General Information

Abstract

IEC 60079-13:2017(E) gives requirements for the design, construction, assessment, verification and marking of rooms used to protect internal equipment by pressurization or artificial ventilation or both as applicable when located in an explosive gas atmosphere or combustible dust atmosphere hazardous area with or without an internal source of a flammable gas or vapour. It also includes a room located in a non-hazardous area that has an internal source of release of a flammable gas or vapour. This document deals with rooms that are partially constructed in a manufacturer’s facility and intended to have the final installation completed on-site, as well as rooms that are constructed completely on-site. Rooms partially constructed in a manufacturer’s facility may include third-party verification. For rooms built on-site, this document can be used by plant operators as a guide for assessment of those facilities. This document represents a major technical revision of the requirements for equipment protection by pressurized room "p" and artificially ventilated room "v" and should be considered as introducing all new requirements. This second edition cancels and replaces the first edition published in 2010. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - modification of the title of this document to include artificially ventilated room "v" in addition to pressurized room "p"; - addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px", "py", "pz" and "pv"; - definition of the differences between pressurization and artificial ventilation types of protection; - removal of protection of rooms with an inert gas or a flammable gas from the scope of this document; - addition of an informative annex to include examples of applications where types of protection pressurization or artificial ventilation or pressurization and artificial ventilation can be used and associated guidelines. Additional information regarding the scope of this document can be found in Clause 1.

Status
Published
Publication Date
05-Oct-2017
Withdrawal Date
05-Oct-2020
Current Stage
9093 - Decision to confirm - Review Enquiry
Start Date
05-Jan-2026
Completion Date
25-Aug-2026

Buy Documents

Standard

EN 60079-13:2018

English language (38 pages)
Preview
Preview
e-Library read for
1 day

Overview

EN 60079-13:2017 (CLC adoption of IEC 60079-13:2017) covers requirements for design, construction, assessment, verification and marking of rooms that protect internal equipment by pressurization ("p"), artificial ventilation ("v"), or a combination of both, when located in explosive gas or combustible dust hazardous areas - including rooms in non-hazardous areas with internal sources of flammable gas or vapour. The edition introduces significant technical changes (addition of types pb/pc/vc, revised definitions of pressurization vs artificial ventilation, new application guidance and updated verification/marking requirements). It applies to rooms fully built on-site or partially pre-fabricated in a manufacturer’s facility (third‑party verification possible).

Key Topics and Requirements

  • Types of protection: Clear definitions and use-cases for pressurized room "p" and artificially ventilated room "v"; new protection subtypes (pb, pc, vc).
  • Design & construction: Structural integrity, seals, penetrations, doors, ducts and HVAC considerations to prevent ingress of explosive atmospheres.
  • Clean air supply: Source, environmental and temperature conditions, and required supply characteristics.
  • Pressurization specifics: Pressurization systems, minimum pressure differential, airlocks, outward air velocity through doors, fail-safe actions and re‑energizing procedures.
  • Artificial ventilation specifics: Minimum ventilation flow rates, ventilation system design, safety actions on loss of ventilation.
  • Purging & cleaning: Procedures and sequences for purging rooms (gases) and dust cleaning; safety device sequencing during purging.
  • Safety devices and monitoring: Required safety devices, gas detectors, electrical disconnects and actions tied to protection level.
  • Verification & testing: Overpressure tests, purging tests, minimum pressure/flow rate tests, sequence-of-operation verification, and commissioning checks.
  • Marking & documentation: Mandatory marking conventions and technical documentation for pressurized, ventilated, or combined rooms.
  • Maintenance & guidance: Informative annexes on maintenance, temporary loss of protection, and application examples (e.g., gas turbine enclosures).

Practical Applications

  • Protecting electrical and control equipment located in hazardous areas (oil & gas facilities, petrochemical plants, power generation, dust-prone processing plants).
  • Enclosures for gas turbines, motors, switchgear, instrumentation rooms and prefabricated equipment shelters.
  • Use by manufacturers of prefabricated rooms and by plant operators assessing on-site constructed rooms.

Who Should Use This Standard

  • Design engineers and system integrators
  • Safety and compliance engineers
  • Manufacturers of pressurized/ventilated enclosures
  • Certification bodies and third‑party verifiers
  • Plant operators and maintenance teams

Related Standards

EN/IEC 60079 series (e.g., EN 60079-0, EN 60079-10-1, EN 60079-14, EN 60079-17), EN 60529, EN 61285 and functional safety standards EN 61508 / EN 61511 are referenced for complementary requirements and testing.

