Road vehicles - Standardized access to automotive repair and maintenance information (RMI) - Part 4: Conformance test (ISO 18541-4:2015)

ISO 18541-4:2015 specifies a conformance test for a vehicle manufacturer assessment of self-conformance of the VM RMI system. The conformance test cases follow the use case definition of ISO 18541‑1 and the requirements stated in ISO 18541‑2 and ISO 18541‑3.
The primary but not exclusive purpose of this part of ISO 18541 is to provide information to the VM RMI system provider to build and test the VM RMI system against the conformance test cases. This final step in the development process of the VM RMI system is an enabler for all providers that their VM RMI system meets a high degree of functional requirements expected by the end user.

Straßenfahrzeuge - Standardisierter Zugang zur Reparatur und Wartung (RMI) - Teil 4: Konformitätsprüfungen (ISO 18541-4:2015)

Dieser Teil der Norm legt Konformitätsprüfungen zur Selbstprüfung des Systems des Fahrzeugherstellers für Reparatur- und Wartungsinformationen (VM-RMI-System) durch den Fahrzeughersteller fest. Die Konformitätsprüfungsfälle folgen der Festlegung der Anwendungsfälle in ISO 18541 1 sowie den Anforderungen in ISO 18541 2 und ISO 18541 3.
Das hauptsächliche, jedoch nicht ausschließliche Ziel dieses Teils der Norm ist die Bereitstellung von Informationen für den Anbieter des VM-RMI-Systems, um das VM-RMI-System anhand der Konformitätsprüfungsfälle aufzubauen und zu überprüfen. Dieser abschließende Schritt im Entwicklungsprozess des VM-RMI-Systems ermöglicht allen Anbietern von VM-RMI-Systemen, einen hohen Grad an funktionalen Anforderungen der Endnutzer zu erfüllen.

Véhicules routiers - Normalisation de l'accès aux informations relatives à la réparation et à la maintenance pour l'automobile (RMI) - Partie 4: Tests de conformité (ISO 18541-4:2015)

L'ISO 18541-4:2015 spécifie un test de conformité permettant à un constructeur de véhicules de procéder à un autotest de conformité de son système RMI. Les cas de test de conformité suivront la définition des cas d'utilisation de l'ISO 18541‑1 et respecteront les exigences spécifiées dans l'ISO 18541‑2 et l'ISO 18541‑3.
L'objectif principal de l'ISO 18541-4:2015, mais non exclusif, de fournir des informations au fournisseur du système RMI du constructeur de véhicules lui permettant de construire et de soumettre à essai le système RMI avec les cas de test de conformité. Cette étape finale du processus de développement du système RMI du constructeur de véhicules est un outil permettant à tous les fournisseurs de s'assurer que leur système RMI de CV répond au niveau élevé d'exigences fonctionnelles attendu par l'utilisateur final.

Cestna vozila - Standardizirani dostop do informacij o popravilih in vzdrževanju avtomobilov (RMI) - 4. del: Preskus skladnosti (ISO 18541-4:2015)

Ta del standarda CEN določa primere »preskusov skladnosti« za samopreskus skladnosti s strani proizvajalca sistema informacij o popravilih in vzdrževanju (RMI). Primeri preskusov skladnosti bodo upoštevali opredelitev primera v 1. delu standarda in zahteve, navedene v 2. in 3. delu standarda. Izključni namen tega dela standarda CEN je proizvajalcem sistemov informacij o popravilih in vzdrževanju zagotoviti zadostne informacije, da lahko zgradijo ta sistem in ga preskusijo v skladu s primeri preskusov skladnosti. Ta končni korak v razvojnem procesu sistema informacij o popravilih in vzdrževanju vsem proizvajalcem omogoča, da njihov sistem informacij o popravilih in vzdrževanju doseže visoko stopnjo funkcionalnih zahtev, ki jo pričakuje končni uporabnik. Delo so opravile delovne skupine ISO in druge skupine v vmesnikih CEN/TC 301TC in WG1.

