Batch control - Part 1: Models and terminology

Chargenorientierte Fahrweise - Teil 1: Modelle und Terminologie

Contrôle-commande des processus de fabrication par lots - Partie 1: Modèles et terminologie

Nadzor šarže - 1. del: Modeli in terminologija

General Information

Status
Not Published
Public Enquiry End Date
25-Apr-2024
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
13-Feb-2024
Due Date
02-Jul-2024

Relations

Buy Standard

Draft
prEN IEC 61512-1:2024 - BARVE
English language
144 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
oSIST prEN IEC 61512-1:2024
01-april-2024
Nadzor šarže - 1. del: Modeli in terminologija
Batch control - Part 1: Models and terminology
Chargenorientierte Fahrweise - Teil 1: Modelle und Terminologie
Contrôle-commande des processus de fabrication par lots - Partie 1: Modèles et
terminologie
Ta slovenski standard je istoveten z: prEN IEC 61512-1:2024
ICS:
01.040.25 Izdelavna tehnika (Slovarji) Manufacturing engineering
(Vocabularies)
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.240.50 Uporabniške rešitve IT v IT applications in industry
industriji
oSIST prEN IEC 61512-1:2024 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN IEC 61512-1:2024

---------------------- Page: 2 ----------------------
oSIST prEN IEC 61512-1:2024
65A/1108/CDV

COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61512-1 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2024-02-09 2024-05-03
SUPERSEDES DOCUMENTS:
65A/1045/CD, 65A/1066B/CC

IEC SC 65A : SYSTEM ASPECTS
SECRETARIAT: SECRETARY:
United Kingdom Ms Stephanie Lavy
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:


Other TC/SCs are requested to indicate their interest, if
any, in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.

This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some
Countries” clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is
the final stage for submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

TITLE:
Batch control - Part 1: Models and terminology

PROPOSED STABILITY DATE: 2025

Copyright © 2023 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

---------------------- Page: 3 ----------------------
oSIST prEN IEC 61512-1:2024
– 2 – 61512-1  IEC:2022

NOTE FROM TC/SC OFFICERS:

1

---------------------- Page: 4 ----------------------
oSIST prEN IEC 61512-1:2024
61512-1  IEC:2022 – 3 –

2
3
4
5
6
7
8 IEC 61512-1 Ed 2.0
9
10 Batch Control –
11
12 Part 1:
13 Models and Terminology
14
nd
15 2 October 2023
16
17

---------------------- Page: 5 ----------------------
oSIST prEN IEC 61512-1:2024
– 4 – 61512-1  IEC:2022

18 CONTENTS
19 FOREWORD . 8
20 INTRODUCTION . 11
21 1 Scope . 14
22 2 Normative references . 14
23 3 Terms, definitions and abbreviations . 15
24 3.1 Terms and definitions. 15
25 3.2 Abbreviations . 23
26 4 Batch processes and equipment . 24
27 4.1 General . 24
28 4.2 Types of manufacturing . 24
29 4.3 Process model . 25
30 4.4 Equipment and equipment control .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.