Local charging station management systems and local energy management systems network connectivity and information exchange - Part 2: Specific data model mapping

Sistemi za upravljanje lokalnih polnilnih postaj in lokalni sistemi za upravljanje z energijo za povezovanje v omrežje in izmenjavo informacij - 2. del: Mapiranje posebnih podatkovnih modelov

General Information

Status
Not Published
Public Enquiry End Date
30-Jul-2024
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
15-May-2024
Due Date
02-Oct-2024

Buy Standard

Draft
prEN IEC 63380-2:2024 - BARVE
English language
232 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-julij-2024
Sistemi za upravljanje lokalnih polnilnih postaj in lokalni sistemi za upravljanje z
energijo za povezovanje v omrežje in izmenjavo informacij - 2. del: Mapiranje
posebnih podatkovnih modelov
Local charging station management systems and local energy management systems
network connectivity and information exchange - Part 2: Specific data model mapping
Ta slovenski standard je istoveten z: prEN IEC 63380-2:2024
ICS:
29.240.99 Druga oprema v zvezi z Other equipment related to
omrežji za prenos in power transmission and
distribucijo električne energije distribution networks
43.120 Električna cestna vozila Electric road vehicles
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

69/952/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 63380-2 ED1
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2024-05-10 2024-08-02
SUPERSEDES DOCUMENTS:
69/877/CD, 69/949/CC
IEC TC 69 : ELECTRICAL POWER/ENERGY TRANSFER SYSTEMS FOR ELECTRICALLY PROPELLED ROAD VEHICLES AND INDUSTRIAL
TRUCKS
SECRETARIAT: SECRETARY:
Belgium Mr Peter Van den Bossche
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:

Other TC/SCs are requested to indicate their interest, if any,
in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which
they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries”
clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the final stage for
submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

TITLE:

Local Charging station management systems and Local Energy Management Systems network
connectivity and information exchange - Part 2 Specific Data Model Mapping



PROPOSED STABILITY DATE: 2027
NOTE FROM TC/SC OFFICERS:
C opyright © 2024 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