General Information

Status
Withdrawn
Publication Date
17-Nov-2015
Current Stage
9960 - Withdrawal effective - Withdrawal
Completion Date
30-Jun-2021

RELATIONS

Buy Standard

Standard
EN ISO 18541-4:2016
English language
91 pages
sale 10% off
Preview
sale 10% off
Preview

e-Library read for
1 day

Standards Content (sample)

SLOVENSKI STANDARD
SIST EN ISO 18541-4:2016
01-marec-2016
Cestna vozila - Standardizirani dostop do informacij o popravilih in vzdrževanju
avtomobilov (RMI) - 4. del: Preskus skladnosti (ISO 18541-4:2015)

Road vehicles - Standardized access to automotive repair and maintenance information

(RMI) - Part 4: Conformance test (ISO 18541-4:2015)

Straßenfahrzeuge - Standardisierter Zugang zur Reparatur und Wartungsinformationen

(RMI) - Teil 4: Konformitätsprüfungen (ISO 18541-4:2015)

Véhicules routiers - Normalisation de l'accès aux informations relatives à la réparation et

à la maintenance pour l'automobile (RMI) - Partie 4: Tests de conformité (ISO 18541-

4:2015)
Ta slovenski standard je istoveten z: EN ISO 18541-4:2015
ICS:
43.040.15 $YWRPRELOVNDLQIRUPDWLND Car informatics. On board
9JUDMHQLUDþXQDOQLãNLVLVWHPL computer systems
43.180 'LDJQRVWLþQDYGUåHYDOQDLQ Diagnostic, maintenance and
SUHVNXVQDRSUHPD test equipment
SIST EN ISO 18541-4:2016 en

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST EN ISO 18541-4:2016
---------------------- Page: 2 ----------------------
SIST EN ISO 18541-4:2016
EN ISO 18541-4
EUROPEAN STANDARD
NORME EUROPÉENNE
November 2015
EUROPÄISCHE NORM
ICS 43.040.15; 43.180
English Version
Road vehicles - Standardized access to automotive repair
and maintenance information (RMI) - Part 4: Conformance
test (ISO 18541-4:2015)

Véhicules routiers - Normalisation de l'accès aux Straßenfahrzeuge - Standardisierter Zugang zur

informations relatives à la réparation et à la Reparatur und Wartungsinformationen (RMI) - Teil 4:

maintenance pour l'automobile (RMI) - Partie 4: Tests Konformitätsprüfungen (ISO 18541-4:2015)

de conformité (ISO 18541-4:2015)
This European Standard was approved by CEN on 12 September 2015.

CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this

European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references

concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN

member.

This European Standard exists in three official versions (English, French, German). A version in any other language made by

translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management

Centre has the same status as the official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,

Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania,

Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and

United Kingdom.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG
CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels

© 2015 CEN All rights of exploitation in any form and by any means reserved Ref. No. EN ISO 18541-4:2015 E

worldwide for CEN national Members.
---------------------- Page: 3 ----------------------
SIST EN ISO 18541-4:2016
EN ISO 18541-4:2015 (E)
Contents Page

European foreword ....................................................................................................................................................... 3

---------------------- Page: 4 ----------------------
SIST EN ISO 18541-4:2016
EN ISO 18541-4:2015 (E)
European foreword

This document (EN ISO 18541-4:2015) has been prepared by Technical Committee ISO/TC 22 “Road

vehicles” in collaboration with Technical Committee CEN/TC 301 “Road vehicles” the secretariat of

which is held by AFNOR.

This European Standard shall be given the status of a national standard, either by publication of an

identical text or by endorsement, at the latest by May 2016, and conflicting national standards shall be

withdrawn at the latest by May 2016.

Attention is drawn to the possibility that some of the elements of this document may be the subject of

patent rights. CEN [and/or CENELEC] shall not be held responsible for identifying any or all such patent

rights.

This document has been prepared under a mandate given to CEN by the European Commission and the

European Free Trade Association.

According to the CEN-CENELEC Internal Regulations, the national standards organizations of the

following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria,

Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia,

France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta,

Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland,

Turkey and the United Kingdom.
Endorsement notice

The text of ISO 18541-4:2015 has been approved by CEN as EN ISO 18541-4:2015 without any

modification.
---------------------- Page: 5 ----------------------
SIST EN ISO 18541-4:2016
---------------------- Page: 6 ----------------------
SIST EN ISO 18541-4:2016
INTERNATIONAL ISO
STANDARD 18541-4
First edition
2015-11-01
Road vehicles — Standardized access
to automotive repair and maintenance
information (RMI) —
Part 4:
Conformance test
Véhicules routiers — Normalisation de l’accès aux informations
relatives à la réparation et à la maintenance pour l’automobile
(RMI) —
Partie 4: Tests de conformité
Reference number
ISO 18541-4:2015(E)
ISO 2015
---------------------- Page: 7 ----------------------
SIST EN ISO 18541-4:2016
ISO 18541-4:2015(E)
COPYRIGHT PROTECTED DOCUMENT
© ISO 2015, Published in Switzerland