Relations

Effective Date
07-Jun-2022
Effective Date
10-Feb-2026
Effective Date
09-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026
Effective Date
09-Feb-2026
Effective Date
09-Feb-2026
Effective Date
09-Feb-2026
Effective Date
09-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026
Effective Date
03-Feb-2026

Buy Documents

Standard

EN 60079-13:2018

English language (38 pages)
Preview
Preview
e-Library read for
1 day

Get Certified

Connect with accredited certification bodies for this standard

IMQ S.p.A. (Certification)

Italian electrical product certification.

ACCREDIA Italy Verified

SLG Prüf- und Zertifizierungs GmbH

German testing and certification body.

DAKKS Germany Verified

UL Solutions

Global safety science company with testing, inspection and certification.

ANAB United States Verified

Sponsored listings

Frequently Asked Questions

EN 60079-13:2017 is a standard published by CLC. Its full title is "Explosive atmospheres - Part 13: Equipment protection by pressurized room "p" and artificially ventilated room "v"". This standard covers: IEC 60079-13:2017(E) gives requirements for the design, construction, assessment, verification and marking of rooms used to protect internal equipment by pressurization or artificial ventilation or both as applicable when located in an explosive gas atmosphere or combustible dust atmosphere hazardous area with or without an internal source of a flammable gas or vapour. It also includes a room located in a non-hazardous area that has an internal source of release of a flammable gas or vapour. This document deals with rooms that are partially constructed in a manufacturer’s facility and intended to have the final installation completed on-site, as well as rooms that are constructed completely on-site. Rooms partially constructed in a manufacturer’s facility may include third-party verification. For rooms built on-site, this document can be used by plant operators as a guide for assessment of those facilities. This document represents a major technical revision of the requirements for equipment protection by pressurized room "p" and artificially ventilated room "v" and should be considered as introducing all new requirements. This second edition cancels and replaces the first edition published in 2010. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - modification of the title of this document to include artificially ventilated room "v" in addition to pressurized room "p"; - addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px", "py", "pz" and "pv"; - definition of the differences between pressurization and artificial ventilation types of protection; - removal of protection of rooms with an inert gas or a flammable gas from the scope of this document; - addition of an informative annex to include examples of applications where types of protection pressurization or artificial ventilation or pressurization and artificial ventilation can be used and associated guidelines. Additional information regarding the scope of this document can be found in Clause 1.

IEC 60079-13:2017(E) gives requirements for the design, construction, assessment, verification and marking of rooms used to protect internal equipment by pressurization or artificial ventilation or both as applicable when located in an explosive gas atmosphere or combustible dust atmosphere hazardous area with or without an internal source of a flammable gas or vapour. It also includes a room located in a non-hazardous area that has an internal source of release of a flammable gas or vapour. This document deals with rooms that are partially constructed in a manufacturer’s facility and intended to have the final installation completed on-site, as well as rooms that are constructed completely on-site. Rooms partially constructed in a manufacturer’s facility may include third-party verification. For rooms built on-site, this document can be used by plant operators as a guide for assessment of those facilities. This document represents a major technical revision of the requirements for equipment protection by pressurized room "p" and artificially ventilated room "v" and should be considered as introducing all new requirements. This second edition cancels and replaces the first edition published in 2010. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - modification of the title of this document to include artificially ventilated room "v" in addition to pressurized room "p"; - addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px", "py", "pz" and "pv"; - definition of the differences between pressurization and artificial ventilation types of protection; - removal of protection of rooms with an inert gas or a flammable gas from the scope of this document; - addition of an informative annex to include examples of applications where types of protection pressurization or artificial ventilation or pressurization and artificial ventilation can be used and associated guidelines. Additional information regarding the scope of this document can be found in Clause 1.

EN 60079-13:2017 is classified under the following ICS (International Classification for Standards) categories: 29.260.20 - Electrical apparatus for explosive atmospheres. The ICS classification helps identify the subject area and facilitates finding related standards.

