Information technology - Data centre facilities and infrastructures - Part 99-1: Recommended practices for energy management

This Technical Report contains a set of recommended practices for improving the energy management (i.e. reduction of energy consumption and/or increases in energy efficiency) of data centres. It supports participants of the EU Code of Conduct for data centres to fulfil the scheme’s requirements

Informationstechnik - Einrichtungen und Infrastrukturen von Rechenzentren - Teil 99-1: Empfohlene Praktiken für das Energiemanagement

Technologies de l’information - Installation et infrastructures des centres de traitement de données - Partie 99-1: Pratiques recommandées relatives à la gestion énergétique

Informacijska tehnologija - Naprave in infrastruktura podatkovnega centra - 99-1. del: Priporočene prakse za upravljanje z energijo

General Information

Status
Published
Publication Date
07-Oct-2021
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
05-Oct-2021
Due Date
10-Dec-2021
Completion Date
08-Oct-2021

Relations

Buy Standard

Technical report
TP CLC/TR 50600-99-1:2021
English language
52 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST-TP CLC/TR 50600-99-1:2021
01-november-2021
Nadomešča:
SIST-TP CLC/TR 50600-99-1:2020
Informacijska tehnologija - Naprave in infrastruktura podatkovnega centra - 99-1.
del: Priporočene prakse za upravljanje z energijo
Information technology - Data centre facilities and infrastructures - Part 99-1:
Recommended practices for energy management
Informationstechnik - Einrichtungen und Infrastrukturen von Rechenzentren - Teil 99-1:
Empfohlene Praktiken für das Energiemanagement
Technologies de linformation - Installation et infrastructures des centres de traitement de
données - Partie 99-1: Pratiques recommandées relatives à la gestion énergétique
Ta slovenski standard je istoveten z: CLC/TR 50600-99-1:2021
ICS:
27.015 Energijska učinkovitost. Energy efficiency. Energy
Ohranjanje energije na conservation in general
splošno
35.110 Omreževanje Networking
SIST-TP CLC/TR 50600-99-1:2021 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST-TP CLC/TR 50600-99-1:2021

---------------------- Page: 2 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
TECHNICAL REPORT CLC/TR 50600-99-1
RAPPORT TECHNIQUE
TECHNISCHER BERICHT
August 2021
ICS 35.020; 35.110; 35.160 Supersedes CLC/TR 50600-99-1:2020
English Version
Information technology - Data centre facilities and infrastructures
- Part 99-1: Recommended practices for energy management
Technologies de l'information - Installation et Informationstechnik - Einrichtungen und Infrastrukturen von
infrastructures des centres de traitement de données - Rechenzentren - Teil 99-1: Empfohlene Praktiken für das
Partie 99-1: Pratiques recommandées relatives à la gestion Energiemanagement
énergétique
This Technical Report was approved by CENELEC on 2021-07-26.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the
Netherlands, Norway, Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2021 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. CLC/TR 50600-99-1:2021 E

---------------------- Page: 3 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
Contents Page
European foreword . 4
Introduction . 5
1 Scope . 9
2 Normative references . 9
3 Terms, definitions and abbreviations . 9
3.1 Terms and definitions . 9
3.2 Abbreviations . 12
4 Principles . 13
4.1 General . 13
4.2 Data centre utilization, management and planning . 14
4.3 Data centre ICT equipment and services . 14
4.4 Data centre cooling equipment . 15
4.5 Data centre power equipment . 16
4.6 Other data centre equipment . 16
4.7 Data centre building . 16
4.8 Data centre monitoring . 17
5 Expected practices . 18
5.1 Existing data centres . 18
5.2 ICT equipment (new or replacement) . 24
5.3 Software install or upgrade (Reserved for future new expected Practices) . 28
5.4 New build or refurbishment of data centres . 28
5.5 Data Centre Monitoring: Energy consumption and environmental
measurement . 35
5.6 Reserved for future new expected Practices from 2022 onwards . 35
6 Optional and alternative Practices . 36
6.1 Existing data centres . 36
6.2 ICT equipment (new or replacement) . 40
6.3 Software install or upgrade . 42
6.4 New build or refurbishment of data centres . 43
6.5 KPI calculation and reporting . 46
6.6 Reserved for future new optional and alternative practices from 2022

onwards . 47
7 Practices under consideration . 47
7.1 Practices expected to be included in Clause 5 in due course . 47
7.1.1 Existing data centres . 47
7.1.2 ICT equipment (new or replacement) . 47
7.1.3 Software install or upgrade . 47
7.1.4 New build or refurbishment of data centres (any data centre
built or undergoing a significant refit of the mechanical and
electrical equipment from 2015 onwards) . 47
7.2 Practices expected to be included in Clause 6 in due course . 47
7.2.1 Existing data centres . 47
2

