owner of the concrete structure for the required period.
Information related to environmental management of execution of the concrete structure should preferably
be used to help the execution planning of similar concrete structures.
© ISO/DIS 13315-5 2025 – All rights reserved
ISO/DISPRF 13315-5:2025(en)
Annex A
(informative)
Example of indicators for the environmental management
Tables A.1Tables A.1 to A.12A.12 show examples of indicators for respective impact categories.
Table A.1 — Example of indicators on global climate change
Greenhouse gas emissions can be set as an indicator.
Greenhouse gases include, for example, the following:
— — carbon dioxide (CO2)
— — methane (CH )
— — dinitrogen monoxide (N2O)
Indicator
— — hydrofluorocarbons (HFCs)
— — perfluorocarbons (PFCs)
— — sulfur hexafluoride (SF )
[ [1]]
NOTE Global climate change may be characterized as CO equivalent 0. .
Table A.2 — Example of indicators on natural resources use
The amount of mined abiotic resources can be set as an indicator.
Abiotic resources include, for example, the following:
— — rock for producing aggregate
— — limestone and silica stone used for producing cement and additions
— — natural resources (for example, iron ore) used for producing section steel and
coal as materials for coke
— — natural resources (for example, tungsten ore) used for producing rare metals
Indicator
(for example, tungsten) contained in the attachments of heavy machinery
The amount of water used can be set as an indicator.
Water includes, for example, tap water, industrial water, and groundwater.
The amount of each type of fossil fuel used can be set as an indicator.
Fossil fuel
...