Abstract

This document describes the key actors in the eCall chain of service provision in hybrid circuit switched/packet switched network
environments as:
1) In-Vehicle System (IVS)/vehicle,
2) Mobile Network Operator (MNO),
3) Public Safety Answering Point (PSAP),
and to provide conformance tests for actor groups 1) – 3).
NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants, although they are the recipient of the service.
NOTE 2 Third party eCall systems (TPS-eCall) are not within the scope of this deliverable. This is because the core TPS-eCall
standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider.
NOTE 3 These conformance tests are partly based on the appropriate conformance tests from EN 16454 and CEN/prEN 17240.
This deliverable therefore adapts and revises Conformance Test Protocols (CTP) from EN 16454 and CEN/prEN 17240 for hybrid circuit switched/packet switched network environments.
This document complements EN 16454 and CEN/prEN 17240 and provides a suite of conformance tests for IVS equipment, MNOs and PSAPs, required to ensure and demonstrate compliance with CEN/prEN 17905.
The scope covers conformance testing of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

Status
Not Published
Public Enquiry End Date
16-Dec-2026
Technical Committee
ITC - Information technology
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
28-Oct-2026
Due Date
17-Mar-2027

Buy Documents

Draft

SIST EN 18052:2026/oprA1:2026

English language (29 pages)
Preview
Preview
e-Library read for
×1 day

Relations

Effective Date
11-Mar-2026

Buy Documents

Draft

SIST EN 18052:2026/oprA1:2026

English language (29 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

BSI Group

BSI (British Standards Institution) is the business standards company that helps organizations make excellence a habit.

UKAS United Kingdom Verified

CIS Institut d.o.o.

Personal Protective Equipment (PPE) certification body. Notified Body NB-2890 for EU Regulation 2016/425 PPE.

SA Slovenia Verified

Great Wall Tianjin Quality Assurance Center

Established 1993, first batch to receive national accreditation with IAF recognition.

CNAS China Verified

Sponsored listings

Frequently Asked Questions

SIST EN 18052:2026/oprA1:2026 is a draft published by the Slovenian Institute for Standardization (SIST). Its full title is "Intelligent transport systems - ESafety - ECall end to end conformance testing for eCall HLAP in hybrid circuit switched/packet switched network environments". This standard covers: This document describes the key actors in the eCall chain of service provision in hybrid circuit switched/packet switched network environments as: 1) In-Vehicle System (IVS)/vehicle, 2) Mobile Network Operator (MNO), 3) Public Safety Answering Point (PSAP), and to provide conformance tests for actor groups 1) – 3). NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants, although they are the recipient of the service. NOTE 2 Third party eCall systems (TPS-eCall) are not within the scope of this deliverable. This is because the core TPS-eCall standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider. NOTE 3 These conformance tests are partly based on the appropriate conformance tests from EN 16454 and CEN/prEN 17240. This deliverable therefore adapts and revises Conformance Test Protocols (CTP) from EN 16454 and CEN/prEN 17240 for hybrid circuit switched/packet switched network environments. This document complements EN 16454 and CEN/prEN 17240 and provides a suite of conformance tests for IVS equipment, MNOs and PSAPs, required to ensure and demonstrate compliance with CEN/prEN 17905. The scope covers conformance testing of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

This document describes the key actors in the eCall chain of service provision in hybrid circuit switched/packet switched network environments as: 1) In-Vehicle System (IVS)/vehicle, 2) Mobile Network Operator (MNO), 3) Public Safety Answering Point (PSAP), and to provide conformance tests for actor groups 1) – 3). NOTE 1 Conformance tests are not appropriate nor required for vehicle occupants, although they are the recipient of the service. NOTE 2 Third party eCall systems (TPS-eCall) are not within the scope of this deliverable. This is because the core TPS-eCall standard (EN 16102) does not specify the communications link between the vehicle and the TPS service provider. NOTE 3 These conformance tests are partly based on the appropriate conformance tests from EN 16454 and CEN/prEN 17240. This deliverable therefore adapts and revises Conformance Test Protocols (CTP) from EN 16454 and CEN/prEN 17240 for hybrid circuit switched/packet switched network environments. This document complements EN 16454 and CEN/prEN 17240 and provides a suite of conformance tests for IVS equipment, MNOs and PSAPs, required to ensure and demonstrate compliance with CEN/prEN 17905. The scope covers conformance testing of new engineering developments, products and systems, and does not imply testing associated with individual installations in vehicles or locations.