---------------------- Page: 4 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
7.2.2 ICT equipment (new or replacement) . 47
7.2.3 Software install or upgrade . 48
7.2.4 New build or refurbishment of data centres (any data centre
built or undergoing a significant refit of the mechanical and
electrical equipment from 2015 onwards) . 48
Annex A (informative) Environmental classifications . 49
A.1 ASHRAE classifications . 49
A.2 ETSI EN 300 019-1-3 classifications . 49
Bibliography . 51

3

---------------------- Page: 5 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
European foreword
This document (CLC/TR 50600-99-1:2021) has been prepared by CLC/TC 215 “Electrotechnical
aspects of telecommunication equipment” in conjunction with the Directorate-General Joint Research
Centre (DG JRC) of the European Commission (EC).
This document supersedes CLC/TR 50600-99-1:2020.
CLC/TR 50600-99-1:2021 includes the following significant technical changes with respect to
CLC/TR 50600-99-1:2020:
— update to recently agreed energy management practices and align with the 2021 edition of the EU
Code of Conduct for data centres Best Practices document;
— new practices added in 5.5, 6.5, 7.2.2, 7.2.3 and 7.2.4;
— re-arrangement of some practices and editorial improvements;
— the practices on “Smart Grid” and “Capture Ready infrastructure” have been re-located to
CLC/TR 50600-99-2:2021.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
This document has been prepared under a Standardization Request given to CENELEC by the
European Commission and the European Free Trade Association.
This document aligns with the Best Practices document of the Code of Conduct for Data Centre
Energy Efficiency (CoC) scheme operated by the DG JRC and continues to be prepared by data centre
experts from operators, vendors, consultants, academics, professional and national bodies.
The publication of this document is intended to integrate recommended practices of energy
management into the EN 50600 series developed by CLC/TC 215.
Regarding the structure of the EN 50600 series, see the Introduction.
Any feedback and questions on this document should be directed to the users’ national committee. A
complete listing of these bodies can be found on the CENELEC website.
4

---------------------- Page: 6 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
Introduction
The unrestricted access to internet-based information demanded by the information society has led to
an exponential growth of both internet traffic and the volume of stored/retrieved data. Data centres are
housing and supporting the information technology and network telecommunications equipment for
data processing, data storage and data transport. They are required both by network operators
(delivering those services to customer premises) and by enterprises within those customer premises.
Data centres usually provide modular, scalable and flexible facilities and infrastructures to easily
accommodate the rapidly changing requirements of the market. In addition, energy consumption of
data centres has become critical both from an environmental point of view (reduction of environmental
footprint) and with respect to economical considerations (cost of energy) for the data centre operator.
The implementation of data centres varies in terms of:
a) purpose (enterprise, co-location, co-hosting, or network operator facilities);
b) security level;
c) physical size;
d) accommodation (mobile, temporary and permanent constructions).
The needs of data centres also vary in terms of availability of service, the provision of security and the
objectives for energy efficiency. These needs and objectives influence the design of data centres in
terms of building construction, power distribution, environmental control, telecommunications cabling
and physical security as well as the operation of the data centre. Effective management and
operational information is important in order to monitor achievement of the defined needs and
objectives.
Recognizing the substantial resource consumption, particularly of energy, of larger data centres, it is
also important to provide tools for the assessment of that consumption both in terms of overall value
and of source mix and to provide Key Performance Indicators (KPIs) to evaluate trends and drive
performance improvements.
At the time of publication of this document, the EN 50600 series is designed as a framework of
standards, technical specifications and technical reports covering the design, the operation and
management, the key performance indicators for energy efficient operation of the data centre as well
as a data centre maturity model.
The EN 50600-2 series defines the requirements for the data centre design.
The EN 50600-3 series defines the requirements for the operation and the management of the data
centre.
The EN 50600-4 series defines the key performance indicators for the data centre.
The CLC/TS 50600-5 series defines the data centre maturity model requirements and
recommendations.
The CLC/TR 50600-99-X Technical Reports cover recommended practices and guidance for specific
topics around data centre operation and design.
This series of documents specifies requirements and recommendations to support the various parties
involved in the design, planning, procurement, integration, installation, operation and maintenance of
facilities and infrastructures within data centres. These parties include:
1) owners, operators, facility managers, ICT managers, project managers, main contractors;
2) consulting engineers, architects, building designers and builders, system and installation
designers, auditors, test and commissioning agents;
3) facility and infrastructure integrators, suppliers of equipment;
4) installers, maintainers.
5