All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form

or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior

written permission. Permission can be requested from either ISO at the address below or ISO’s member body in the country of

the requester.
ISO copyright office
Ch. de Blandonnet 8 • CP 401
CH-1214 Vernier, Geneva, Switzerland
Tel. +41 22 749 01 11
Fax +41 22 749 09 47
copyright@iso.org
www.iso.org
ii © ISO 2015 – All rights reserved
---------------------- Page: 8 ----------------------
SIST EN ISO 18541-4:2016
ISO 18541-4:2015(E)
Contents Page

Foreword ....................................................................................................................................................................................................................................xiii

Introduction .............................................................................................................................................................................................................................xiv

1 Scope ................................................................................................................................................................................................................................. 1

2 Normative references ...................................................................................................................................................................................... 1

3 Terms, definitions and abbreviated terms ................................................................................................................................ 1

3.1 Terms and definitions ....................................................................................................................................................................... 1

3.2 Abbreviated terms ............................................................................................................................................................................... 2

4 Conformance test basic principles and clustering ............................................................................................................ 2

4.1 Basic principles for conformance test case definition .......................................................................................... 2

4.2 Conformance test clustering ....................................................................................................................................................... 3

4.2.1 General...................................................................................................................................................................................... 3

4.2.2 Main conformance test case clusters.............................................................................................................. 3

5 Test case structure .............................................................................................................................................................................................. 7

5.1 Conformance test case — General structure ......... ........................................................................................................ 7

5.1.1 Overview ................................................................................................................................................................................. 7

5.1.2 Test case reference number and title [RMI-CT_...] [title] ............................................................... 8

5.1.3 Test purpose ........................................................................................................................................................................ 8

5.1.4 Configuration ...................................................................................................................................................................... 8

5.1.5 Preamble (setup state) ............................................................................................................................................... 8

5.1.6 Test execution ..................................................................................................................................................................... 8

5.1.7 Postamble............................................................................................................................................................................... 8

5.2 Result criteria ........................................................................................................................................................................................... 8

6 CT cluster 1 — Test technical infrastructure........................................................................................................................... 9

6.1 [RMI-CT_TREQ-13, 14, 15, 16, 18, Annex A] Test client configuration ................................................... 9

6.1.1 Overview ................................................................................................................................................................................. 9

6.1.2 Test purpose ........................................................................................................................................................................ 9

6.1.3 Configuration ...................................................................................................................................................................... 9

6.1.4 Preamble (setup state) ............................................................................................................................................... 9

6.1.5 Test execution ..................................................................................................................................................................... 9

6.1.6 Postamble............................................................................................................................................................................10

6.2 [RMI-CT_TREQ-17] Test presentation formats for information packages .......................................10

6.2.1 Overview ..............................................................................................................................................................................10

6.2.2 Test purpose .....................................................................................................................................................................10

6.2.3 Configuration ...................................................................................................................................................................10

6.2.4 Preamble (setup state) ............................................................................................................................................10

6.2.5 Test execution ..................................................................................................................................................................10

6.2.6 Postamble............................................................................................................................................................................10

7 CT cluster 2 — Test client’s external interfaces ................................................................................................................10

7.1 [RMI-CT_TREQ-9] Test vehicle communication interface (VCI) ................................................................10

7.1.1 Overview ..............................................................................................................................................................................10

7.1.2 Test purpose .....................................................................................................................................................................10

7.1.3 Configuration ...................................................................................................................................................................11

7.1.4 Preamble (setup state) ............................................................................................................................................11

7.1.5 Test execution ..................................................................................................................................................................11

7.1.6 Postamble............................................................................................................................................................................11

7.2 [RMI-CT_TREQ-11] Test parts ordering for security-related features.................................................11

7.2.1 Overview ..............................................................................................................................................................................11

7.2.2 Test purpose .....................................................................................................................................................................11

7.2.3 Configuration ...................................................................................................................................................................12

7.2.4 Preamble (setup state) ............................................................................................................................................12

7.2.5 Test execution ..................................................................................................................................................................12

7.2.6 Postamble............................................................................................................................................................................12

© ISO 2015 – All rights reserved iii
---------------------- Page: 9 ----------------------
SIST EN ISO 18541-4:2016
ISO 18541-4:2015(E)

7.3 [RMI-CT_TREQ-12] Test partnered accessory provider systems .............................................................12

7.3.1 Overview ..............................................................................................................................................................................12

7.3.2 Test purpose .....................................................................................................................................................................12

7.3.3 Configuration ...................................................................................................................................................................12

7.3.4 Preamble (setup state) ............................................................................................................................................13

7.3.5 Test execution ..................................................................................................................................................................13

7.3.6 Postamble............................................................................................................................................................................13

8 CT cluster 3 — Test user authentication, authorization and administration ....................................13

8.1 [RMI-CT_UC1.1] Test to register IO for use of the VM RMI system .........................................................13