SIST EN 18052:2026/oprA1:2026 is classified under the following ICS (International Classification for Standards) categories: 03.220.20 - Road transport; 13.200 - Accident and disaster control; 35.240.60 - IT applications in transport. The ICS classification helps identify the subject area and facilitates finding related standards.

SIST EN 18052:2026/oprA1:2026 has the following relationships with other standards: It is inter standard links to SIST EN 18052:2026. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.

SIST EN 18052:2026/oprA1:2026 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


SLOVENSKI STANDARD
01-december-2026
Inteligentni transportni sistemi - e-Varnost - Preskušanje skladnosti e-klica HLAP v
hibridnih omrežnih okoljih s komutiranim vezjem/paketno komutiranim omrežjem -
Dopolnilo A1
Intelligent transport systems - ESafety - ECall end to end conformance testing for eCall
HLAP in hybrid circuit switched/packet switched network environments
Intelligente Verkehrssysteme - eSicherheit - eCall-Ende-zu-Ende Konformitätsprüfungen
für übergeordnete eCall-Anwendungen in hybriden leitungs- / paketvermittelnden
Netzwerkumgebungen - Änderung 1
Systèmes de transport intelligents - eSécurité - Essais de conformité du système eCall
de bout en bout pour les systèmes IMS basés sur la commutation de paquets
Ta slovenski standard je istoveten z: EN 18052:2025/prA1
ICS:
03.220.20 Cestni transport Road transport
13.200 Preprečevanje nesreč in Accident and disaster control
katastrof
35.240.60 Uporabniške rešitve IT v IT applications in transport
prometu
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

DRAFT
EUROPEAN STANDARD
EN 18052:2025
NORME EUROPÉENNE
EUROPÄISCHE NORM
prA1
October 2026
ICS 35.240.60
English Version
Intelligent transport systems - ESafety - ECall end to end
conformance testing for eCall HLAP in hybrid circuit
switched/packet switched network environments
Systèmes de transport intelligents - eSafety - Essais de Intelligente Verkehrssysteme - eSicherheit - eCall-
conformité du système eCall de bout en bout pour le Ende-zu-Ende Konformitätsprüfungen für
HLAP d'eCall dans les environnements réseaux übergeordnete eCall-Anwendungen in hybriden
hybrides à commutation de circuits et de paquets leitungs- / paketvermittelnden Netzwerkumgebungen
- Änderung 1
This draft amendment is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee CEN/TC 278.

This draft amendment A1, if approved, will modify the European Standard EN 18052:2025. If this draft becomes an amendment,
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for inclusion of
this amendment into the relevant national standard without any alteration.

This draft amendment was established by CEN in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC
Management Centre has the same status as the official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway,
Poland, Portugal, Republic of North Macedonia, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Türkiye and
United Kingdom.
Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are
aware and to provide supporting documentation.

Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without
notice and shall not be referred to as a European Standard.

EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION

EUROPÄISCHES KOMITEE FÜR NORMUNG

CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2026 CEN All rights of exploitation in any form and by any means reserved Ref. No. EN 18052:2025/prA1:2026 E
worldwide for CEN national Members.

