EN IEC 62239-1:2018
(Main)Process management for avionics - Management plan - Part 1: Preparation and maintenance of an electronic components management plan
Process management for avionics - Management plan - Part 1: Preparation and maintenance of an electronic components management plan
IEC 62239-1:2018 defines the requirements for developing an electronic components management plan (ECMP) to guarantee to customers that all of the electronic components in the equipment of the plan owner are selected and applied in controlled processes compatible with the end application and that the technical requirements detailed in Clause 4 are accomplished. In general, the plan owner of a complete electronic components management plan (ECMP) is the avionics original equipment manufacturer (OEM). This first edition cancels and replaces IEC TS 62239-1 published in 2015. This edition includes the following significant technical changes with respect to the previous edition: a) added references to SAE EIA-STD-4899, IECQ OD 3702, IECQ OD 3407-1, IEC TR 62240-2, IECQ component schemes, SAE AS6081, SAE AS6171. GEIA-STD-0005-1 GEIA STD 0008; b) replaced Annex C (which was transferred into IEC TR 62240-2) with a cross-reference table to SAE EIASTD4899 rev C clauses/ subclauses for guidance purposes only; c) added the analysis of component technical erratum d) updated Bibliography and reference documents
Luftfahrtelektronik-Prozessmanagement - Managementplan - Teil 1: Erstellung und Überarbeitung eines Managementplanes für elektronische Bauelemente
Gestion des processus pour l'avionique - Plan de gestion - Partie 1: Préparation et maintenance d'un plan de gestion des composants électroniques
l’IEC 62239-1:2018 définit les exigences pour la mise au point d'un plan de gestion des composants électroniques (ECMP) permettant de garantir que tous les composants électroniques de l'équipement du propriétaire du plan sont choisis et appliqués dans le cadre de processus contrôlés, compatibles avec l'application finale, et que les exigences techniques détaillées à l'Article 4 sont satisfaites. En général, le propriétaire d’un plan de gestion des composants électroniques (ECMP) complet est le fabricant d'équipements avioniques d'origine (OEM). Cette première édition annule et remplace la première édition de l’IEC TS 62239-1 parue en 2015. Cette édition inclut les modifications techniques majeures suivantes par rapport à l'édition précédente: a) ajout de références aux spécifications SAE EIA-STD-4899, IECQ OD 3702, IECQ OD 3407-1, IEC TR 62240-2, schémas de composants IECQ, SAE AS6081, SAE AS6171. GEIA-STD-0005-1 GEIA STD 0008; b) remplacement de l’Annexe C (transférée dans l'IEC TR 62240-2) par une table de références croisées avec les articles/paragraphes de la SAE EIASTD4899 rév. C, à titre de recommandation uniquement; c) ajout d’un erratum technique relatif à l’analyse des composants d) mise à jour de la Bibliographie et documents de référence
Upravljanje procesov v avioniki - Načrt upravljanja - 1. del: Priprava in vzdrževanje načrta upravljanja elektronskih komponent
IEC 62239-1:2018 določa zahteve za razvoj načrta upravljanja elektronskih komponent (ECMP), ki strankam zagotavlja, da so vse elektronske komponente v opremi lastnika načrta izbrane in uporabljene v nadzorovanih procesih, združljivih s končno uporabo, in da so izpolnjene tehnične zahteve, navedene v točki 4. Na splošno je lastnik načrta upravljanja elektronskih komponent (ECMP) proizvajalec originalne opreme za letalstvo (OEM).
Prva izdaja razveljavlja in nadomešča standard IEC TS 62239-1, objavljen leta 2015. Ta izdaja vključuje naslednje pomembne tehnične spremembe glede na prejšnjo izdajo:
a) dodane reference na SAE EIA-STD-4899, IECQ OD 3702, IECQ OD 3407-1, IEC TR 62240-2, sheme komponent IECQ, SAE AS6081, SAE AS6171. GEIA-STD-0005-1 GEIA STD 0008;
b) zamenjan dodatek C (prenesen v IEC TR 62240-2), ki vključuje preglednico za navzkrižno sklicevanje na točke/podtočke standarda SAE EIASTD4899 rev C (samo kot vodilo);
c) dodana analiza tehnične napake komponente;
d) posodobljena bibliografija in referenčni dokumenti.