---------------------- Page: 7 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
At the time of publication of this document, the EN 50600 series will comprise the following standards
and documents:
EN 50600-1, Information technology — Data centre facilities and infrastructures — Part 1: General
concepts
EN 50600-2-1, Information technology — Data centre facilities and infrastructures — Part 2-1: Building
construction
EN 50600-2-2, Information technology — Data centre facilities and infrastructures — Part 2-2: Power
supply and distribution
EN 50600-2-3, Information technology — Data centre facilities and infrastructures — Part 2-3:
Environmental control
EN 50600-2-4, Information technology — Data centre facilities and infrastructures — Part 2-4:
Telecommunications cabling infrastructure
EN 50600-2-5, Information technology — Data centre facilities and infrastructures — Part 2-5: Security
systems
EN 50600-3-1, Information technology — Data centre facilities and infrastructures — Part 3-1:
Management and operational information
EN 50600-4-1, Information technology — Data centre facilities and infrastructures — Part 4-1:
Overview of and general requirements for key performance indicators
EN 50600-4-2, Information technology — Data centre facilities and infrastructures — Part 4-2: Power
Usage Effectiveness
EN 50600-4-3, Information technology — Data centre facilities and infrastructures — Part 4-3:
Renewable Energy Factor
EN 50600-4-6, Information technology — Data centre facilities and infrastructures — Part 4-6: Energy
Reuse Factor
EN 50600-4-7, Information technology — Data centre facilities and infrastructures — Part 4-7: Cooling
Efficiency Ratio
CLC/TS 50600-2-10: Information technology — Data centre facilities and infrastructures — Part 2-10:
Earthquake risk and impact analysis
CLC/TR 50600-99-1, Information technology — Data centre facilities and infrastructures — Part 99-1:
Recommended practices for energy management
CLC/TR 50600-99-2, Information technology — Data centre facilities and infrastructures — Part 99-2:
Recommended practices for environmental sustainability
CLC/TR 50600-99-3, Information technology — Data centre facilities and infrastructures — Part 99-3:
Guidance to the application of EN 50600 series.
The inter-relationship of the documents within the EN 50600 series is shown in Figure 1.
6

---------------------- Page: 8 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)

Figure 1 — Schematic relationship between the EN 50600 series of documents
EN 50600-2-X documents specify requirements and recommendations for particular facilities and
infrastructures to support the relevant classification for “availability”, “physical security” and “energy
efficiency enablement” selected from EN 50600-1.
EN 50600-3-X documents specify requirements and recommendations for data centre operations,
processes and management.
EN 50600-4-X documents specify requirements and recommendations for key performance indicators
(KPIs) used to assess and improve the resource usage efficiency and effectiveness, respectively, of a
data centre.
The Directorate-General Joint Research Centre (DG JRC) of the European Commission operates a
Code of Conduct for Data Centre Energy Efficiency (CoC) scheme. In support of the scheme, a “best
practices” document has been established by DG JRC. To enhance the visibility, these Best Practices
have been converted in this document to create recommended Practices for improving the energy
management (i.e. reduction of energy consumption and/or increases in energy efficiency) of data
centres.
The areas addressed are:
— physical building;
— mechanical and electrical equipment;
— computer room;
— cabinets/racks;
— ICT equipment;
— operating systems;
— virtualization;
— software;
— business practices.
7

---------------------- Page: 9 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
The Practices are separated into Expected Practices as referenced in the CoC (see Clause 5) and
other Practices which can be employed as optional or alternative solutions in particular cases
(see Clause 6). Practices under consideration for the next or future revision/amendment of this
document are included in Clause 7. During the maintenance of this document, the Practices of
Clauses 6 and 7 might be augmented and others might migrate into Clause 5.
The Practices listed in Clauses 5, 6 and 7 are referenced as x.yyy where x is the clause number and
yyy is a sequential number starting within each (sub-)clause.
Customers or suppliers of information and communication technology (ICT) services might also find it
useful to request or provide a list of the Practices of this document that are implemented in a data
centre to assist in procurement of services that meet their environmental or sustainability standards.
This document also:
— acts as an education and reference document to assist data centre operators in identifying and
implementing measures to improve the energy management of their data centres;
— provides a common terminology and frame of reference for describing an energy management
practice, avoiding doubt or confusion over terminology.
8