– 2 – IEC CDV 63380-2 © IEC 2024
1 CONTENTS
3 FOREWORD . 13
4 INTRODUCTION . 15
5 1 Scope . 16
6 2 Normative references . 16
7 3 Terms and definitions . 17
8 4 Reader’s Guide . 19
9 4.1 General . 19
10 4.2 Reading the graphics . 20
11 4.2.1 General . 20
12 4.2.2 Hierarchy diagram . 20
13 4.2.3 Sequence diagram . 20
14 4.3 Finding the right information . 21
15 5 Use Case Function (UCF) details. 21
16 5.1 General . 21
17 5.2 Mapping to SPINE . 21
18 5.2.1 Concepts . 21
19 5.2.2 UCF_AC_Measurement . 38
20 5.2.3 UCF_Characteristics . 78
21 5.2.4 UCF_Charging_Power_Limits . 94
22 5.2.5 UCF_Consumption_Curve . 99
23 5.2.6 UCF_Device_Configuration. 112
24 5.2.7 UCF_Device_State . 123
25 5.2.8 UCF_EV_Connected . 128
26 5.2.9 UCF_Heartbeat . 130
27 5.2.10 UCF_Identification . 135
28 5.2.11 UCF_ Incentive_Table . 139
29 5.2.12 UCF_Load_Control . 155
30 5.2.13 UCF_ Manufacturer_Information . 165
31 5.2.14 UCF_Maximum_Power_Limitation_Curve . 170
32 5.2.15 UCF_ Measurement . 180
33 5.2.16 UCF_ Power_Limit . 185
34 5.2.17 UCF_Session_Summary . 193
35 5.2.18 UCF_Setpoint . 204
36 5.3 Mapping to ECHONET Lite . 213
37 5.3.1 Concepts . 213
38 5.3.2 UCF_Device_State . 214
39 5.3.3 UCF_EV_Connected . 218
40 5.3.4 UCF_Load_Control . 219
41 5.3.5 UCF_Measurement . 223
42 5.3.6 UCF_Operation_Mode . 224
43 5.3.7 UCF_ Power_Limit . 228
44 Bibliography . 232
IEC CDV 63380-2 © IEC 2024 – 3 –
47 Figure 1 – Overview of resources within IEC 63380-2 . 19
48 Figure 2 – Actor overview example . 20
49 Figure 3 – Example communication sequence diagram . 21
50 Figure 4 – Actor overview example . 33
51 Figure 5 – Pre-Scenario communication - Detailed discovery sequence diagram . 36
52 Figure 6 – Pre-Scenario communication - Binding sequence diagram . 37
53 Figure 7 – Pre-Scenario communication - Subscription sequence diagram . 37
54 Figure 8 – Messaging sequence for UCF_AC_Measurement . 38
55 Figure 9 – UCF_AC_Measurement: Request Measurement/Measurement
56 communication sequence diagram . 39
57 Figure 10 – UCF_AC_Measurement: Request Electrical Connection Data/Electrical
58 Connection Data communication sequence diagram . 66
59 Figure 11 – Actor "Device " overview . 77
60 Figure 12 – Actor "EMS" overview . 78
61 Figure 13 – Messaging sequence for UCF_Characteristics . 79
62 Figure 14 – UCF_Characteristics: Request Characteristics/Characteristics
63 communication sequence diagram . 79
64 Figure 15 – Actor "Device" overview . 93
65 Figure 16 – Actor "EMS" overview . 94
66 Figure 17 – Messaging sequence for UCF_Charging_Power_Limits . 95
67 Figure 18 – UCF_Charging_Power_Limits: Request Power Limits / Power Limits
68 communication sequence diagram . 95
69 Figure 19 – Actor "Device" overview . 98
70 Figure 20 – Actor "EMS" overview . 99
71 Figure 21 – Messaging sequence for UCF_Consumption_Curve . 100
72 Figure 22 – SPINE Sequence Diagram for Request Consumption Curve and
73 Consumption Curve . 101
74 Figure 23 – Actor "Device" overview . 111
75 Figure 24 – Actor "EMS" overview . 112
76 Figure 25 – Messaging sequence for UCF_Device_Configuration . 112
77 Figure 26 – UCF_Device Configuration: Request Device Configuration/Device
78 Configuration Data communication sequence diagram . 113
79 Figure 27 – UCF_Device Configuration: Notify Device Configuration Data
80 communication sequence diagram . 118
81 Figure 28 – UCF_Device Configuration: Write Device Configuration communication
82 sequence diagram . 120
83 Figure 29 – Actor "Device" overview . 122
84 Figure 30 – Actor "EMS" overview . 123
85 Figure 31 – Messaging sequence for UCF_Device_State . 124
86 Figure 32 – SPINE Sequence Diagram for Device State. 124
87 Figure 33 – Actor "Device" overview . 127
88 Figure 34 – Actor "EMS" overview . 128
89 Figure 35 – Actor "Device" overview . 129
90 Figure 36 – Actor "EMS" overview . 129
91 Figure 37 – Messaging sequence for UCF_Heartbeat . 130
92 Figure 38 – UCF_Heartbeat communication sequence diagram . 130

– 4 – IEC CDV 63380-2 © IEC 2024
93 Figure 39 – Actor "Device" overview . 134
94 Figure 40 – Actor "EMS" overview . 135
95 Figure 41 – Messaging sequence for UCF_Identification . 136
96 Figure 42 – UCF_Identification communication sequence diagram . 136
97 Figure 43 – Actor "Device" overview . 138
98 Figure 44 – Actor "EMS" overview . 139
99 Figure 45 – Messaging sequence for UCF_Incentive_Table . 140
100 Figure 46 – SPINE Sequence Diagram for Read Incentive Table and Incentive Table . 141
101 Figure 47 – SPINE Sequence Diagram for Write Incentive Table .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.