General Information
Standards Content (Sample)
SLOVENSKI STANDARD
01-februar-2019
8SUDYOMDQMHSURFHVRYYDYLRQLNL1DþUWXSUDYOMDQMDGHO3ULSUDYDLQY]GUåHYDQMH
QDþUWDXSUDYOMDQMDHOHNWURQVNLKNRPSRQHQW
Process management for avionics - Management plan - Part 1: Preparation and
maintenance of an electronic components management plan
Luftfahrtelektronik-Prozessmanagement -Managementplan - Teil 1: Erstellung und
Überarbeitung eines Managementplanes für elektronische Bauelemente
Gestion des processus pour l'avionique - Plan de gestion - Partie 1: Préparation et
maintenance d'un plan de gestion des composants électroniques
Ta slovenski standard je istoveten z: EN IEC 62239-1:2018
ICS:
03.100.50 Proizvodnja. Vodenje Production. Production
proizvodnje management
31.020 Elektronske komponente na Electronic components in
splošno general
49.060 /HWDOVNDLQYHVROMVND Aerospace electric
HOHNWULþQDRSUHPDLQVLVWHPL equipment and systems
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EUROPEAN STANDARD EN IEC 62239-1
NORME EUROPÉENNE
EUROPÄISCHE NORM
December 2018
ICS 03.100.50; 31.020; 49.060
English Version
Process management for avionics - Management plan - Part 1:
Preparation and maintenance of an electronic components
management plan
(IEC 62239-1:2018)
Gestion des processus pour l'avionique - Plan de gestion - Luftfahrtelektronik-Prozessmanagement - Managementplan
Partie 1: Préparation et maintenance d'un plan de gestion - Teil 1: Erarbeitung und Instandhaltung eines
des composants électroniques Managementplanes für elektronische Bauelemente
(IEC 62239-1:2018) (IEC 62239-1:2018)
This European Standard was approved by CENELEC on 2018-10-29. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN IEC 62239-1:2018 E
European foreword
The text of document 107/320/CDV, future edition 1 of IEC 62239-1, prepared by IEC/TC 107
"Process management for avionics" was submitted to the IEC-CENELEC parallel vote and approved
by CENELEC as EN IEC 62239-1:2018.
The following dates are fixed:
• latest date by which the document has to be implemented at national (dop) 2019-07-29
level by publication of an identical national standard or by endorsement
• latest date by which the national standards conflicting with the (dow) 2021-10-29
document have to be withdrawn
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.