EN 60079-13:2017 has the following relationships with other standards: It is inter standard links to EN 60079-13:2010, IEC 60050-426:2008, EN 14133:2003, EN IEC 60079-10-1:2021, EN IEC 60079-0:2018, EN IEC 60079-29-0:2026, EN 1473:2016, EN 1473:2021, EN 16314:2013, EN 12405-2:2012, EN 60079-19:2011, EN IEC 61800-1:2021, EN 60079-29-2:2015, EN 60079-29-4:2010, prEN IEC 60335-2-11:2025. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

EN 60079-13:2017 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
01-februar-2018
1DGRPHãþD
SIST EN 60079-13:2011
(NVSOR]LYQHDWPRVIHUHGHO=DãþLWDRSUHPH]]DSUWLPLSURVWRUL]QDGWODNRP
SLQXPHWQRSUH]UDþHYDQLSURVWRUL ,(&
Explosive atmospheres - Part 13: Equipment protection by pressurized room "p" and
artificially ventilated room "v" (IEC 60079-13:2017)
Explosionsgefährdete Bereiche - Teil 13: Schutz von Einrichtungen durch einen
überdruckgekapselten Raum "p" und einen fremdbelüfteten Raum "v" (IEC 60079-
13:2017)
Atmosphères explosives - Partie 13: Protection du matériel par salle à surpression
interne "p" et salle ventilée artificiellement "v" (IEC 60079-13:2017)
Ta slovenski standard je istoveten z: EN 60079-13:2017
ICS:
29.260.20 (OHNWULþQLDSDUDWL]D Electrical apparatus for
HNVSOR]LYQDR]UDþMD explosive atmospheres
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN STANDARD EN 60079-13

NORME EUROPÉENNE
EUROPÄISCHE NORM
October 2017
ICS 29.260.20 Supersedes EN 60079-13:2010
English Version
Explosive atmospheres - Part 13: Equipment protection by
pressurized room "p" and artificially ventilated room "v"
(IEC 60079-13:2017)
Atmosphères explosives - Partie 13: Protection du matériel Explosionsgefährdete Bereiche - Teil 13: Schutz von
par salle à surpression interne "p" et salle ventilée Einrichtungen durch einen überdruckgekapselten Raum "p"
artificiellement "v" und einen fremdbelüfteten Raum "v"
(IEC 60079-13:2017) (IEC 60079-13:2017)
This European Standard was approved by CENELEC on 2017-06-26. CENELEC members are bound to comply with the CEN/CENELEC
Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC
Management Centre or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation
under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the
same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic,
Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden,
Switzerland, Turkey and the United Kingdom.

European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels
© 2017 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members.
Ref. No. EN 60079-13:2017 E
European foreword
The text of document 31/1309/FDIS, future edition 2 of IEC 60079-13, prepared by
IEC/TC 31 "Equipment for explosive atmospheres" was submitted to the IEC-CENELEC parallel vote
and approved by CENELEC as EN 60079-13:2017.

The following dates are fixed:
(dop) 2018-04-06
• latest date by which the document has to be
implemented at national level by
publication of an identical national
standard or by endorsement
• latest date by which the national (dow) 2020-10-06
standards conflicting with the
document have to be withdrawn
This document supersedes EN 60079-13:2010.

Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights.

Endorsement notice
The text of the International Standard IEC 60079-13:2017 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:

IEC 60079-2 NOTE Harmonized as EN 60079-2.
IEC 60079-14 NOTE Harmonized as EN 60079-14.
IEC 60079-17 NOTE Harmonized as EN 60079-17.
IEC 60529 NOTE Harmonized as EN 60529.
IEC 61285 NOTE Harmonized as EN 61285.
IEC 61508 Series NOTE Harmonized as EN 61508 Series.
IEC 61511 Series NOTE Harmonized as EN 61511 Series.
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications

The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments)
applies.
NOTE 1 Where an International Publication has been modified by common modifications, indicated by (mod), the relevant
EN/HD applies.
NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here:
www.cenelec.eu.
Publication Year Title EN/HD Year

IEC 60050-426 -  International Electrotechnical Vocabulary - - -
Part 426: Equipment for explosive
atmospheres
IEC 60079-0 -  Explosive atmospheres - EN 60079-0 -
Part 0: Equipment - General requirements
IEC 60079-10-1 -  Explosive atmospheres - EN 60079-10-1 -
Part 10-1: Classification of areas -
Explosive gas atmospheres
IEC 60079-29 Series Explosive atmospheres - EN 60079-29 Series
Part 29: Gas detectors
IEC 60079-13 ®
Edition 2.0 2017-05
INTERNATIONAL
STANDARD
Explosive atmospheres –
Part 13: Equipment protection by pressurized room "p" and artificially ventilated

room "v"
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
ICS 29.260.20 ISBN 978-2-8322-4326-8