---------------------- Page: 10 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
1 Scope
This document is a compilation of recommended Practices for improving the energy management (i.e.
reduction of energy consumption and/or increases in energy efficiency) of data centres.
NOTE It is historically aligned with the EU Code of Conduct for Data Centre Energy Efficiency (CoC)
scheme operated by the Directorate-General Joint Research Centre (DG JRC) of the European Commission
(EC), however contains additional practices.
It is recognized that the Practices included might not be universally applicable to all scales and
business models of data centres or be undertaken by all parties involved in data centre operation,
ownership or use.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
EN 14511 series, Air conditioners, liquid chilling packages and heat pumps for space heating and
cooling and process chillers, with electrically driven compressors
EN 50600-1:2019, Information technology - Data centre facilities and infrastructures - Part 1: General
concepts
EN 50600 series, Information technology — Data centre facilities and infrastructures
3 Terms, definitions and abbreviations
3.1 Terms and definitions
For the purposes of this document, the terms and definitions in the EN 50600 series and the following
apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
— IEC Electropedia: available at http://www.electropedia.org/
— ISO Online browsing platform: available at https://www.iso.org/obp
3.1.1
airflow pathway
route taken by air to reach a specific point
3.1.2
albedo
diffuse reflectivity or reflecting power of a surface
3.1.3
availability
ability of an item to be in a state to perform a required function under given conditions at a given instant
of time or over a given time interval, assuming that the required external resources are provided
[SOURCE: EN 50600-1:2019, 3.1.1]
9

---------------------- Page: 11 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
3.1.4
cable management system
system used for the support and/or containment, retention, protection of all types of cables, information
and communication lines, electrical power distribution conductors and their associated accessories
(includes ducts and tubes housing, or intended to house, blown information technology cables and/or
cable elements)
[SOURCE: EN 50174-1:2018, 3.1.9]
3.1.5
co-location data centre
data centre in which multiple customers locate their own network(s), servers and storage equipment
Note 1 to entry: The support infrastructure of the building (such as power distribution and environmental control)
is provided as a service by the data centre operator.
[SOURCE: EN 50600-1:2019, 3.1.6]
3.1.6
computer room space
area within the data centre that accommodates the data processing, data storage and
telecommunication equipment that provides the primary function of the data centre
[SOURCE: EN 50600-1:2019, 3.1.7]
3.1.7
computer room air conditioning/computer room air handling
CRAC/CRAH
equipment that provides cooling airflow volumes into a computer room as a means of environmental
control
Note 1 to entry: Other abbreviations such as CCU, DFU, RACU, UFU are sometimes used to refer to such
equipment.
3.1.8
cooling economizer
system to enable the use of cool external condition to provide cooling to internal data centre spaces
without the use of mechanical cooling or refrigeration
Note 1 to entry: Also referenced as “free cooling”.
Note 2 to entry: Free cooling / economised cooling designs take advantage of cool ambient conditions to meet
part or all of the facilities’ cooling requirements so that the dependency on any form of mechanical cooling
including compressors is reduced or even removed entirely, which can result in significant energy reduction.
Note 3 to entry: The opportunities for the utilization of free cooling are increased in cooler and dryer climates
and where increased temperature set points are used. Where refrigeration plant can be reduced in size (or
eliminated), operating and capital cost are reduced, including that of the required supporting electrical
infrastructure.
Note 4 to entry: Free cooling can be retrofitted to some facilities.
3.1.9
data centre
structure, or group of structures, dedicated to the centralized accommodation, interconnection and
operation of information technology and network telecommunications equipment providing data
storage, processing and transport services together with all the facilities and infrastructures for power
distribution and environmental control together with the necessary levels of resilience and security
required to provide the desired service availability
10