8.1.1 Overview ..............................................................................................................................................................................13

8.1.2 Test purpose .....................................................................................................................................................................13

8.1.3 Configuration ...................................................................................................................................................................13

8.1.4 Preamble (setup state) ............................................................................................................................................13

8.1.5 Test execution ..................................................................................................................................................................14

8.1.6 Postamble............................................................................................................................................................................14

8.2 [RMI-CT_UC1.2_A] Test to register IO employee for use of the VM RMI system —

Scenario A .................................................................................................................................................................................................14

8.2.1 Overview ..............................................................................................................................................................................14

8.2.2 Test purpose .....................................................................................................................................................................14

8.2.3 Configuration ...................................................................................................................................................................14

8.2.4 Preamble (setup state) ............................................................................................................................................15

8.2.5 Test execution ..................................................................................................................................................................15

8.3 [RMI-CT_UC1.2_B] Test to register IO employee for use of the VM RMI system —

Scenario B .................................................................................................................................................................................................15

8.3.1 Overview ..............................................................................................................................................................................15

8.3.2 Test purpose .....................................................................................................................................................................15

8.3.3 Configuration ...................................................................................................................................................................15

8.3.4 Preamble (setup state) ............................................................................................................................................15

8.3.5 Test execution ..................................................................................................................................................................16

8.3.6 Postamble............................................................................................................................................................................16

8.4 [RMI-CT_UC1.3] Test to maintain IO status .................................................................................................................16

8.4.1 Overview ..............................................................................................................................................................................16

8.4.2 Test purpose .....................................................................................................................................................................16

8.4.3 Configuration ...................................................................................................................................................................16

8.4.4 Preamble (setup state) ............................................................................................................................................16

8.4.5 Test execution ..................................................................................................................................................................17

8.4.6 Postamble............................................................................................................................................................................17

8.5 [RMI-CT_UC1.4] Test to maintain user status ...........................................................................................................17

8.5.1 Overview ..............................................................................................................................................................................17

8.5.2 Test purpose .....................................................................................................................................................................17

8.5.3 Configuration ...................................................................................................................................................................17

8.5.4 Preamble (setup state) ............................................................................................................................................17

8.5.5 Test execution ..................................................................................................................................................................17

8.5.6 Postamble............................................................................................................................................................................18

8.6 [RMI-CT_UC1.5] Test to de-register an IO employee ...........................................................................................18

8.6.1 Overview ..............................................................................................................................................................................18

8.6.2 Test purpose .....................................................................................................................................................................18

8.6.3 Configuration ...................................................................................................................................................................18

8.6.4 Preamble (setup state) ............................................................................................................................................18

8.6.5 Test execution ..................................................................................................................................................................18

8.6.6 Postamble............................................................................................................................................................................19

8.7 [RMI-CT_UC1.6] Test login to VM RMI system ..........................................................................................................19

8.7.1 Overview ..............................................................................................................................................................................19

8.7.2 Test purpose .....................................................................................................................................................................19

8.7.3 Configuration ...................................................................................................................................................................19

8.7.4 Preamble (setup state) ............................................................................................................................................19

8.7.5 Test execution ..................................................................................................................................................................19

8.7.6 Postamble............................................................................................................................................................................20

iv © ISO 2015 – All rights reserved
---------------------- Page: 10 ----------------------
SIST EN ISO 18541-4:2016
ISO 18541-4:2015(E)

8.8 [RMI-CT_UC1.7] Test for granting access to security-related RMI ..........................................................20

8.8.1 Overview ..............................................................................................................................................................................20

8.8.2 Test purpose .....................................................................................................................................................................20

8.8.3 Configuration ...................................................................................................................................................................20

8.8.4 Preamble (setup state) ............................................................................................................................................20

8.8.5 Test execution ..................................................................................................................................................................20

8.8.6 Postamble............................................................................................................................................................................21

9 CT cluster 4 — Test functional user interface implementation ........................................................................21

9.1 [RMI-CT_FREQ-1] Test for RMI access mode .............................................................................................................21

9.1.1 Overview ..............................................................................................................................................................................21

9.1.2 Test purpose .....................................................................................................................................................................21

9.1.3 Configuration ...................................................................................................................................................................21

9.1.4 Preamble (setup state) ............................................................................................................................................21

9.1.5 Test execution ..................................................................................................................................................................21

9.1.6 Postamble............................................................................................................................................................................21

9.2 [RMI-CT_FREQ-2] Test for registration and login support ............................................................................21

9.2.1 Overview ..............................................................................................................................................................................21

9.2.2 Test purpose .....................................................................................................................................................................21

9.2.3 Configuration ...............................................................

...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.