– 2 – IEC 60079-13:2017 © IEC 2017
CONTENTS
FOREWORD . 5
INTRODUCTION . 7
1 Scope . 8
2 Normative references . 10
3 Terms and definitions . 11
4 Requirements for all rooms . 13
4.1 General . 13
4.2 Type and level of protection . 13
4.2.1 Pressurization "p" . 13
4.2.2 Artificial ventilation "v" . 14
4.3 Construction . 14
4.4 Mechanical strength . 14
4.5 Penetrations and seals . 14
4.6 Personnel access doors . 14
4.7 Inlets and outlets . 15
4.8 Ducts . 15
4.9 Purging and cleaning . 15
4.9.1 General . 15
4.9.2 Gases – Purging . 15
4.9.3 Enclosures within the room . 16
4.10 Ignition prevention under system failure . 16
5 Clean air supply. 16
5.1 General . 16
5.2 Source of clean air . 16
5.3 Environmental and air temperature conditions . 17
5.4 Heating, ventilation and air conditioning services . 17
6 Requirements for pressurized rooms . 17
6.1 General . 17
6.1.1 Design . 17
6.1.2 Source of clean air . 17
6.1.3 Flow . 17
6.1.4 Pressurization system . 17
6.1.5 Preventing the explosive atmosphere from entering through an open
door . 18
6.1.6 Airlock . 18
6.1.7 Outward air velocity through a door . 18
6.1.8 Air consuming device . 19
6.1.9 Action when pressurization system fails . 19
6.1.10 Re-energizing the room . 19
6.2 Purging of rooms . 19
6.2.1 General . 19
6.2.2 Sequence of operations of the purging safety devices . 20
6.2.3 Dusts – Cleaning . 20
6.3 Minimum safety provisions, safety devices and electrical disconnects . 20
6.3.1 Safety devices . 20
6.3.2 Safety devices based upon level of protection . 21

IEC 60079-13:2017 © IEC 2017 – 3 –
6.3.3 Gas detectors . 21
6.4 Verification for pressurized rooms . 21
6.4.1 General . 21
6.4.2 Tests . 21
6.4.3 Overpressure test . 22
6.4.4 Purging test . 22
6.4.5 Minimum pressure differential test . 22
6.4.6 Confirmation of the ratings of the safety devices . 22
6.4.7 Verification of sequence of operation of the safety devices . 22
7 Requirements for artificially ventilated rooms . 22
7.1 General . 22
7.1.1 Design . 22
7.1.2 Source of clean air . 22
7.1.3 Minimum flow rate . 23
7.1.4 Ventilation system . 23
7.1.5 Air consuming device . 24
7.1.6 Safety actions when ventilation system fails . 24
7.1.7 Energizing the artificially ventilated area . 24
7.2 Purging of artificially ventilated rooms . 25
7.2.1 General . 25
7.2.2 Sequence of operations of the purging safety devices . 25
7.3 Minimum safety provisions, safety devices and electrical disconnects . 25
7.3.1 Safety devices . 25
7.3.2 Safety devices based upon equipment protection level . 25
7.3.3 Artificial ventilation protection . 26
7.3.4 Gas detectors . 26
7.4 Loss of artificial ventilation . 26
7.5 Verification for artificially ventilated rooms . 27
7.5.1 General . 27
7.5.2 Tests . 27
7.5.3 Purging test . 27
7.5.4 Minimum ventilation flow rate test . 27
7.5.5 Confirmation of the ratings of the safety devices . 27
7.5.6 Verification of sequence of operation of the safety devices . 27
7.5.7 Testing of ventilation system . 28
8 Marking . 28
8.1 General . 28
8.2 Marking of pressurized rooms . 28
8.3 Marking for artificially ventilated rooms . 29
9 Instructions . 30
9.1 General . 30
9.2 Technical documentation for pressurized rooms . 30
9.3 Technical documentation for artificially ventilated rooms . 30
9.4 Technical documentation for rooms protected by pressurization and artificial
ventilation combined . 31
9.5 Modifications. 31
Annex A (informative) Maintenance. 32
A.1 Periodic verification . 32
A.2 Modifications. 32

– 4 – IEC 60079-13:2017 © IEC 2017
Annex B (informative) Guidelines when pressurization or artificial ventilation is not
immediately restored. 33
Annex C (informative) Examples of applications and associated guidelines . 34
C.1 Examples of applications . 34
C.2 Guidelines for gas turbine enclosure/package . 34
Bibliography . 35

Table 1 – Exclusion of specific clauses or subclauses of IEC 60079-0 . 9
Table 2 – Safety devices for pressurized rooms . 21
Table 3 – Safety actions for artificial ventilation failure . 24
Table 4 – Required safety devices for artificial ventilation . 26

IEC 60079-13:2017 © IEC 2017 – 5 –
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
EXPLOSIVE ATMOSPHERES –
Part 13: Equipment protection by pressurized
room "p" and artificially ventilated room "v"

FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
international co-operation on all questions concerning standardization in the electrical and electronic fields. To
this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC
Publication(s)"). Their preparation is entrusted to technical committees; any IEC National Committee interested
in the subject dealt with may participate in this preparatory work. International, governmental and non-
governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
with the International Organization for Standardization (ISO) in accordance with conditions determined by
agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence
between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
International Standard IEC 60079-13 has been prepared by IEC technical committee 31:
Equipment for explosive atmospheres
This second edition cancels and replaces the first edition published in 2010. This edition
constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous
edition:
a) modification of the title of this document to include artificially ventilated room "v" in
addition to pressurized room "p";
b) addition of types of protection "pb", "pc", and "vc" and removal of types of protection "px",
"py", "pz" and "pv";
c) definition of the differences between pressurization and artificial ventilation types of
protection;
– 6 – IEC 60079-13:2017 © IEC 2017
d) removal of protection of rooms with an inert gas or a flammable gas from the scope of this
document;
e) addition of an informative annex to include examples of applications where types of
protection pressurization or artificial ventilation or pressurization and artificial ventilation
can be used and associated guidelines.
The text of this document is based on the following documents:
FDIS Report on voting
31/1309/FDIS 31/1317/RVD
Full information on the voting for the approval of this document can be found in the report on
voting indicated in the above table.
This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.
This document is to be used in conjunction with the principles of hazardous area classification
from IEC 60079-10-1 and artificial ventilation for the protection of analyser(s) houses from
IEC 60079-16.
A list of all parts in the IEC 60079 series, published under the general title Explosive
atmospheres, can be found on the IEC website.
The committee has decided that the contents of this publication will remain unchanged until
the stability date indicated on the IEC website under "http://webstore.iec.ch" in the data
related to the specific publication. At this date, the publication will be
• reconfirmed,
• withdrawn,
• replaced by a revised edition, or
• amended.
A bilingual version of this publication may be issued at a later date.

IEC 60079-13:2017 © IEC 2017 – 7 –
INTRODUCTION
This part of IEC 60079 gives requirements for the design, construction, assessment,
verification and marking of rooms used to protect internal equipment by pressurization or
artificial ventilation or both as applicable when located in an explosive gas atmosphere or
combustible dust atmosphere hazardous area with or without an internal source of a
flammable gas or vapour. It also includes a room located in a non-hazardous area that has an
internal source of release of a flammable gas or vapour.
This document deals with rooms that are partially constructed in a manufacturer’s facility and
intended to have the final installation completed on-site, as well as rooms that are constructed
completely on-site. Rooms partially constructed in a manufacturer’s facility may include third-
party verification. For rooms built on-site, this document can be used by plant operators as a
guide for assessment of those facilities.
This document represents a major technical revision of the requirements for equipment
protection by pressurized room "p" and artificially ventilated room "v" and should be
considered as introducing all new requirements.

– 8 – IEC 60079-13:2017 © IEC 2017
EXPLOSIVE ATMOSPHERES –
Part 13: Equipment protection by pressurized
room "p" and artificially ventilated room "v"

1 Scope
This part of IEC 60079 gives requirements for the design, construction, assessment,
verification and marking of rooms used to protect internal equipment:
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere (an area
normally requiring an equipment protection level (EPL) Gb, Gc, Db or Dc) without an
internal source of gas/vapour release and protected by pressurization;
– located in a Zone 2 explosive atmosphere (an area normally requiring EPL Gc) with or
without an internal source of gas/vapour release and protected by artificial ventilation;
– located in a non-hazardous area, containing an internal source of gas/vapour release and
protected by artificial ventilation;
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere (an area
normally requiring EPL Gb, Gc, Db or Dc), containing an internal source of gas/vapour
release and protected by both pressurization and artificial ventilation.
The term "room" used in this document includes single rooms, multiple rooms, a complete
building or a room contained within a building. A room is intended to facilitate the entry of
personnel and includes inlet and outlet ducts. An acoustic hood and other like enclosures
designed to permit the entry of personnel can be considered as a room.
This document also includes requirements related safety devices and controls necessary to
ensure that artificial ventilation, purging and pressurization is established and maintained.
A room assembled or constructed on site, can be either on land or off-shore. The room is
primarily intended for installation by an end-user but could be constructed and assessed at a
manufacturer’s facility, where the final construction such as ducting can be completed on site.
Rooms can be located in an explosive gas atmosphere requiring EPL Gb or Gc, or a
combustible dust atmosphere requiring EPL Db, or Dc.
This document does not specify the methods that may be required to ensure adequate air
quality for personnel with regard to toxicity and temperature within the room. National or other
regulations and requirements may exist to ensure the safety of personnel in this regard.
Protection of rooms by using an inert gas or a flammable gas is outside of the scope of this
document. It is recognized that such applications are special cases, which in part may be
addressed using the principles from IEC 60079-2, but in all probability will also be the subject
of additional, stringent engineering standards, procedures and practices. Pressurized
enclosures for equipment that are not intended to facilitate the entry of personnel are
addressed in IEC 60079-2, and are not in the scope of this document.
NOTE Maintenance recommendations are contained in Annex A until they can be included in IEC 60079-17.
This document supplements and modifies the general requirements of IEC 60079-0, except
exclusions as indicated in Table 1. Where a requirement of this document conflicts with a
requirement of IEC 60079-0, the requirement of this document takes precedence.