Endorsement notice
The text of the International Standard IEC 62239-1:2018 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following note has to be added for the standard indicated:
IEC 60068-2-58 NOTE Harmonized as EN 60068-2-58
IEC 60695-11-5 NOTE Harmonized as EN 60695-11-5
IEC 61193-2 NOTE Harmonized as EN 61193-2
IEC 61340-5-1 NOTE Harmonized as EN 61340-5-1
IEC/TR 61340-5-2 NOTE Harmonized as CLC/TR 61340-5-2
IEC 61760-4 NOTE Harmonized as EN 61760-4
IEC 61967 (series) NOTE Harmonized as EN 61967 (series)
IEC 61967-1 NOTE Harmonized as EN 61967-1
IEC 62435-1 NOTE Harmonized as EN 62435-1
IEC 62132 (series) NOTE Harmonized as EN 62132 (series)
IEC 62402 NOTE Harmonized as EN 62402
IEC 62435-1 NOTE Harmonized as EN 62435-1
ISO 9000 NOTE Harmonized as EN ISO 9000
ISO 9001 NOTE Harmonized as EN ISO 9001
ISO 9004 NOTE Harmonized as EN ISO 9004
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1 Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year
IEC 62396 series Process management for avionics - Atmospheric - -
radiation effects
IEC 62396-1 2016 Process management for avionics - Atmospheric - -
radiation effects - Part 1: Accommodation of
atmospheric radiation effects via single event effects
within avionics electronic equipment
IEC/TS 62647-1 - Process management for avionics - Aerospace and - -
defence electronic systems containing lead-free
solder - Part 1: Preparation for a lead-free control plan
GEIA-STD-0005-1 - Performance Standard for Aerospace and High - -
Performance Electronic Systems Containing Lead-
Free Solder
IPC/JEDEC J- - Moisture/Reflow Sensitivity Classification for - -
STD-20 Nonhermetic Solid State Surface Mount Devices
IEC 62239-1 ®
Edition 1.0 2018-09
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
colour
inside
Process management for avionics – Management plan –
Part 1: Preparation and maintenance of an electronic components management
plan
Gestion des processus pour l'avionique – Plan de gestion –
Partie 1: Préparation et maintenance d'un plan de gestion des composants
électroniques
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
INTERNATIONALE
ICS 03.100.50; 31.020; 49.060 ISBN 978-2-8322-6033-3
– 2 – IEC 62239-1:2018 © IEC 2018
CONTENTS
FOREWORD . 4
INTRODUCTION . 6
1 Scope . 7
2 Normative references . 7
3 Terms, definitions and abbreviated terms . 8
3.1 Terms and definitions . 8
3.2 Abbreviated terms . 12
4 Technical requirements . 14
4.1 General . 14
4.2 Component selection . 14
4.2.1 General. 14
4.2.2 Application conditions for use . 15
4.2.3 Availability and durability . 15
4.2.4 Additional performance . 15
4.2.5 Component identification . 15
4.3 Component application . 16
4.3.1 General. 16
4.3.2 Electromagnetic compatibility (EMC) . 16
4.3.3 Derating and stress analysis . 16
4.3.4 Thermal analysis . 18
4.3.5 Mechanical analysis . 18
4.3.6 Testing, testability, and maintainability . 19
4.3.7 Avionics radiation environment . 19
4.3.8 Management of lead-free termination finish and soldering . 19
4.3.9 Counterfeited, fraudulent and recycled component avoidance . 20
4.3.10 Moisture and corrosion . 20
4.3.11 Additional customer related application requirements . 20
4.4 Component qualification . 20
4.4.1 General. 20
4.4.2 Minimum component qualification requirements . 21
4.4.3 Original component manufacturer quality management . 21
4.4.4 Original component manufacturer process management approval . 21
4.4.5 Demonstration of component qualification . 22
4.4.6 Qualification of components from a supplier that is not qualified . 23
4.4.7 Distributor process management approval . 24
4.4.8 Subcontractor assembly facility quality and process management
approval . 24
4.5 Continuous component quality assurance . 25
4.5.1 General quality assurance requirements . 25
4.5.2 Ongoing component quality assurance . 25
4.5.3 Plan owner in-house continuous monitoring . 25
4.5.4 Component design and manufacturing process change monitoring . 26
4.6 Component dependability . 26
4.6.1 General. 26
4.6.2 Component availability and associated risk assessment . 26
4.6.3 Component obsolescence . 27
4.6.4 Proactive measures . 27
IEC 62239-1:2018 © IEC 2018 – 3 –
4.6.5 Component obsolescence awareness . 27
4.6.6 Reporting . 27
4.6.7 Semiconductor reliability, wear out and lifetime . 28
4.6.8 Reliability assessment . 28
4.7 Component compatibility with the equipment manufacturing process . 28
4.8 Component data . 29
4.8.1 General. 29
4.8.2 Minimum component data requirements . 30
4.9 Configuration control . 30
4.9.1 General. 30
4.9.2 Alternative components. 30
4.9.3 Alternative sources . 30
4.9.4 Equipment change documentation .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.