Contents Page
European foreword . 5
1 Modifications to Clause 2, “Normative references” . 6
2 Modifications to 8.3, “eCall timers” . 6
3 Modifications to 8.4, “CTP Test Applicability” . 6
4 Modification to 9.2.3, “CTP 1.1.2.1 Domain selection skipped and IVS remains registered in
CS domain - IVS” . 7
5 Modifications to 9.2.5, “CTP 1.1.2.3 Domain selection performed and eCall initiated in CS
domain - IVS” . 7
6 Modification to 9.2.7, “CTP 1.1.2.5 Domain selection performed and eCall initiated in PS
domain in different RAT - IVS” . 7
7 Modifications to 9.2.8, “CTP 1.1.6.1 eCall successful in CS domain - IVS” . 7
8 Modifications to 9.2.9, “CTP 1.1.6.2 eCall successful in CS domain in limited service state -
IVS” . 7
9 Modification to 9.2.11, “CTP 1.1.10.1 Domain change and fallback to IMS emergency call in
PS domain after network registration and eCall failed and after unsuccessful re-attempt in
CS domain - IVS” . 8
10 Modifications to 9.2.12, “CTP 1.1.10.2 Domain change and fallback to IMS emergency call in
PS domain after eCall failed and after unsuccessful re-attempt in CS domain - IVS” . 8
11 Modification to 9.2.13, “CTP 1.1.10.3 Fallback to IMS emergency call in PS domain after
missing AL-ACK for initial MSD - IVS” . 9
12 Modifications to 9.2.14, “CTP 1.1.10.4 Domain change and fallback to IMS emergency call in
PS domain after eCall is dropped before the MSD is acknowledged and after unsuccessful
re-attempt in CS domain - IVS” . 9
13 Modifications to 9.2.15, “CTP 1.1.10.5 Fallback to emergency call in CS domain - IVS” . 10
14 Modifications to 9.2.16, “CTP 1.1.10.6 Domain change to PS domain after network
registration and eCall failed in CS domain - IVS” . 10
15 Modifications to 9.2.17, “CTP 1.1.10.7 Domain change to PS domain after eCall failed in CS
domain - IVS” . 11
16 Modifications to 9.2.18, “CTP 1.1.10.8 Domain change to CS domain after eCall failed in PS
domain - IVS” . 12
17 Modifications to 9.2.19, “CTP 1.1.10.9 Domain change to CS domain after eCall failed and
after unsuccessful re-attempt in PS domain - IVS” . 13
18 Modifications to 9.2.20, “CTP 1.1.10.10 Domain change and fallback to eCall (emergency
call) in CS domain after eCall failed in PS domain - IVS” . 14
19 Modifications to 9.2.21, “CTP 1.1.10.11 Domain change and fallback to eCall (emergency
call) in CS domain after eCall failed and after unsuccessful re-attempt in PS domain - IVS”
............................................................................................................................................................................. 14
20 Modification to 9.2.22, “CTP 1.1.10.12 Domain change to PS domain after eCall is dropped
before the MSD is acknowledged and after unsuccessful re-attempt in CS domain - IVS” . 15
21 Modifications to 9.2.23, “CTP 1.1.10.13 Domain change to PS domain and MSD transfer
using in-band modem after eCall is dropped before the MSD is acknowledged and after
unsuccessful re-attempt in CS domain - IVS” . 15
22 Modifications to 9.2.24, “CTP 1.1.10.14 Domain change to CS domain after eCall is rejected
and MSD acknowledged in PS domain - IVS” . 16
23 Modifications to 9.2.25, “CTP 1.1.10.15 No Call reattempt or domain change to CS domain
after eCall is rejected and MSD acknowledged in PS domain - IVS” . 17
24 Modifications to 9.2.26, “CTP 1.1.10.16 Domain change to CS domain after eCall is rejected
and negative AL-ACK and unsuccessful re-attempt in PS domain - IVS” . 17
25 Modifications to 9.2.27, “CTP 1.1.10.17 Domain change to CS domain after eCall is rejected
and negative AL-ACK in PS domain - IVS” . 17
26 Modifications to 9.2.28, “CTP 1.1.10.18 Domain change to CS domain after eCall is rejected