IEC 60079-13:2017 © IEC 2017 – 9 –
Table 1 – Exclusion of specific clauses or subclauses of IEC 60079-0
Clause of IEC 60079-0
IEC 60079-0
Ed. 6.0 Clause / subclause title
application to
(2011) (Normative)
IEC 60079-13
(Informative)
4 Equipment grouping Applies
4.1 Group I Excluded
4.2 Group II Applies
4.3 Group III Applies
4.4 Equipment for a particular explosive atmosphere Applies
5.1 Environmental influences Applies
5.1.1 Ambient temperature Applies
5.1.2 External source of heating or cooling Applies
5.2 Service temperature Applies
5.3.1 Determination of maximum surface temperature Applies
5.3.2.1 Group I electrical equipment Excluded
5.3.2.2 Group II electrical equipment Applies
5.3.2.3 Group III electrical equipment Applies
5.3.3 Small component temperature for Group I and Group II electrical equipment Excluded
6.1 General Applies
6.2 Mechanical strength Excluded
6.3 Opening times Excluded
6.4 Circulating currents Excluded
6.5 Gasket retention Excluded
6.6 Electromagnetic and ultrasonic radiating equipment Applies
7.1 General Excluded
7.2 Thermal endurance Excluded
7.3 Resistance to light Modified
7.4 Electrostatic charges on external non-metallic materials Excluded
7.5 Accessible metal parts Excluded
8 Metallic enclosures and metallic parts of enclosures Excluded
9 Fasteners Excluded
10 Interlocking devices Excluded
11 Bushings Excluded
12 Materials used for cementing Excluded
13 Ex components Excluded
14 Connection facilities and termination compartments Excluded
15 Connection facilities for earthing and bonding conductors Excluded
16 Entries into enclosures Excluded
17 Supplementary requirements for rotating electrical machines Excluded
18 Supplementary requirements for switchgear Excluded
19 Supplementary requirements for fuses Excluded
20 Supplementary requirements for plugs and sockets Excluded
21 Supplementary requirements for luminaires Excluded
22 Supplementary requirements for caplights and handlights Excluded
23 Equipment incorporating cells and batteries Excluded
24 Documentation Applies
25 Compliance of prototype or sample with documents Applies
26.1 General Applies
26.2 Test configuration Applies
26.3 Tests in explosive test mixtures Excluded

– 10 – IEC 60079-13:2017 © IEC 2017
Clause of IEC 60079-0
IEC 60079-0
Ed. 6.0 Clause / subclause title
application to
(2011) (Normative)
IEC 60079-13
(Informative)
26.4 Tests of enclosures Excluded
26.5 Thermal tests Excluded
26.6 Torque test for bushings Excluded
26.7 Non-metallic enclosures or non-metallic parts of enclosures Excluded
26.8 Thermal endurance to heat Excluded
26.9 Thermal endurance to cold Excluded
26.10 Resistance to light Applies
26.11 Resistance to chemical agents for Group I electrical equipment Excluded
26.12 Earth continuity Excluded
26.13 Surface resistance test of parts of enclosures of non-metallic materials Excluded
26.14 Measurement of capacitance Excluded
26.15 Verification of ratings of ventilating fans Excluded
26.16 Alternative qualification of elastomeric sealing O-rings Excluded
27 Routine tests Applies
28 Manufacturers responsibility Applies
29.1 Applicability Applies
29.2 Location Modified
29.3 General Modified
29.4 Ex marking for explosive gas atmospheres Modified
29.5 Ex marking for explosive dust atmospheres Applies
29.6 Combined types of protection Applies
29.7 Multiple types of protection Excluded
29.8 Ga using two independent Gb types of protection Excluded
29.9 Ex components Excluded
29.10 Small equipment and small Ex components Excluded
29.11 Extremely small equipment and extremely small Ex components Modified
29.12 Warning markings Applies
29.13 Alternate marking of equipment protection levels (EPLs) Excluded
29.14 Cells and batteries Applies
30 Instructions Modified
Annex A Supplementary requirements for Ex cable glands Excluded
Annex B Requirements for Ex components Excluded
Annex C Example of rig for resistance to impact test Excluded
Annex D Introduction to an alternative risk assessment method encompassing Applies
"equipment protection levels" for Ex equipment
Applies: this requirement of IEC 60079-0 is applied without change.
Excluded: this requirement of IEC 60079-0 does not apply.
Modified: this requirement of IEC 60079-0 is modified as detailed in this document.
NOTE The applicable requirements of IEC 60079-0 are identified by the clause title which is normative. This
table was written against the specific requirements of IEC 60079-0, Ed 6.0.