---------------------- Page: 12 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
Note 1 to entry: A structure can consist of multiple buildings and/or spaces with specific functions to support the
primary function.
Note 2 to entry: The boundaries of the structure or space considered the data centre which includes the
information and communication technology equipment and supporting environmental controls can be defined
within a larger structure or building.
[SOURCE: EN 50600-1:2019, 3.1.9]
3.1.10
direct liquid-cooled ICT equipment
ICT equipment that is cooled by a direct flow of liquid into an equipment cabinet or directly to the ICT
equipment chassis to provide cooling rather than the use of moving air
3.1.11
energy efficiency
measure of the work done (as a result of design and/or operational procedures) for a given amount of
energy consumed
3.1.12
energy management
combination of reduced energy consumption and increased energy efficiency, re-use of energy and
use of renewable energy
Note 1 to entry: See also EN 50600-3-1 for another definition of energy management.
3.1.13
enterprise data centre
data centre that is operated by an enterprise which has the sole purpose of the delivery and
management of services to its employees and customers
[SOURCE: EN 50600-1:2019, 3.1.14]
3.1.14
grid
interconnection of ICT resources in multiple locations to achieve a common objective
3.1.15
hot aisle/cold aisle
construction of cabinets and containment intended to prevent the mixing of ICT equipment
intake and exhaust air within computer room space(s)
3.1.16
information and communication technology equipment
ICT equipment
information technology (IT) and network telecommunications (NT) equipment providing data storage,
processing and transport services
Note 1 to entry: Representing the “critical load” of the data centre.
3.1.17
insolation
total amount of solar radiation energy received on a given surface area during a given time
3.1.18
make-up air
air introduced into a data centre space to replace air that is exhausted through ventilation or
combustion processes
11

---------------------- Page: 13 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
3.1.19
managed service
data centre operated to provide a defined set of services to its clients either proactively or as the
managed service provider (not the client) determines that services are needed
3.1.20
rack
open construction, typically self-supporting and floor-mounted, for housing closures and other
information technology equipment
[SOURCE: EN 50174-1:2018, 3.1.34]
3.1.21
resilience
ability to withstand and reduce the magnitude and/or duration of disruptive events, which includes the
capability to anticipate, absorb, adapt to, and/or rapidly recover from such an event
[SOURCE: IEEE Technical Report PES-TR65]
3.1.22
set-point
desired or target value (maximum or minimum) for either temperature or humidity
3.1.23
virtualization
creation of a virtual version of physical ICT equipment or resource to offer a more efficient use of ICT
hardware
3.2 Abbreviations
For the purposes of this document, the following abbreviations apply in addition to those of the
EN 50600 series.
AC Alternating current
ASHRAE Formerly “American Society of Heating, Refrigeration and Air conditioning
Engineers”
BIOS Basic input/output system
BREEAM Building Research Establishment Environmental Assessment Methodology
CoC EC DG JRC Code of Conduct for Data Centre Energy Efficiency
CRAC/CRAH Computer room air conditioning/computer room air handling
DC Direct current
DCiE Data centre infrastructure efficiency
DCIM Data centre infrastructure management
DG JRC Directorate-General Joint Research Council of the European Commission
DX Direct expansion
EC European Commission
ICT Information and communications technology
IP Internet protocol
IT Information technology
12

---------------------- Page: 14 ----------------------
SIST-TP CLC/TR 50600-99-1:2021
CLC/TR 50600-99-1:2021 (E)
ITIL Information Technology Infrastructure Library
LCA Life cycle assessment
LEED Leadership in Energy and Environmental Design
MERV Minimum Efficiency Reporting Value
NT Network telecommunications
PDU Power distribution unit
PSU Power supply unit
PUE Power usage effectiveness
REF Renewable Energy Factor
SLA Service level agreement
SMASH Systems Management Architecture for Server Hardware
SNMP Simple network management protocol
SPEC Standard Performance Evaluation Corporation
UPS Uninterruptible power supply
4 Principles
4.1 General
Clauses 5 to 7 contain the full list of energy management Practices of this document.
Clause 5 contains those Practices that are considered “Expected Practices” of the CoC and which are
listed under the following situations (see Table 1 to Table 4):
a) existing data centres (example);
b) ICT equipment (new or replacement);
c) software install or upgrade;
d) new build or refurbishment of data centres.
Clause 6 contains those Practices that are considered as optional or alternative within the CoC
scheme (see Table 5 to Table 8).
Under each heading the recommended Practices of Clauses 5 and 6 are based upon the categories
described in 4.2 to 4.8.
Each practice has been assigned a qualitative value (1 to 5) to indicate the level of benefit to be
expected from its implementation and, therefore, the relative pri
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.