and missing AL-ACK and unsuccessful re-attempt in PS domain - IVS” . 18
27 Modifications to 9.2.29, “CTP 1.1.10.19 Domain change to CS domain after eCall is rejected
and missing AL-ACK in PS domain - IVS” . 18
28 Modifications to 9.2.30, “CTP 1.1.10.20 Domain change to CS domain after eCall is not
answered and unsuccessful re-attempt in PS domain - IVS” . 19
29 Modifications to 9.2.31, “CTP 1.1.10.21 Domain change to CS domain after eCall is not
answered in PS domain - IVS” . 19
30 Modifications to 9.2.32, “CTP 1.1.10.22 Domain change to CS domain after eCall is dropped
before the MSD is acknowledged and after unsuccessful re-attempt in PS domain - IVS” . 20
31 Modifications to 9.2.33, “CTP 1.1.10.23 Domain change to CS domain after eCall is dropped
before the MSD is acknowledged in PS domain - IVS” . 20
32 Modifications to 9.2.34, “CTP 1.1.15.1 New/updated MSD after in-call domain handover -
IVS” . 21
33 Modifications to 9.2.36, “CTP 1.1.17.2 Call-back allowed after domain change to PS domain
- IVS” . 21
34 Modifications to 9.2.37, “CTP 1.1.17.3 Remain registered for ≥ 1 hr after in-call domain
handover - IVS” . 22
35 Modifications to 9.2.38, “CTP 1.1.17.4 Remain registered for ≥ 1 hr after domain change to
CS domain - IVS” . 22
36 Modifications to 9.2.39, “CTP 1.1.17.5 Remain registered for ≥ 1 hr after domain change to
PS domain - IVS” . 23
37 Modifications to 9.2.40, “CTP 1.1.18.1 MSD transfer using in-band modem in PS domain
after negative AL-ACK for initial MSD - IVS” . 25
38 Modifications to 9.2.40, “CTP 1.1.18.2 MSD transfer using in-band modem in PS domain
after missing AL-ACK for initial MSD - IVS” . 26
39 Modification to 9.3.3, “CTP 1.2.10.1 Domain change to CS domain after eCall is rejected and
MSD acknowledged in limited service state in PS domain - eCall-only IVS” . 26
40 Modifications to 9.3.4, “CTP 1.2.10.2 Domain change to CS domain after network
registration and eCall failed in PS domain - eCall-only IVS”. 26
41 Modifications to 9.3.5, “CTP 1.2.10.3 Domain change to CS domain after network
registration and eCall failed and after unsuccessful re-attempt in PS domain - eCall-only
IVS” . 27
42 Modifications to 9.3.6, “CTP 1.2.17.1 Remain registered for ≥ 1 hr ≤ 12 hr after in-call
domain handover - eCall-only IVS” . 27
43 Modifications to 11.2.4, “CTP 3.1.10.3 Logging of MSD transfer type (in-band modem) of
eCall in PS domain - PSAP” . 28
44 Modifications to 11.2.8, “CTP 3.1.15.3 Call-back to vehicle after domain change to PS
domain - PSAP” . 28
45 Modifications to 11.2.9, “CTP 3.1.16.1 Request new MSD failed after call clear-down and
domain change to CS domain - PSAP” . 28
46 Modifications to 11.2.10, “CTP 3.1.16.2 Request new MSD failed after call clear-down and
domain change to PS domain - PSAP” . 28
47 Modifications to 11.2.11, “CTP 3.1.16. Request new MSD after call clear-down and domain
change to CS domain - PSAP” . 29
48 Modification to multiple affected clauses (e.g. 9.2.3, 9.2.4, 9.2.5, etc.) . 29
European foreword
This document (EN 18052:2025/prA1:2026) has been prepared by Technical Committee CEN/TC 278
“Intelligent transport systems”, the secretariat of which is held by NEN.
This document is currently submitted to the CEN Enquiry.
1 Modifications to Clause 2, “Normative references”
Replace:
EN 17184:2024 (…)
with:
EN 17184:2024+A1:2026 (…)
Replace:
ETSI TS 124 229 (Release “16”), Digital (…) Stage 3 (3GPP TS 24.229 Release “16”)
with:
ETSI TS 124 229 (Release “14 or later for eCall over 4G; Release 16 or later for eCall over 5G”), Digital (…)
Stage 3 (3GPP TS 24.229 Release “14 or later for eCall over 4G; Release 16 or later for eCall over 5G”)