2 Normative references
The following documents are referred to in the text in such a way that some or all of their
content constitutes requirements of this document. For dated references, only the edition

IEC 60079-13:2017 © IEC 2017 – 11 –
cited applies. For undated references, the latest edition of the referenced document (including
any amendments) applies.
IEC 60050-426, International Electrotechnical Vocabulary – Part 426: Equipment for explosive
atmospheres
IEC 60079-0, Explosive atmospheres – Part 0: Equipment – General requirements
IEC 60079-10-1, Explosive atmospheres – Part 10-1: Classification of areas – Explosive gas
atmospheres
IEC 60079-29 (all parts), Explosive atmospheres – Gas detectors
3 Terms and definitions
For the purposes of this document, the terms and definitions given in IEC 60050-426,
IEC 60079-0 and the following apply.
ISO and IEC maintain terminological databases for use in standardization at the following
addresses:
• IEC Electropedia: available at http://www.electropedia.org/
• ISO Online browsing platform: available at http://www.iso.org/obp
NOTE Unless otherwise specified, the terms "voltage" and "current" mean the RMS values of an alternating,
direct or composite voltage or current.
3.1
airlock
means of egress, consisting of two interdependent doors designed to maintain the internal
pressure of the room in order to prevent or significantly reduce the entry of a surrounding
explosive atmosphere
3.2
alarm
piece of apparatus that generates a visual or audible signal that is intended to attract
attention
[SOURCE: IEC 60050-426:2008, 426-09-05]
3.3
clean air
air that is essentially free of combustible dust, and contains no more than trace amounts of
flammable vapour or gas
3.4
dilution
mixing of flammable vapour or gas with air which, over time, will reduce the flammable
concentration
Note 1 to entry: For safety reasons, dilution to a level lower than the lower explosive limit (LEL) can be required if
associated with the potential release there is an additional toxic or asphyxiant risk. Further guidance can be found
in IEC 61285.
[SOURCE: IEC 60079-10-1:2015, 3.5.2, modified – The note to entry has been added.]

– 12 – IEC 60079-13:2017 © IEC 2017
3.5
internal source of release
point or location indoors from which a gas, vapour, mist or liquid may be released into the
atmosphere such that an explosive gas atmosphere could be formed
3.6
limiting value
lowest concentration value of the lower flammable limit (LFL) of each component involved,
taking account of the most onerous conditions of concentration that may occur from every
internal source of release within the room
3.7
lower flammable limit
LFL
volume fraction of flammable gas or vapour in air below which an explosive gas atmosphere
will not form, expressed as a percentage
Note 1 to entry: Although the lower explosive limit (LEL) is often used in place of the lower flammable limit (LFL),
it should be recognized that the LFL is often slightly lower than the LEL.
Note 2 to entry: See IEC 60079-20-1.
[SOURCE: IEC 60079-2:2014, 3.24, modified – In the definition, the parentheses have been
moved to a second note to entry, and the existing note has been replaced by a new note.]
3.8
opening
inlet, outlet, door or non-airtight fixed panel
3.9
pressurization
technique of guarding against the ingress of the external atmosphere into a room by
maintaining clean air therein at a pressure above that of the external atmosphere
3.10
pressurization system
grouping of safety devices and other components used to pressurize and monitor or control a
pressurized room
3.11
restricted access door
door with controlled or limited use or alarmed when open
3.12
safety device
item used to implement or maintain the integrity of the type of protection
3.13
pressurized room
room volume protected by pressurization and of sufficient size to permit the entry of a person
who may occupy the room
3.14
artificially ventilated room
room volume protected by artificial ventilation and of sufficient size to permit the entry of a
person who may occupy the room
Note 1 to entry: The room volume can be an entire room (general) or part of a room (local ventilation).