Replace:
“ETSI TS 123 167 (Release “16”), Universal (…) sessions (3GPP TS 23.167 Release “16”)
with:
“ETSI TS 123 167 (Release “14 or later for eCall over 4G; Release 16 or later for eCall over 5G”), Universal
(…) sessions (3GPP TS 23.167 Release “14 or later for eCall over 4G; Release 16 or later for eCall over
5G”)
2 Modifications to 8.3, “eCall timers”
Replace (5x):
EN 17184:2024 (…)
with:
EN 17184:2024+A1:2026 (…)
3 Modifications to 8.4, “CTP Test Applicability”
Delete:
“To allow for possible future change in ETSI specifications (e.g. Release 19), any ETSI specification
included as part of test applicability shall refer to the latest Release 16 version of the specification. If the
definition of a capability changes in a later version (e.g. Release 19) of the ETSI specification such that an
IVS that supports the later version (e.g. Release 19) of the ETSI specification does not support the
capability as defined in Release 16, then the capability shall be considered to be not supported.”.

Replace the current NOTE:
NOTE “The Technical Committee” CEN/TC 278/WG 15 (…) the “current” requirements in ETSI specifications
“(Release 16 and later)” and asked ETSI and 3GPP for alignment. Those alignments “are currently planned” in
ETSI/3GPP Release 19.
with the following:
NOTE CEN/TC 278/WG 15 (…) the requirements in ETSI specifications “in Release 14 to Release 18” and asked
ETSI and 3GPP for alignment. Those alignments “have been completed” in ETSI/3GPP Release 19.
4 Modification to 9.2.3, “CTP 1.1.2.1 Domain selection skipped and IVS remains
registered in CS domain - IVS”
th
In Table 7, 14 row, under column ‘Tester action’, delete:
“ or manual”.
5 Modifications to 9.2.5, “CTP 1.1.2.3 Domain selection performed and eCall
initiated in CS domain - IVS”
th
In Table 9, 14 row, under column ‘Tester action’, delete:
“ or manual”.
th
In Table 9, 15 row, under column ‘Tester action’, replace:
IVS shall perform domain selection and “shall register” on the circuit switched network
with:
IVS shall perform domain selection and “the IVS may have completed or skipped the network
registration” on the circuit switched network

th
In Table 9, 15 row, under column ‘Pass condition’, delete:
“Domain selection was performed and IVS registered on the circuit switched network”.
6 Modification to 9.2.7, “CTP 1.1.2.5 Domain selection performed and eCall
initiated in PS domain in different RAT - IVS”
th
In Table 11, 14 row, under column ‘Tester action’, delete:
“ or manual”.
7 Modifications to 9.2.8, “CTP 1.1.6.1 eCall successful in CS domain - IVS”
th
In Table 12, 11 row, under column ‘Tester action’, replace:
“Check that the IVS completed” the network registration on the circuit switched network
with:
“IVS may have completed or skipped” the network registration on the circuit switched network

th
In Table 12, 11 row, under column ‘Pass condition’, delete:
“IVS registration was completed on the circuit switched network”.
8 Modifications to 9.2.9, “CTP 1.1.6.2 eCall successful in CS domain in limited
service state - IVS”
th
In Table 13, 12 row, under column ‘Tester action’, replace:
“Check that the IVS completed” the network registration on the circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on the circuit switched network

th
In Table 13, 12 row, under column ‘Pass condition’, delete:
“Recognise network registration attempt on circuit switched network”.

th
In Table 13, 13 row, under column ‘Tester action’, add:
“, if attempted by the IVS”.
9 Modification to 9.2.11, “CTP 1.1.10.1 Domain change and fallback to IMS
emergency call in PS domain after network registration and eCall failed and after
unsuccessful re-attempt in CS domain - IVS”
th nd
In Table 15, 8 row, 2 column, replace (2x):
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…

th
In Table 15, 18 row, replace (2x):
...after eCall was “dropped”
with:
...after eCall was “rejected”.
10 Modifications to 9.2.12, “CTP 1.1.10.2 Domain change and fallback to IMS
emergency call in PS domain after eCall failed and after unsuccessful re-attempt
in CS domain - IVS”
th nd
In Table 16, 8 row, 2 column, replace (2x):
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…

th
In Table 16, 12 row, under column ‘Tester action’, replace:
“Check that the IVS completed” the network registration on the circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on the circuit switched network

th
row, under column ‘Pass condition’, delete:
In Table 16, 12
“IVS registration was completed on the circuit switched network”.