IEC 60079-13:2017 © IEC 2017 – 13 –
3.15
purging
operation of passing a quantity of clean air through the room and ducts in a pressurized or
artificially ventilated room, so that the concentration of the explosive gas atmosphere is
brought to a safe level
3.16
room volume
volume of the empty room and including
any associated ducting without internal equipment
3.17
pressurization "pb"
pressurized room that provides an equipment protection level Gb or Db
3.18
pressurization "pc"
pressurized room that provides an equipment protection level Gc or Dc
3.19
artificial ventilation "vc"
artificial ventilation of a room with or without an internal source of release, such that the room
provides an equipment protection level Gc
3.20
artificial ventilation
technique of guarding against an explosive atmosphere by the use of mechanical means to
provide for the movement of air
3.21
ventilation system
complete installation required to produce artificial ventilation
4 Requirements for all rooms
4.1 General
Protection by pressurization and protection by artificial ventilation are separately described
but may be combined to protect against hazards where required. Where both techniques are
combined, then requirements for both shall apply. Unless otherwise identified in Clauses 6 or
7, the requirements in 4.2 to 4.10 apply to both protection techniques.
NOTE Annex C provides examples of applications and associated guidelines.
4.2 Type and level of protection
4.2.1 Pressurization "p"
Rooms with pressurization "p" and located in a hazardous area shall be one of the following:
a) Level of protection "pb" (EPL Gb or Db). The pressurized room maintains an internal
overpressure reducing the risk of ingress of an explosive atmosphere and is suitable for
use in an area requiring EPL Gb or Db, permitting unprotected equipment to be installed
within the pressurized room except for pressurization safety devices (see 6.3.1).
b) Level of protection "pc" (EPL Gc or Dc). The pressurized room maintains an internal
overpressure reducing the risk of the ingress of an explosive atmosphere and is suitable
for use in an area requiring EPL Gc or Dc, permitting unprotected equipment to be
installed within the pressurized room except for pressurization safety devices (see 6.3.1).

– 14 – IEC 60079-13:2017 © IEC 2017
4.2.2 Artificial ventilation "v"
The artificial ventilated room maintains artificial ventilation to dilute a release of flammable
substance to reduce a hazardous area inside such that the required EPL is reduced from
either Gb or Gc to non-hazardous or from Gb to Gc.
Rooms with artificial ventilation "v" and located in a hazardous area shall be:
• level of protection "vc" (EPL Gc). The ventilated room maintains artificial ventilation to
dilute a release of flammable substance to reduce a hazardous area such that unprotected
equipment can be installed within the artificially ventilated room, and is suitable for use in
an area requiring EPL Gc.
NOTE This permits equipment with a lower EPL to be installed within the artificially ventilated room except for
ventilation safety devices (see 7.3.1).
Rooms may be protected by either general or local artificial ventilation. General artificial
ventilation applies to an entire room or significant portion of a room and local artificial
ventilation applies to restricted regions, for example an extraction hood.
4.3 Construction
The protected room shall, at a minimum, be designed to allow pressurization or artificial
ventilation to be used in accordance with Clauses 6 or 7.
NOTE The room construction requirements could be affected by the location, occupancy requirements, and
functionality.
For pressurized rooms and rooms protected by artificial ventilation, provision shall be made to
ensure adequate purging of dead air spaces created within the room, for example by avoiding
suspended ceilings, trenches, or raised floors.
4.4 Mechanical strength
The room and any ducts and their connecting parts shall be designed to withstand the
maximum pressure of the pressurization or ventilation system. This shall be verified by the
design documentation or by the overpressure test of 6.4.2. National or regional building
requirements may also apply.
Test for mechanical strength need not be carried out on the completed room but may instead
be applied to all parts such as windows, gland plates, penetrations, doors, inlets or outlets of
the room which are not made of steel or concrete but which are integral to the type of
protection. In this case, the tests may be carried out on the parts themselves, appropriately
mounted for the test.
4.5 Penetrations and seals
The entry of cables, electrical conduits and other penetrations into the room shall be sealed
so that the necessary pressure differential or artificial ventilation integrity is maintained.
Measures shall be taken to minimize the exchange of atmosphere between the inside and the
outside of the room where this may lead to another hazard, for example displacement of
vapours via floor drainage facilities.
Barriers may need to be considered for certain room designs to minimize ingress or egress of
gases or vapours, for example this may include liquid seals such as s-bends in drain piping.
4.6 Personnel access doors
Where protection against ingress of a flammable atmosphere is required, doors for personnel
access shall be automatically self-closing, close fitting, and designed to close and latch
...