th
In Table 16, 16 row, replace (2x):
...after eCall was “dropped”
with:
...after eCall was “rejected”.
11 Modification to 9.2.13, “CTP 1.1.10.3 Fallback to IMS emergency call in PS
domain after missing AL-ACK for initial MSD - IVS”
th nd
In Table 17, 8 row, 2 column, replace:
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…
12 Modifications to 9.2.14, “CTP 1.1.10.4 Domain change and fallback to IMS
emergency call in PS domain after eCall is dropped before the MSD is
acknowledged and after unsuccessful re-attempt in CS domain - IVS”
th nd
In Table 18, 8 row, 2 column, delete:
…“the IVS supports the parts of Annex H.6 in ETSI TS 123 167 (Release 16), where the IVS performs
domain selection following an eCall failure in a CS network or”…

th nd
In Table 18, 8 row, 2 column, replace:
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…

th
In Table 18, 12 row, under column ‘Tester action’, replace:
“Check that the IVS completed” the network registration on the circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on the circuit switched network

th
In Table 18, 12 row, under column ‘Pass condition’, delete:
“IVS registration was completed on the circuit switched network”.

th
In Table 18, 16 row, under column ‘Tester action’, replace:
...and reject the redial attempt(s)...
with:
...and “configure the PSAP test point to” reject the redial attempt(s)...

th
In Table 18, 17 row, replace (2x):
...after eCall was “dropped”
with:
...after eCall was “terminated abnormally”.
13 Modifications to 9.2.15, “CTP 1.1.10.5 Fallback to emergency call in CS domain
- IVS”
th
In Table 19, 12 row, under column ‘Tester action’, replace:
“Check that the IVS completed” the network registration on the circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on the circuit switched network

th
In Table 19, 12 row, under column ‘Pass condition’, delete:
“IVS registration was completed on the circuit switched network”.
14 Modifications to 9.2.16, “CTP 1.1.10.6 Domain change to PS domain after
network registration and eCall failed in CS domain - IVS”
th nd
In Table 20, 6 row, 2 column, replace:
EN 17184:2024 (…)
with:
EN 17184:2024+A1:2026 (…)
th nd
row, 2 column, replace (2x):
In Table 20, 6
…(Release “16”)…
with:
…(Release “14 to Release 19”)…

th nd
In Table 20, 8 row, 2 column, replace (2x):
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…

th
row, under column ‘Tester action’, replace:
In Table 20, 13
“Check that the IVS attempts” the network registration on circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on “the” circuit switched network

th
In Table 20, 13 row, under column ‘Pass condition’, delete:
“Recognise network registration attempt on circuit switched network”.

th
In Table 20, 14 row, under column ‘Tester action’, add:
“, if attempted by the IVS”.
15 Modifications to 9.2.17, “CTP 1.1.10.7 Domain change to PS domain after eCall
failed in CS domain - IVS”
th nd
In Table 21, 6 row, 2 column, replace:
EN 17184:2024 (…)
with:
EN 17184:2024+A1:2026 (…)
th nd
In Table 21, 6 row, 2 column, replace (2x):
…(Release “16”)…
with:
…(Release “14 to Release 19”)…

th nd
In Table 21, 8 row, 2 column, replace (2x):
…(Release “16”)…
with:
…(“in” Release “14 to Release 19”)…

th
In Table 21, 12 row, under column ‘Tester action’, replace:
“Check that the IVS attempts” the network registration on circuit switched network
with:
“The IVS may have attempted or skipped” the network registration on “the” circuit switched network

th
In Table 21, 12 row, under column ‘Pass condition’, delete:
“IVS registration was completed on the circuit switched network”.
16 Modifications to 9.2.18, “CTP 1.1.10.8 Domain change to CS domain after eCall
failed in PS domain - IVS”
Replace Table 22 with the following:
“
SUT reference ‘In-Vehicle System’
CTP/IVS/ECI/1.1.10.8 Verify that the IVS attempts eCall in CS doma
...